Accès libre

Analysis of Using Resources in Business Process Modeling and Simulation

À propos de cet article

Citez

[1] M. Bajec and M. Krisper, “A methodology and tool support for managing business rules in organisations,” Information Systems, vol. 30, no. 6, pp. 423-443, 2005. http://dx.doi.org/10.1016/j.is.2004.05.00310.1016/j.is.2004.05.003Search in Google Scholar

[2] M. Chinosi and A. Trombetta, “BPMN: An introduction to the standard,” Computer Standards & Interfaces, vol. 34, no. 1, pp. 124-134, 2012. http://dx.doi.org/10.1016/j.csi.2011.06.00210.1016/j.csi.2011.06.002Search in Google Scholar

[3] C. Badica and C. Fox, “Hybrid IDEF0/IDEF3 modeling of business processes: Syntax, semantics and expressiveness,” in Romanian- Austrian Workshop on Computer-Aided Verification of Information Systems, 2004, pp. 20-22.Search in Google Scholar

[4] R. M. Dijkman, M. Dumas, and C. Ouyang, “Semantics and analysis of business process models in BPMN,” Information and Software Technology, vol. 50, no. 12, pp. 1281-1294, 2008. http://dx.doi.org/10.1016/j.infsof.2008.02.00610.1016/j.infsof.2008.02.006Search in Google Scholar

[5] T. Dufresne and J. Martin, “Process modeling for e-business,” Information Systems Department, George Mason University, 2003.Search in Google Scholar

[6] L. J. Enstone and M. F. Clark, “BPMN and simulation,” Technical report, Lanner Group Limited, 2006.Search in Google Scholar

[7] A. Großkopf, “An extended resource information layer for BPMN,” Hasso-Plattner-Institute for IT Systems Engineering, University of Potsdam, 2007.Search in Google Scholar

[8] R. P. Jefferis, “Simulation of business processes,” Widener University, 2001.Search in Google Scholar

[9] K.-Y. Jeong, L. Wu, and J.-D. Hong, “IDEF method-based simulation model design and development framework,” Journal of Industrial Engineering and Management, vol. 2, no. 2, pp. 337-359, 2009. http://dx.doi.org/10.3926/jiem.2009.v2n2.p337-35910.3926/jiem.2009.v2n2.p337-359Search in Google Scholar

[10] J. Montevechi, F. Leal, A. F. de Pinho, R. F. da Silva Costa, M. L. M. de Oliveira, A. L. F. da Silva, “Conceptual modeling in simulation projects by mean adapted IDEF: An application in a Brazilian tech company,” in 2010 Winter Simulation Conference, 2010, pp. 1624-1635.10.1109/WSC.2010.5678908Search in Google Scholar

[11] M. Owen and J. Raj, “BPMN and business process management: Introduction to the new business process modeling standard,” 2003.Search in Google Scholar

[12] N. Russell, W. M. P. van der Aalst, A. H. M. ter Hofstede, and D. Edmond, “Workflow resource patterns: Identification, representation and tool support,” in 17th International Conference on Advanced Information Systems Engineering, 2005, pp. 216-232. http://dx.doi.org/10.1007/11431855_1610.1007/11431855_16Search in Google Scholar

[13] N. Russell, A. H. M. ter Hofstede, D. Edmond, and W. M. P. van der Aalst. “Workflow data patterns,” in 24th International Conference on Conceptual Modeling, 2005, pp. 353-368.10.1007/11568322_23Search in Google Scholar

[14] N. Russell, A. H. M. ter Hofstede, and N. Mulyar, “Workflow control-flow patterns: A revised view,” Technical report BPM-06-22, 2006.Search in Google Scholar

[15] N. Russell, W. M. P. van der Aalst, A. H. M. ter Hofstede, and P. Wohed, “On the suitability of UML 2.0 activity diagrams for business process modeling,” in 3rd Asia-Pacific Conference on Conceptual Modeling, vol. 53, 2006. pp. 95-104.Search in Google Scholar

[16] L. J. R. Stroppi, O. Chiotti, and P. D. Villarreal, “A BPMN 2.0 extension to define the resource perspective of business process models,” in XIV Iberoamerican Conference on Software Engineering, 2011, pp. 25-38.Search in Google Scholar

[17] N. Trcka, W. van der Aalst, and N. Sidorova, “Analyzing control-flow and data-flow in workflow processes in a unified way,” Computer science report 08-31, 2008.Search in Google Scholar

[18] W. van der Aalst, J. Nakatumba, A. Rozinat, and N. Russell, “Business process simulation: How to get it right,” BPM Center report BPM-08-07, 2008.Search in Google Scholar

[19] O. Vasilecas, A. Smaižys, and A. Rima, “Business process modeling and simulation: Hybrid method for concurrency aspect modeling,” Baltic Journal of Modern Computing, vol. 1, no. 3-4, pp. 228-243, 2013.Search in Google Scholar

[20] V. B. Vukšić, V. C. Ceric, and V. Hlupic, “Criteria for the evaluation of business process simulation tools,” Interdisciplinary Journal of Information, Knowledge & Management, vol. 2, pp. 73-88, 2007.10.28945/101Search in Google Scholar

[21] M. Weske, “Evolution of enterprise systems architectures,” in Business Process Management. Springer, 2012, pp. 25-69.10.1007/978-3-642-28616-2_2Search in Google Scholar

[22] P. Wohed, W. M. P. van der Aalst, M. Dumas, A. H. M. ter Hofstede, and N. Russell, “On the suitability of BPMN for business process modeling,” in 4th International Conference on Business Process Management, 2006, pp. 161-176. http://dx.doi.org/10.1007/11841760_1210.1007/11841760_12Search in Google Scholar

[23] P. Wohed, M. Dumas, A. H. M. Ter Hofstede, and N. Russell, “Patternbased analysis of BPMN - An extensive evaluation of the control-flow, the data and the resource perspectives,” 2005Search in Google Scholar

[24] M. zur Muehlen and M. Indulska, “Modeling languages for business processes and business rules: A representational analysis,” Information Systems, vol. 35, no. 4, pp. 379-390, 2010. http://dx.doi.org/10.1016/j.is.2009.02.00610.1016/j.is.2009.02.006Search in Google Scholar

[25] Workflow Management Coalition, “Business process simulation specification,” document number WFMC-BPSWG-2012-1, version 1.0, 2013. [Online]. Available: http://www.bpsim.org/specifications/1.0/WFMC-BPSWG-2012-01.pdf. Search in Google Scholar

eISSN:
2255-8691
Langue:
Anglais