Importance of Results Obtained from Geotechnical Monitoring for Evaluation of Reinforced Soil Structure – Case Study

 et    | 11 juin 2016
À propos de cet article

Citez

In the case of realized geotechnical monitoring (GTM) of reinforced retaining wall in difficult geological conditions is demonstrated the important role at realisation of transport infrastructures, which are often realized in insufficient quality due to inappropriate geotechnical parameters from survey works or not fitted well design of structure at certain conditions. This can result in large deformations of structure, or losing stability or structure life-time is very limited and remediation work is complicated and expensive. There was built on the modernized railway line Bratislava – Trenčín, closed to Zlatovce, overpass and connected road embankments on the route of first class I/61. Structure was designed as a bridge over the railway track before the northern portal of the railway tunnel Turecký vrch was open. A part of the embankment and overpass was a retaining wall reinforced by geosynthetics. The results of the geotechnical monitoring of this wall were afterwards simulated using finite element method (FEM) and results of this comparison are the scope of this article.

eISSN:
2284-7197
ISSN:
2247-3769
Langue:
Anglais