This work is licensed under the Creative Commons Attribution 4.0 International License.
Abas, A. A., Ismail, F., & Ismail, Z. (2016). Complexity of project and impacts on preliminaries of construction project at tender stage. Paper presented at the 7th International Conference on Postgraduate Education, Universiti Teknologi MARA (UiTM), Shah Alam, Malaysia, December 1, 2016.AbasA. A.IsmailF.IsmailZ. (2016). Complexity of project and impacts on preliminaries of construction project at tender stage. Paper presented at the 7th International Conference on Postgraduate Education, Universiti Teknologi MARA (UiTM), Shah Alam, Malaysia, December1, 2016.Search in Google Scholar
Abas, A. A., Ismail, F., & Ismail, Z. (2019). Reliable description of preliminaries item using civil engineering preliminaries protocol (CEPP) in conventional contracts. In MATEC Web of Conferences, 2019. EDP Sciences, 03006.AbasA. A.IsmailF.IsmailZ. (2019). Reliable description of preliminaries item using civil engineering preliminaries protocol (CEPP) in conventional contracts. In MATEC Web of Conferences, 2019. EDP Sciences, 03006.Search in Google Scholar
Abdul-Malak, M. A., & Azhari, S. (2008). Use of historical overhead costs for estimation and control purposes. In: AEI 2008: Building Integration Solutions.Abdul-MalakM. A.AzhariS. (2008). Use of historical overhead costs for estimation and control purposes. In: AEI 2008: Building Integration Solutions.Search in Google Scholar
Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18, pp. 77-89. doi: 10.1080/014461900370979AkintoyeA. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18, pp. 77-89. 10.1080/014461900370979Open DOISearch in Google Scholar
Akintoye, A., & Fitzgerald, E. (2000). A survey of current cost estimating practices in the UK. Construction Management and Economics, 18, pp. 161-172. doi: 10.1080/014461900370799AkintoyeA.FitzgeraldE. (2000). A survey of current cost estimating practices in the UK. Construction Management and Economics, 18, pp. 161-172. 10.1080/014461900370799Open DOISearch in Google Scholar
Boone, Jr., H. N., & Boone, D. A. (2012). Analyzing Likert data. Journal of Extension, 50(2), pp. 1-6. doi: 10.34068/joe.50.02.48BooneH. N.Jr.BooneD. A. (2012). Analyzing Likert data. Journal of Extension, 50(2), pp. 1-6. 10.34068/joe.50.02.48Open DOISearch in Google Scholar
Chan, C. T. (2012). The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30, pp. 903-914. doi: 10.1080/01446193.2012.717706ChanC. T. (2012). The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30, pp. 903-914. 10.1080/01446193.2012.717706Open DOISearch in Google Scholar
Chan, C. T. W., & Pasquire, C. (2002). Estimation of project overheads: A contractor’s perspective. In: 18th Annual ARCOM Conference, pp. 2-4. Held at the University of Northumbria in Newcastle upon Tyne, United Kingdom, 2nd to 4th September 2002.ChanC. T. W.PasquireC. (2002). Estimation of project overheads: A contractor’s perspective. In: 18th Annual ARCOM Conference, pp. 2-4. Held at the University of Northumbria in Newcastle upon Tyne, United Kingdom, 2nd to 4thSeptember2002.Search in Google Scholar
Chao, L. C. (2010). Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28, pp. 287-299. doi: 10.1080/01446190903473782ChaoL. C. (2010). Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28, pp. 287-299. 10.1080/01446190903473782Open DOISearch in Google Scholar
Chao, L.-C., & Kuo, C.-P. (2016). Probabilistic approach to determining overhead-cum-markup rate in bid price. Procedia Engineering, 164, pp. 243-250. doi: 10.1016/j.proeng.2016.11.616ChaoL.-C.KuoC.-P. (2016). Probabilistic approach to determining overhead-cum-markup rate in bid price. Procedia Engineering, 164, pp. 243-250. 10.1016/j.proeng.2016.11.616Open DOISearch in Google Scholar
Chen, J. H., Yang, L. R., Chen, W., & Chang, C. (2008). Case‐based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26, pp. 805-814. doi: 10.1080/01446190802014778ChenJ. H.YangL. R.ChenW.ChangC. (2008). Case‐based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26, pp. 805-814. 10.1080/01446190802014778Open DOISearch in Google Scholar
CIOB. (2018). New Code of Estimating Practice. John Wiley & Sons, New Jersey, USA.CIOB. (2018). New Code of Estimating Practice. John Wiley & Sons, New Jersey, USA.Search in Google Scholar
Coelho, P. S., & Esteves, S. P. (2007). The choice between a fivepoint and a ten-point scale in the framework of customer satisfaction measurement. International Journal of Market Research, 49, pp. 313-339. doi: 10.1177/147078530704900305CoelhoP. S.EstevesS. P. (2007). The choice between a fivepoint and a ten-point scale in the framework of customer satisfaction measurement. International Journal of Market Research, 49, pp. 313-339. 10.1177/147078530704900305Open DOISearch in Google Scholar
Dell’isola, M. D. (2003). Detailed cost estimating. Excerpt from Architect’s Handbook of Professional Practice. pp. 1-13. J. A. Demkin (Ed.) John Wiley & Sons, New Jersey, USA.Dell’isolaM. D. (2003). Detailed cost estimating. Excerpt from Architect’s Handbook of Professional Practice. pp. 1-13. DemkinJ. A. (Ed.) John Wiley & Sons, New Jersey, USA.Search in Google Scholar
Eldosouky, I. A., Ibrahim, A. H., & Mohammed, H. E.-D. (2014). Management of construction cost contingency covering upside and downside risks. Alexandria Engineering Journal, 53, pp. 863-881. doi: 10.1016/j.aej.2014.09.008EldosoukyI. A.IbrahimA. H.MohammedH. E.-D. (2014). Management of construction cost contingency covering upside and downside risks. Alexandria Engineering Journal, 53, pp. 863-881. 10.1016/j.aej.2014.09.008Open DOISearch in Google Scholar
Enshassi, A., Abdul Aziz, A. R., & El Karriri, A. A. (2008). Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13, pp. 35-47. doi: 10.1108/13664380810882066EnshassiA.Abdul AzizA. R.El KarririA. A. (2008). Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13, pp. 35-47. 10.1108/13664380810882066Open DOISearch in Google Scholar
Erri Pradeep, A., Yiu, T., & Amor, R. (2019). Leveraging blockchain technology in a BIM workflow: A literature review. In: International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Driving Data-Informed Decision-Making, University of Cambridge, UK, ICE Publishing, pp. 371-380.Erri PradeepA.YiuT.AmorR. (2019). Leveraging blockchain technology in a BIM workflow: A literature review. In: International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Driving Data-Informed Decision-Making, University of Cambridge, UK, ICE Publishing, pp. 371-380.Search in Google Scholar
Fiolet, J.-C., Haas, C., & Hipel, K. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34, pp. 845-858. doi: 10.1080/01446193.2016.1207790FioletJ.-C.HaasC.HipelK. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34, pp. 845-858. 10.1080/01446193.2016.1207790Open DOISearch in Google Scholar
Haupt, T. C., & Pillay, K. (2016). Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14, pp. 373-419. doi: 10.1108/JEDT-07-2014-0041HauptT. C.PillayK. (2016). Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14, pp. 373-419. 10.1108/JEDT-07-2014-0041Open DOISearch in Google Scholar
Hesami, S., & Lavasani, S. A. (2014). Identifying and classifying effective factors affecting overhead costs in constructing projects in Iran. International Journal of Construction Engineering and Management, 3, pp. 24-41. doi: 10.5923/j. ijcem.20140301.03.HesamiS.LavasaniS. A. (2014). Identifying and classifying effective factors affecting overhead costs in constructing projects in Iran. International Journal of Construction Engineering and Management, 3, pp. 24-41. 10.5923/j. ijcem.20140301.03.Open DOISearch in Google Scholar
Hicks, J. C. (1992). Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118, pp. 545-560. doi: 10.1061/(ASCE)0733-9364(1992)118:3(545)HicksJ. C. (1992). Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118, pp. 545-560. 10.1061/(ASCE)0733-9364(1992)118:3(545)Open DOISearch in Google Scholar
Hills, R., & Lee, S. (2024). Willis’s Elements of Quantity Surveying. John Wiley & Sons, New Jersey, USA.HillsR.LeeS. (2024). Willis’s Elements of Quantity Surveying. John Wiley & Sons, New Jersey, USA.Search in Google Scholar
Jaya, N. M., & Frederika, A. (2015). An identification of construction project overheads for sustainable cost management and controlling practices (CMCPs). Applied Mechanics and Materials, 776, pp. 121-126. doi: 10.4028/www.scientific.net/AMM.776.121JayaN. M.FrederikaA. (2015). An identification of construction project overheads for sustainable cost management and controlling practices (CMCPs). Applied Mechanics and Materials, 776, pp. 121-126. 10.4028/www.scientific.net/AMM.776.121Open DOISearch in Google Scholar
Leśniak, A. (2013). The application of artificial neural networks in indirect cost estimation. In: AIP Conference Proceedings. American Institute of Physics, pp. 1312-1315.LeśniakA. (2013). The application of artificial neural networks in indirect cost estimation. In: AIP Conference Proceedings. American Institute of Physics, pp. 1312-1315.Search in Google Scholar
Leśniak, A., & Juszczyk, M. (2018). Prediction of site overhead costs with the use of artificial neural network based model. Archives of Civil and Mechanical Engineering, 18, pp. 973-982. doi: 10.1016/j.acme.2018.01.014LeśniakA.JuszczykM. (2018). Prediction of site overhead costs with the use of artificial neural network based model. Archives of Civil and Mechanical Engineering, 18, pp. 973-982. 10.1016/j.acme.2018.01.014Open DOISearch in Google Scholar
Nabil, I., & El-Riyati, A. (2015). An overhead costs assessment for construction projects at Gaza Strip. American Journal of Civil Engineering, 3, pp. 95-101. doi: 10.11648/j.ajce.20150304.11NabilI.El-RiyatiA. (2015). An overhead costs assessment for construction projects at Gaza Strip. American Journal of Civil Engineering, 3, pp. 95-101. 10.11648/j.ajce.20150304.11Open DOISearch in Google Scholar
Naderi, M., Nazari, A., Shafaat, A., & Abrishami, S. (2024). Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment. 14(3), pp. 758-775. doi: 10.1108/SASBE-07-2023-0180.NaderiM.NazariA.ShafaatA.AbrishamiS. (2024). Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment. 14(3), pp. 758-775. 10.1108/SASBE-07-2023-0180.Open DOISearch in Google Scholar
Odeyinka, H. A., & Yusif, A. (2003). An assessment of the accuracy of quantity surveyors’ preliminary cost estimates in Nigeria. Construction Engineering, 18, pp. 33-38.OdeyinkaH. A.YusifA. (2003). An assessment of the accuracy of quantity surveyors’ preliminary cost estimates in Nigeria. Construction Engineering, 18, pp. 33-38.Search in Google Scholar
Plebankiewicz, E., & Leśniak, A. (2013). Overhead costs and profit calculation by Polish contractors. Technological and Economic Development of Economy, 19, pp. 141-161. doi: 10.3846/20294913.2012.763008PlebankiewiczE.LeśniakA. (2013). Overhead costs and profit calculation by Polish contractors. Technological and Economic Development of Economy, 19, pp. 141-161. 10.3846/20294913.2012.763008Open DOISearch in Google Scholar
Pradeep, P., Seneviratne, L. I. P., Rathnayake, U., & Melagoda, D. (2018). Impact of using minimum preliminary items for building works in Sri Lankan construction industry.PradeepP.SeneviratneL. I. P.RathnayakeU.MelagodaD. (2018). Impact of using minimum preliminary items for building works in Sri Lankan construction industry.Search in Google Scholar
Saini, A., Khursheed, S., Paul, V. K., & Kumar, K. (2021). Analysis of indirect cost of construction projects in India. International Journal of Sustainable Building Technology, 4, pp. 9-23. doi: 10.37628/ijsdt.v4i2.864SainiA.KhursheedS.PaulV. K.KumarK. (2021). Analysis of indirect cost of construction projects in India. International Journal of Sustainable Building Technology, 4, pp. 9-23. 10.37628/ijsdt.v4i2.864Open DOISearch in Google Scholar
Shittu, A. A., Idiake, J. E., Akanmu, W. P., & Mac-Barango, D. O. (2022). Effect of cost of scaffolding on cost of preliminaries in multi-storey building projects in Abuja, Nigeria.ShittuA. A.IdiakeJ. E.AkanmuW. P.Mac-BarangoD. O. (2022). Effect of cost of scaffolding on cost of preliminaries in multi-storey building projects in Abuja, Nigeria.Search in Google Scholar
Singla, H. K., & Sridharan, S. (2022). Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29, pp. 4040-4060. doi: 10.1108/ECAM-04-2021-0362SinglaH. K.SridharanS. (2022). Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29, pp. 4040-4060. 10.1108/ECAM-04-2021-0362Open DOISearch in Google Scholar
Šiškina, A., Juodis, A., & Apanavičiene, R. (2009). Evaluation of the competitiveness of construction company overhead costs. Journal of Civil Engineering and Management, 15, pp. 215-224. doi: 10.3846/1392-3730.2009.15.215-224ŠiškinaA.JuodisA.ApanavičieneR. (2009). Evaluation of the competitiveness of construction company overhead costs. Journal of Civil Engineering and Management, 15, pp. 215-224. 10.3846/1392-3730.2009.15.215-224Open DOISearch in Google Scholar
Sullivan, G. M., & Artino, Jr., A. R. (2013). Analyzing and interpreting data from Likert-type scales. Journal of Graduate Medical Education, 5(4), pp. 541-542. doi: 10.4300/JGME-5-4-18SullivanG. M.ArtinoA. R.Jr. (2013). Analyzing and interpreting data from Likert-type scales. Journal of Graduate Medical Education, 5(4), pp. 541-542. 10.4300/JGME-5-4-18Open DOISearch in Google Scholar
Vaz-Serra, P., & Mitcheltree, H. (2020). Understanding the key master of construction project management graduate competencies required to meet industry needs in Australia. International Journal of Construction Education and Research, 17(3), pp. 222-241. doi: 10.1080/15578771.2020.1739177Vaz-SerraP.MitcheltreeH. (2020). Understanding the key master of construction project management graduate competencies required to meet industry needs in Australia. International Journal of Construction Education and Research, 17(3), pp. 222-241. 10.1080/15578771.2020.1739177Open DOISearch in Google Scholar