Validation of transient time method to calibrate oil flow meters in closed conduits using 123I as the radiotracer
, y
08 jun 2021
Acerca de este artículo
Categoría del artículo: Original Paper
Publicado en línea: 08 jun 2021
Páginas: 69 - 74
Recibido: 20 mar 2020
Aceptado: 19 nov 2020
DOI: https://doi.org/10.2478/nuka-2021-0009
Palabras clave
© 2021 Eduardo R. Gonçalves et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Fig. 1

Fig. 2

Fig. 3

Fig. 4

Mean flow velocity (in cm/s) for injections T1, T2, and T3, and RV = 1000 L/h (Reynolds number = 10 107)
Injection | D1D2 | D1D3 | D1D4 | D2D3 | D2D4 | D3D4 | VM |
---|---|---|---|---|---|---|---|
T1 | 97.26 | 96.95 | 98.89 | 97.14 | 97.78 | 97.08 | 97.52 |
T2 | 96.86 | 98.22 | 97.13 | 96.99 | 98.08 | 97.68 | 97.49 |
T3 | 98.46 | 97.21 | 98.09 | 97.39 | 97.01 | 97.95 | 97.69 |
Mean velocity | 97.57 ± 0.31 cm/s | ||||||
Oil flow rate | 1001.14 ± 8.16 L/h |
Relationship between flow measurement data
RV ± 0.25% (L/h) | rv% | Percent error | |
---|---|---|---|
800 | 797.72 ± 6.57 | 0.824 | 0.28 |
950 | 944.84 ± 7.56 | 0.800 | 0.54 |
1000 | 1001.14 ± 8.16 | 0.815 | 0.11 |
Mean flow velocity (in cm/s) for injections T1, T2, and T3, and RV = 950 L/h (Reynolds number = 9600)
Injection | D1D2 | D1D3 | D1D4 | D2D3 | D2D4 | D3D4 | VM |
---|---|---|---|---|---|---|---|
T1 | 93.16 | 90.07 | 92.24 | 91.85 | 93.87 | 91.12 | 92.04 |
T2 | 93.11 | 91.02 | 91.02 | 91.12 | 92.23 | 92.85 | 92.01 |
T3 | 93.07 | 90.47 | 91.92 | 93.09 | 93.89 | 90.86 | 92.50 |
Mean velocity | 92.18 ± 0.26 cm/s | ||||||
Oil flow rate | 944.84 ± 7.56 L/h |
Pipeline scan in the measurement positions using a 241Am gamma source
Total gamma-ray counts | ||||
---|---|---|---|---|
Position D1 | Position D2 | Position D3 | Position D4 | |
Vertical | 8188 ± 90 | 8194 ± 90 | 8209 ± 91 | 8175 ± 90 |
Horizontal | 8002 ± 89 | 8000 ± 89 | 8001 ± 90 | 7990 ± 89 |
The yield of 123I oil labelling process
Sample | WLS-1A | WLS-1B | OLS-2 | WLS-3A | WLS-3B | OLS-3A | OLS-3B |
---|---|---|---|---|---|---|---|
Yield (%) | 7.81 | 5.12 | 88.74 | 0.44 | 0.38 | 85.46 | 84.92 |
Mean flow velocity (in cm/s) for injections T1, T2, and T3, and RV = 800 L/h (Reynolds number = 8085)
Injection | D1D2 | D1D3 | D1D4 | D2D3 | D2D4 | D3D4 | VM |
---|---|---|---|---|---|---|---|
T1 | 76.95 | 78.36 | 77.53 | 77.59 | 76.87 | 77.87 | 77.53 |
T2 | 76.89 | 77.99 | 78.09 | 77.87 | 78.22 | 77.96 | 77.84 |
T3 | 76.83 | 78.39 | 77.60 | 77.99 | 78.14 | 78.19 | 77.86 |
Mean velocity | 77.74 ± 0.27 cm/s | ||||||
Oil flow rate | 797.72 ± 6.57 L/h |