This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Asgari, S., Awwad, R., Kandil, A., & Odeh, I. (2016). Impact of considering need for work and risk on performance of construction contractors: An agent-based approach. Automation in Construction, 65, pp. 9–20. doi: 10.1016/j.autcon.2016.01.004AsgariS.AwwadR.KandilA.OdehI.2016Impact of considering need for work and risk on performance of construction contractors: An agent-based approach6592010.1016/j.autcon.2016.01.004Open DOISearch in Google Scholar
Banaitiene, N., & Banaitis, A. (2006). Analysis of criteria for contractors’ qualification evaluation. Technological and Economic Development of Economy, 12(4), pp. 276–282.BanaitieneN.BanaitisA.2006Analysis of criteria for contractors’ qualification evaluation12427628210.3846/13928619.2006.9637754Search in Google Scholar
Costantino, F., Di Gravio, G., & Nonino, F. (2015). Project selection in project portfolio management: An artificial neural network model based on critical success factors. International Journal of Project Management, 33(8), pp. 1744–1754. doi: 10.1016/j.ijproman.2015.07.003CostantinoF.Di GravioG.NoninoF.2015Project selection in project portfolio management: An artificial neural network model based on critical success factors3381744175410.1016/j.ijproman.2015.07.003Open DOISearch in Google Scholar
Eastman, C. M. (2018). Building Product Models: Computer Environments, Supporting Design and Construction. CRC Press, Boca Raton.EastmanC. M.2018CRC PressBoca Raton10.1201/9781315138671Search in Google Scholar
Huang, X. (2011). An analysis of the selection of project contractor in the construction management process. International Journal of Business and Management, 6(3), p. 184. doi: 10.5539/ijbm.v6n3p184HuangX.2011An analysis of the selection of project contractor in the construction management process6318410.5539/ijbm.v6n3p184Open DOISearch in Google Scholar
Ikediashi, D. I., Ogunlana, S. O., & Alotaibi, A. (2014). Analysis of project failure factors for infrastructure projects in Saudi Arabia: A multivariate approach. Journal of Construction in Developing Countries, 19(1), p. 35.IkediashiD. I.OgunlanaS. O.AlotaibiA.2014Analysis of project failure factors for infrastructure projects in Saudi Arabia: A multivariate approach19135Search in Google Scholar
Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment. International Journal of Project Management, 33(1), pp. 126–139. doi: 10.1016/j.ijproman.2014.03.002KaiserM. G.El ArbiF.AhlemannF.2015Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment33112613910.1016/j.ijproman.2014.03.002Open DOISearch in Google Scholar
Lin, J. H., & Yang, C. J. (2016). Applying analytic network process to the selection of construction projects. Open Journal of Social Sciences, 4(3), p. 41. doi: 10.4236/jss.2016.43007LinJ. H.YangC. J.2016Applying analytic network process to the selection of construction projects434110.4236/jss.2016.43007Open DOISearch in Google Scholar
Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), pp. 446–457. doi: 10.1016/j.ijproman.2014.08.007MokK. Y.ShenG. Q.YangJ.2015Stakeholder management studies in mega construction projects: A review and future directions33244645710.1016/j.ijproman.2014.08.007Open DOISearch in Google Scholar
Oakland, J. S., & Marosszeky, M. (2017). Total Construction Management: Lean Quality in Construction Project Delivery. Routledge, USA.OaklandJ. S.MarosszekyM.2017RoutledgeUSA10.4324/9781315694351Search in Google Scholar
Olaniran, O. J. (2015). The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235–251. doi: 10.1108/jfmpc-06-2014-0008OlaniranO. J.2015The effects of cost-based contractor selection on construction project performance20323525110.1108/jfmpc-06-2014-0008Open DOISearch in Google Scholar
Ozcelik, M. (2016). Criteria for the selection of construction method at the Ovit Mountain Tunnel (Turkey). KSCE Journal of Civil Engineering, 20(4), pp. 1323–1328. doi: 10.1007/s12205-015-0055-3OzcelikM.2016Criteria for the selection of construction method at the Ovit Mountain Tunnel (Turkey)2041323132810.1007/s12205-015-0055-3Open DOISearch in Google Scholar
Parvan, K., Rahmandad, H., & Haghani, A. (2015). Inter-phase feedbacks in construction projects. Journal of Operations Management, 39, pp. 48–62. doi: 10.1016/j.jom.2015.07.005ParvanK.RahmandadH.HaghaniA.2015Inter-phase feedbacks in construction projects39486210.1016/j.jom.2015.07.005Open DOISearch in Google Scholar
Pekuri, A., Pekuri, L., & Haapasalo, H. (2015). Business models and project selection in construction companies. Construction Innovation, 15(2), pp. 180–197.PekuriA.PekuriL.HaapasaloH.2015Business models and project selection in construction companies15218019710.1108/CI-12-2013-0055Search in Google Scholar
Rejment, M., & Dziadosz, A. (2014). Selected aspects of construction projects selection including risk estimation. Czasopismo Techniczne, 1-B(5), pp. 221–228.RejmentM.DziadoszA.2014Selected aspects of construction projects selection including risk estimation1-B5221228Search in Google Scholar
Sheng, Z. (2018). Fundamental principles behind the theory of mega infrastructure construction management. In: Fundamental Theories of Mega Infrastructure Construction Management. Springer, Cham, pp. 135–183. doi: 10.1007/978-3-319-61974-3_6ShengZ.2018Fundamental principles behind the theory of mega infrastructure construction managementIn:SpringerCham13518310.1007/978-3-319-61974-3_6Open DOISearch in Google Scholar
Taylan, O., Bafail, A. O., Abdulaal, R. M., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, pp. 105–116. doi: 10.1016/j.asoc.2014.01.003TaylanO.BafailA. O.AbdulaalR. M.KabliM. R.2014Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies1710511610.1016/j.asoc.2014.01.003Open DOISearch in Google Scholar
Turner, J. R. (2004). Five necessary conditions for project success. International Journal of Project Management, 5(22), pp. 349–350.TurnerJ. R.2004Five necessary conditions for project success52234935010.1016/j.ijproman.2004.02.001Search in Google Scholar
Walker, A. (2015). Project Management in Construction. John Wiley and Sons, Hong Kong.WalkerA.2015John Wiley and SonsHong KongSearch in Google Scholar
Wanous, M., Boussabaine, A. A., & Lewis, J. (2000). To bid or not to bid: A parametric solution. Construction Management and Economics, 18(4), pp. 457–466.WanousM.BoussabaineA. A.LewisJ.2000To bid or not to bid: A parametric solution18445746610.1080/01446190050024879Search in Google Scholar