Analysis of Fees for Connecting the Infrastructure of Generally Accessible Charging Stations to Networks with Rated Voltage not Higher than 1 KV
17 avr. 2021
À propos de cet article
Publié en ligne: 17 avr. 2021
Pages: 107 - 114
Reçu: 12 nov. 2020
Accepté: 07 déc. 2020
DOI: https://doi.org/10.21307/acee-2021-010
Mots clés
© 2019 Anna Ślęzak published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 1.
![The characteristic of an actual domestic electricity market (https://www.enea.pl/pl/grupaenea/o-grupie/informacje-o-enea/otoczenie-rynkowe) [11]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/6470702c83f1392090d6982f/j_acee-2021-010_fig_001.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250907%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250907T184143Z&X-Amz-Expires=3600&X-Amz-Signature=e61b887a9e5eeec54fecff7fa58da669cd4a624c2e5faf49667664707a598cab&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Fees for connecting to the road charging infrastructure network of public transport and generally available charging stations to the network with a rated voltage not higher than 1 kV
connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
---|---|---|
IV | 7.09 | 15.56 |
V | 7.09 | 15.56 |
VI (for the newly built connection) | 7.09 | 15.56 |
VI (when connected to an existing network) | 1.97 | 1.97 |
Fees for connecting to the road charging infrastructure network of public transport and generally available charging stations to the network with rated voltage not higher than 1 kV
connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
---|---|---|
IV | 10.95 | 11.77 |
V | 10.95 | 11.77 |
VI (for the newly built connection) | 10.95 | 11.77 |
VI (when connected to an existing network) | 1.97 | 1.97 |
Connection fees for networks with a rated voltage of less than 1 kV from entities other than charging stations that have been classified as connection groups: IV, V, VI
connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
---|---|---|
IV | 43.78 | 47.09 |
V | 43.78 | 47.09 |
VI (for the newly built connection) | 43.78 | 47.09 |
VI (when connected to an existing network) | 7.88 | 7.88 |
Connection fees for networks with a rated voltage of less than 1 kV from entities other than charging stations that have been classified as connection groups: IV, V, VI, VI
connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
---|---|---|
IV | 28.36 | 62.24 |
V | 28.36 | 62.24 |
VI (for the newly built connection) | 28.36 | 62.24 |
VI (when connected to an existing network) | 7.87 | 7.87 |