1. bookVolume 25 (2017): Edition 4 (December 2017)
Détails du magazine
License
Format
Magazine
eISSN
2450-5781
Première parution
30 Mar 2017
Périodicité
4 fois par an
Langues
Anglais
Accès libre

The Evaluation of Efficiency of the Use of Machine Working Time in the Industrial Company – Case Study

Publié en ligne: 23 Sep 2017
Volume & Edition: Volume 25 (2017) - Edition 4 (December 2017)
Pages: 241 - 245
Reçu: 01 Apr 2017
Accepté: 01 Aug 2017
Détails du magazine
License
Format
Magazine
eISSN
2450-5781
Première parution
30 Mar 2017
Périodicité
4 fois par an
Langues
Anglais

[1] M. Brzeziński, Organization and control of production. Design of production systems, production control processes. Warszawa: Placet, 2002.Search in Google Scholar

[2] W.M. Grudziński and I.K. Hajduk, Methods of design of management systems. Warszawa: Difin, 2004.Search in Google Scholar

[3] K. Antosz and D. Stadnicka, „Evaluation measures of machine operation effectiveness in large enterprises: study results”, Eksploatacja i Niezawodność – Maintenance and Reliability, vol. 17, no. 1, pp. 107-117, 2015.10.17531/ein.2015.1.15Search in Google Scholar

[4] M. Konstanciak and A. Konstanciak, „Evaluation of Technological Efficiency of Machines Used in Polish Steel Works”, Acta Metall. Slov. Conf., Tatranska Lomnica, Slovakia, vol. 1, no. 4, pp. 206-209, 2010.Search in Google Scholar

[5] J. Selejdak, M. Konstanciak and K. Mielczarek, „Evaluation of technological efficiency and up-to-dateness of machines used in building industry”, in Operating efficiency and machines modernity, S. Borkowski and J. Selejdak, Eds. Sisak: Endi Miletić, 2010, pp. 33-46.Search in Google Scholar

[6] S. Borkowski, M. Ingaldi and M. Jagusiak-Kocik, „The Use of 3X3 Matrix to Evaluate a Manufacturing Technology of Chosen Metal Company”, Management Systems in Production Engineering, vol. 15, no. 3, pp. 121-125, 2014.Search in Google Scholar

[7] R. Singh, D.B. Shah, A.M. Gohil and M.H. Shah, „Overall equipment efficiency (OEE) Calculation – Automation through Hardware & Software Development”, Procedia Engineering, vol. 51, pp. 579-584, 2013.10.1016/j.proeng.2013.01.082Search in Google Scholar

[8] Information materials from Company X – 2016 - un-published.Search in Google Scholar

[9] D. Lyczba, “The use of Lean Manufacturing to the improve of the production process on the example of the company working in the automotive industry”, Eng. thesis, Czestochowa University of Technology, Faculty of Production Engineering and Materials Technology, Częstochowa, Poland, 2016.Search in Google Scholar

Articles recommandés par Trend MD

Planifiez votre conférence à distance avec Sciendo