[1] AbouRizk, S. (2010). Role of simulation in construction engineering and management. Journal of Construction Engineering and Management. 136 (10), 1140-53. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000220.10.1061/(ASCE)CO.1943-7862.0000220Search in Google Scholar

[2] Mariz, R. N., Picchi, F. A., Granja, A. D. & de Melo, R. S. S. (2013). Production Cells in Construction: Considering Time, Space and Information Linkages to Seek Broader Implementations. Journal of Engineering, Project, and Production Management. 3 (1), 46-55.10.32738/JEPPM.201301.0006Search in Google Scholar

[3] Tang, Y., Liu, R. & Sun, Q. (2014). Schedule control model for linear projects based on linear scheduling method and constraint programming. Automation in Construction. 37 22-37. http://dx.doi.org/10.1016/j.autcon.2013.09.008.10.1016/j.autcon.2013.09.008Search in Google Scholar

[4] Márquez, A. C. (2010). Dynamic modelling for supply chain management: dealing with frontend, back-end and integration issues. London: Springer Science & Business Media.Search in Google Scholar

[5] Galić, M., Dolaček-Alduk, Z. & Završki, I. (2013). The importance of additional criteria in solving transportation problem. In Creative Construction Conference 2013, (219 - 29). Budapest: Diamond Congress, Ltd.Search in Google Scholar

[6] Galić, M. & Kraus, I. (2016). Web-mapping discrete simulation model for solving routing and material network flow problems in construction projects. In 8th International Scientific Conference of Civil Engineering and Architecture for PhD Students and Young Scientists below 35 years old, Košice, Slovakia: Technical University of Košice, Faculty of Civil Engineering.Search in Google Scholar

[7] Hitchcock, F. L. (1941). The distribution of a product from several sources to numerous localities. J Math phys. 20 (2), 224-30. http://dx.doi.org/10.1002/sapm1941201224.10.1002/sapm1941201224Search in Google Scholar

[8] Dantzig, G. B. & Ramser, J. H. (1959). The truck dispatching problem. Management Science. 6 (1), 80-91. http://dx.doi.org/10.1287/mnsc.6.1.80.10.1287/mnsc.6.1.80Search in Google Scholar

[9] Baldacci, R., Battarra, M. & Vigo, D. (2008). Routing a heterogeneous fleet of vehicles. In Golden, B., Raghavan, S. & Wasil, E. (Eds.), The vehicle routing problem: latest advances and new challenges (3-27). Springer.10.1007/978-0-387-77778-8_1Search in Google Scholar

[10] Kwan, M.-K. (1962). Graphic programming using odd or even points. Chinese Math. 1 (110), 273-7.Search in Google Scholar

[11] Orloff, C. (1974). A fundamental problem in vehicle routing. Networks. 4 (1), 35-64. http://dx.doi.org/10.1002/net.3230040105.10.1002/net.3230040105Search in Google Scholar

[12] Frederickson, G. N., Hecht, M. S. & Kim, C. E. (1976). Approximation algorithms for some routing problems. In 17th Annual Symposium on Foundations of Computer Science, (216-27). Houston: IEEE.10.1109/SFCS.1976.6Search in Google Scholar

[13] Golden, B. L. & Wong, R. T. (1981). Capacitated arc routing problems. Networks. 11 (3), 305-15. http://dx.doi.org./10.1002/net.3230110308.10.1002/net.3230110308Search in Google Scholar

[14] Asbach, L., Dorndorf, U. & Pesch, E. (2009). Analysis, modeling and solution of the concrete delivery problem. European Journal of Operational Research. 193 (3), 820-35. http://dx.doi.org/10.1016/j.ejor.2007.11.011.10.1016/j.ejor.2007.11.011Search in Google Scholar

[15] Schmid, V., Doerner, K. F., Hartl, R. F. & Salazar-González, J.-J. (2010). Hybridization of very large neighborhood search for ready-mixed concrete delivery problems. Computers & Operations Research. 37 (3), 559-74. http://dx.doi.org/10.1016/j.cor.2008.07.010.10.1016/j.cor.2008.07.010Search in Google Scholar

[16] Maghrebi, M., Waller, T. S. & Sammut, C. Scheduling concrete delivery problems by a robust meta heuristic method. In Modelling Symposium (EMS), 2013 European, (375-80). IEEE.10.1109/EMS.2013.64Search in Google Scholar

[17] Maghrebi, M., Travis Waller, S. & Sammut, C. (2014). Sequential Meta-Heuristic Approach for Solving Large-Scale Ready-Mixed Concrete-Dispatching Problems. Journal of Computing in Civil Engineering. 30 (1), http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000453.10.1061/(ASCE)CP.1943-5487.0000453Search in Google Scholar

[18] Maghrebi, M., Travis Waller, S. & Sammut, C. (2014). Assessing the accuracy of expert-based decisions in dispatching ready mixed concrete. Journal of Construction Engineering and Management. 140 (6), 06014004. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000853.10.1061/(ASCE)CO.1943-7862.0000853Search in Google Scholar

[19] Galić, M., Završki, I. & Dolaček-Alduk, Z. (2016). Scenario simulation model for optimized allocation of construction machinery. Građevinar. 68 (02), 105-12. http://dx.doi.org/10.14256/JCE.1462.2015.10.14256/JCE.1462.2015Search in Google Scholar

[20] Galić, M., Thronicke, R., Schreck, B. M., Feine, I. & Bargstädt, H.-J. (2015). Process modeling and scenario simulation in construction using Enterprise Dynamics simulation software. e-GFOS. 10 (1), 22-9. http://dx.doi.org/10.13167/2015.10.3.10.13167/2015.10.3Search in Google Scholar

[21] Weber, J. (2008). Simulation von Logistikprozessen auf Baustellen auf Basis von 3D-CAD Daten. Dotrmund, Germany.Search in Google Scholar

[22] INCONTROL Simulation Solutions (2014). Enterprise Dynamics [computer software]. The Netherlands: INCONTROL Simulation Solutions.Search in Google Scholar

[23] Google Inc. Google Maps. https://www.google.hr/maps/@45.5720848,18.604127,12z/data=!3m1!4b1!4m2!6m1!1szI3BNYVBM EqA.kmtD-GzDJCMs?hl=hr. (2.2.2016.) Search in Google Scholar