Acceso abierto

Challenges in pricing preliminaries costs for contractors: An Australian case study

 y   
16 jul 2025

Cite
Descargar portada

Abas, A. A., Ismail, F., & Ismail, Z. (2016). Complexity of project and impacts on preliminaries of construction project at tender stage. Paper presented at the 7th International Conference on Postgraduate Education, Universiti Teknologi MARA (UiTM), Shah Alam, Malaysia, December 1, 2016. Abas A. A. Ismail F. Ismail Z. ( 2016 ). Complexity of project and impacts on preliminaries of construction project at tender stage . Paper presented at the 7th International Conference on Postgraduate Education , Universiti Teknologi MARA (UiTM) , Shah Alam, Malaysia , December 1 , 2016 . Search in Google Scholar

Abas, A. A., Ismail, F., & Ismail, Z. (2019). Reliable description of preliminaries item using civil engineering preliminaries protocol (CEPP) in conventional contracts. In MATEC Web of Conferences, 2019. EDP Sciences, 03006. Abas A. A. Ismail F. Ismail Z. ( 2019 ). Reliable description of preliminaries item using civil engineering preliminaries protocol (CEPP) in conventional contracts . In MATEC Web of Conferences , 2019 . EDP Sciences , 03006 . Search in Google Scholar

Abdul-Malak, M. A., & Azhari, S. (2008). Use of historical overhead costs for estimation and control purposes. In: AEI 2008: Building Integration Solutions. Abdul-Malak M. A. Azhari S. ( 2008 ). Use of historical overhead costs for estimation and control purposes . In: AEI 2008: Building Integration Solutions . Search in Google Scholar

Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18, pp. 77-89. doi: 10.1080/014461900370979 Akintoye A. ( 2000 ). Analysis of factors influencing project cost estimating practice . Construction Management and Economics , 18 , pp. 77 - 89 . 10.1080/014461900370979 Open DOISearch in Google Scholar

Akintoye, A., & Fitzgerald, E. (2000). A survey of current cost estimating practices in the UK. Construction Management and Economics, 18, pp. 161-172. doi: 10.1080/014461900370799 Akintoye A. Fitzgerald E. ( 2000 ). A survey of current cost estimating practices in the UK . Construction Management and Economics , 18 , pp. 161 - 172 . 10.1080/014461900370799 Open DOISearch in Google Scholar

Boone, Jr., H. N., & Boone, D. A. (2012). Analyzing Likert data. Journal of Extension, 50(2), pp. 1-6. doi: 10.34068/joe.50.02.48 Boone H. N. Jr. Boone D. A. ( 2012 ). Analyzing Likert data . Journal of Extension , 50 ( 2 ), pp. 1 - 6 . 10.34068/joe.50.02.48 Open DOISearch in Google Scholar

Chan, C. T. (2012). The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30, pp. 903-914. doi: 10.1080/01446193.2012.717706 Chan C. T. ( 2012 ). The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach . Construction Management and Economics , 30 , pp. 903 - 914 . 10.1080/01446193.2012.717706 Open DOISearch in Google Scholar

Chan, C. T. W., & Pasquire, C. (2002). Estimation of project overheads: A contractor’s perspective. In: 18th Annual ARCOM Conference, pp. 2-4. Held at the University of Northumbria in Newcastle upon Tyne, United Kingdom, 2nd to 4th September 2002. Chan C. T. W. Pasquire C. ( 2002 ). Estimation of project overheads: A contractor’s perspective . In: 18th Annual ARCOM Conference , pp. 2 - 4 . Held at the University of Northumbria in Newcastle upon Tyne , United Kingdom , 2nd to 4th September 2002 . Search in Google Scholar

Chao, L. C. (2010). Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28, pp. 287-299. doi: 10.1080/01446190903473782 Chao L. C. ( 2010 ). Estimating project overheads rate in bidding: DSS approach using neural networks . Construction Management and Economics , 28 , pp. 287 - 299 . 10.1080/01446190903473782 Open DOISearch in Google Scholar

Chao, L.-C., & Kuo, C.-P. (2016). Probabilistic approach to determining overhead-cum-markup rate in bid price. Procedia Engineering, 164, pp. 243-250. doi: 10.1016/j.proeng.2016.11.616 Chao L.-C. Kuo C.-P. ( 2016 ). Probabilistic approach to determining overhead-cum-markup rate in bid price . Procedia Engineering , 164 , pp. 243 - 250 . 10.1016/j.proeng.2016.11.616 Open DOISearch in Google Scholar

Chen, J. H., Yang, L. R., Chen, W., & Chang, C. (2008). Case‐based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26, pp. 805-814. doi: 10.1080/01446190802014778 Chen J. H. Yang L. R. Chen W. Chang C. ( 2008 ). Case‐based allocation of onsite supervisory manpower for construction projects . Construction Management and Economics , 26 , pp. 805 - 814 . 10.1080/01446190802014778 Open DOISearch in Google Scholar

CIOB. (2018). New Code of Estimating Practice. John Wiley & Sons, New Jersey, USA. CIOB . ( 2018 ). New Code of Estimating Practice . John Wiley & Sons , New Jersey, USA . Search in Google Scholar

Coelho, P. S., & Esteves, S. P. (2007). The choice between a fivepoint and a ten-point scale in the framework of customer satisfaction measurement. International Journal of Market Research, 49, pp. 313-339. doi: 10.1177/147078530704900305 Coelho P. S. Esteves S. P. ( 2007 ). The choice between a fivepoint and a ten-point scale in the framework of customer satisfaction measurement . International Journal of Market Research , 49 , pp. 313 - 339 . 10.1177/147078530704900305 Open DOISearch in Google Scholar

Dell’isola, M. D. (2003). Detailed cost estimating. Excerpt from Architect’s Handbook of Professional Practice. pp. 1-13. J. A. Demkin (Ed.) John Wiley & Sons, New Jersey, USA. Dell’isola M. D. ( 2003 ). Detailed cost estimating . Excerpt from Architect’s Handbook of Professional Practice . pp. 1 - 13 . Demkin J. A. (Ed.) John Wiley & Sons , New Jersey, USA . Search in Google Scholar

Eldosouky, I. A., Ibrahim, A. H., & Mohammed, H. E.-D. (2014). Management of construction cost contingency covering upside and downside risks. Alexandria Engineering Journal, 53, pp. 863-881. doi: 10.1016/j.aej.2014.09.008 Eldosouky I. A. Ibrahim A. H. Mohammed H. E.-D. ( 2014 ). Management of construction cost contingency covering upside and downside risks . Alexandria Engineering Journal , 53 , pp. 863 - 881 . 10.1016/j.aej.2014.09.008 Open DOISearch in Google Scholar

Enshassi, A., Abdul Aziz, A. R., & El Karriri, A. A. (2008). Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13, pp. 35-47. doi: 10.1108/13664380810882066 Enshassi A. Abdul Aziz A. R. El Karriri A. A. ( 2008 ). Investigating the overhead costs in construction projects in Palestine . Journal of Financial Management of Property and Construction , 13 , pp. 35 - 47 . 10.1108/13664380810882066 Open DOISearch in Google Scholar

Erri Pradeep, A., Yiu, T., & Amor, R. (2019). Leveraging blockchain technology in a BIM workflow: A literature review. In: International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Driving Data-Informed Decision-Making, University of Cambridge, UK, ICE Publishing, pp. 371-380. Erri Pradeep A. Yiu T. Amor R. ( 2019 ). Leveraging blockchain technology in a BIM workflow: A literature review . In: International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Driving Data-Informed Decision-Making , University of Cambridge , UK, ICE Publishing , pp. 371 - 380 . Search in Google Scholar

Fiolet, J.-C., Haas, C., & Hipel, K. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34, pp. 845-858. doi: 10.1080/01446193.2016.1207790 Fiolet J.-C. Haas C. Hipel K. ( 2016 ). Risk-chasing behaviour in on-site construction decisions . Construction Management and Economics , 34 , pp. 845 - 858 . 10.1080/01446193.2016.1207790 Open DOISearch in Google Scholar

Haupt, T. C., & Pillay, K. (2016). Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14, pp. 373-419. doi: 10.1108/JEDT-07-2014-0041 Haupt T. C. Pillay K. ( 2016 ). Investigating the true costs of construction accidents . Journal of Engineering, Design and Technology , 14 , pp. 373 - 419 . 10.1108/JEDT-07-2014-0041 Open DOISearch in Google Scholar

Hesami, S., & Lavasani, S. A. (2014). Identifying and classifying effective factors affecting overhead costs in constructing projects in Iran. International Journal of Construction Engineering and Management, 3, pp. 24-41. doi: 10.5923/j. ijcem.20140301.03. Hesami S. Lavasani S. A. ( 2014 ). Identifying and classifying effective factors affecting overhead costs in constructing projects in Iran . International Journal of Construction Engineering and Management , 3 , pp. 24 - 41 . 10.5923/j. ijcem.20140301.03 . Open DOISearch in Google Scholar

Hicks, J. C. (1992). Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118, pp. 545-560. doi: 10.1061/(ASCE)0733-9364(1992)118:3(545) Hicks J. C. ( 1992 ). Heavy construction estimates, with and without computers . Journal of Construction Engineering and Management , 118 , pp. 545 - 560 . 10.1061/(ASCE)0733-9364(1992)118:3(545) Open DOISearch in Google Scholar

Hills, R., & Lee, S. (2024). Willis’s Elements of Quantity Surveying. John Wiley & Sons, New Jersey, USA. Hills R. Lee S. ( 2024 ). Willis’s Elements of Quantity Surveying . John Wiley & Sons , New Jersey, USA . Search in Google Scholar

Jaya, N. M., & Frederika, A. (2015). An identification of construction project overheads for sustainable cost management and controlling practices (CMCPs). Applied Mechanics and Materials, 776, pp. 121-126. doi: 10.4028/www.scientific.net/AMM.776.121 Jaya N. M. Frederika A. ( 2015 ). An identification of construction project overheads for sustainable cost management and controlling practices (CMCPs) . Applied Mechanics and Materials , 776 , pp. 121 - 126 . 10.4028/www.scientific.net/AMM.776.121 Open DOISearch in Google Scholar

Leśniak, A. (2013). The application of artificial neural networks in indirect cost estimation. In: AIP Conference Proceedings. American Institute of Physics, pp. 1312-1315. Leśniak A. ( 2013 ). The application of artificial neural networks in indirect cost estimation . In: AIP Conference Proceedings . American Institute of Physics , pp. 1312 - 1315 . Search in Google Scholar

Leśniak, A., & Juszczyk, M. (2018). Prediction of site overhead costs with the use of artificial neural network based model. Archives of Civil and Mechanical Engineering, 18, pp. 973-982. doi: 10.1016/j.acme.2018.01.014 Leśniak A. Juszczyk M. ( 2018 ). Prediction of site overhead costs with the use of artificial neural network based model . Archives of Civil and Mechanical Engineering , 18 , pp. 973 - 982 . 10.1016/j.acme.2018.01.014 Open DOISearch in Google Scholar

Nabil, I., & El-Riyati, A. (2015). An overhead costs assessment for construction projects at Gaza Strip. American Journal of Civil Engineering, 3, pp. 95-101. doi: 10.11648/j.ajce.20150304.11 Nabil I. El-Riyati A. ( 2015 ). An overhead costs assessment for construction projects at Gaza Strip . American Journal of Civil Engineering , 3 , pp. 95 - 101 . 10.11648/j.ajce.20150304.11 Open DOISearch in Google Scholar

Naderi, M., Nazari, A., Shafaat, A., & Abrishami, S. (2024). Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment. 14(3), pp. 758-775. doi: 10.1108/SASBE-07-2023-0180. Naderi M. Nazari A. Shafaat A. Abrishami S. ( 2024 ). Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling . Smart and Sustainable Built Environment . 14 ( 3 ), pp. 758 - 775 . 10.1108/SASBE-07-2023-0180 . Open DOISearch in Google Scholar

Odeyinka, H. A., & Yusif, A. (2003). An assessment of the accuracy of quantity surveyors’ preliminary cost estimates in Nigeria. Construction Engineering, 18, pp. 33-38. Odeyinka H. A. Yusif A. ( 2003 ). An assessment of the accuracy of quantity surveyors’ preliminary cost estimates in Nigeria . Construction Engineering , 18 , pp. 33 - 38 . Search in Google Scholar

Plebankiewicz, E., & Leśniak, A. (2013). Overhead costs and profit calculation by Polish contractors. Technological and Economic Development of Economy, 19, pp. 141-161. doi: 10.3846/20294913.2012.763008 Plebankiewicz E. Leśniak A. ( 2013 ). Overhead costs and profit calculation by Polish contractors . Technological and Economic Development of Economy , 19 , pp. 141 - 161 . 10.3846/20294913.2012.763008 Open DOISearch in Google Scholar

Pradeep, P., Seneviratne, L. I. P., Rathnayake, U., & Melagoda, D. (2018). Impact of using minimum preliminary items for building works in Sri Lankan construction industry. Pradeep P. Seneviratne L. I. P. Rathnayake U. Melagoda D. ( 2018 ). Impact of using minimum preliminary items for building works in Sri Lankan construction industry . Search in Google Scholar

Saini, A., Khursheed, S., Paul, V. K., & Kumar, K. (2021). Analysis of indirect cost of construction projects in India. International Journal of Sustainable Building Technology, 4, pp. 9-23. doi: 10.37628/ijsdt.v4i2.864 Saini A. Khursheed S. Paul V. K. Kumar K. ( 2021 ). Analysis of indirect cost of construction projects in India . International Journal of Sustainable Building Technology , 4 , pp. 9 - 23 . 10.37628/ijsdt.v4i2.864 Open DOISearch in Google Scholar

Shittu, A. A., Idiake, J. E., Akanmu, W. P., & Mac-Barango, D. O. (2022). Effect of cost of scaffolding on cost of preliminaries in multi-storey building projects in Abuja, Nigeria. Shittu A. A. Idiake J. E. Akanmu W. P. Mac-Barango D. O. ( 2022 ). Effect of cost of scaffolding on cost of preliminaries in multi-storey building projects in Abuja , Nigeria . Search in Google Scholar

Singla, H. K., & Sridharan, S. (2022). Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29, pp. 4040-4060. doi: 10.1108/ECAM-04-2021-0362 Singla H. K. Sridharan S. ( 2022 ). Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation . Engineering, Construction and Architectural Management , 29 , pp. 4040 - 4060 . 10.1108/ECAM-04-2021-0362 Open DOISearch in Google Scholar

Šiškina, A., Juodis, A., & Apanavičiene, R. (2009). Evaluation of the competitiveness of construction company overhead costs. Journal of Civil Engineering and Management, 15, pp. 215-224. doi: 10.3846/1392-3730.2009.15.215-224 Šiškina A. Juodis A. Apanavičiene R. ( 2009 ). Evaluation of the competitiveness of construction company overhead costs . Journal of Civil Engineering and Management , 15 , pp. 215 - 224 . 10.3846/1392-3730.2009.15.215-224 Open DOISearch in Google Scholar

Sullivan, G. M., & Artino, Jr., A. R. (2013). Analyzing and interpreting data from Likert-type scales. Journal of Graduate Medical Education, 5(4), pp. 541-542. doi: 10.4300/JGME-5-4-18 Sullivan G. M. Artino A. R. Jr. ( 2013 ). Analyzing and interpreting data from Likert-type scales . Journal of Graduate Medical Education , 5 ( 4 ), pp. 541 - 542 . 10.4300/JGME-5-4-18 Open DOISearch in Google Scholar

Vaz-Serra, P., & Mitcheltree, H. (2020). Understanding the key master of construction project management graduate competencies required to meet industry needs in Australia. International Journal of Construction Education and Research, 17(3), pp. 222-241. doi: 10.1080/15578771.2020.1739177 Vaz-Serra P. Mitcheltree H. ( 2020 ). Understanding the key master of construction project management graduate competencies required to meet industry needs in Australia . International Journal of Construction Education and Research , 17 ( 3 ), pp. 222 - 241 . 10.1080/15578771.2020.1739177 Open DOISearch in Google Scholar

Idioma:
Inglés
Calendario de la edición:
1 veces al año
Temas de la revista:
Ingeniería, Introducciones y reseñas, Ingeniería, otros