This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
Love, P.E.D., et al., The costs of rework: insights from construction and opportunities for learning. Production Planning and Control, 2018. 29(13): p. 1082-1095.Search in Google Scholar
Josephson, P.-E. and Y. Hammarlund, Causes and costs of defects in construction a study of seven building projects. Automation in construction, 1999. 8(6): p. 681-687.Search in Google Scholar
Mohamed Hassan, A., S.M. Renuka, and T. Monika, Analysis of factors causing rework and their mitigation strategies in construction projects. Materials Today: Proceedings, 2023.Search in Google Scholar
Olanrewaju, A.L. and A.H.J. Lee, Investigation of the poor-quality practices on building construction sites in Malaysia. Organization, Technology and Management in Construction, 2022. 14(1): p. 2583-2600.Search in Google Scholar
Lambers, R., et al., Key residential construction defects: a framework for their identification and correlated causes. Construction Innovation, 2023.Search in Google Scholar
Asadi, R., S. Wilkinson, and J.O.B. Rotimi, The common causes of rework in construction contracts: a diagnostic approach. Journal of Engineering, Design and Technology, 2021.Search in Google Scholar
Trach, R., K. Pawluk, and M. Lendo-Siwicka, Causes of Rework in Construction Projects in Ukraine. Archives of Civil Engineering, 2019. 65(3): p. 61-74.Search in Google Scholar
Venkatesh, M.P., S.M. Renuka, and C. Umarani, Causes of delay in Indian construction industry. Vol. 174. 2012, Department of Civil Engineering, Anna University, Chennai-600025, India. 2768-2773.Search in Google Scholar
Igwe, C., F. Nasiri, and A. Hammad, An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 2022. 29(10): p. 4088-4106.Search in Google Scholar
Hoque, M.I., et al., Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 2023. 41(2): p. 401-421.Search in Google Scholar
Safapour, E., et al., Exploratory Analysis of Human-, Organizational-, and Project-Based Reworks: Challenges and Strategies. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2022. 14(1).Search in Google Scholar
Asadi, R., J.O.B. Rotimi, and S. Wilkinson, Investigating the Relationship between Reworks and Contractual Claims: The Salience of Contract Conditions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2022. 14(1).Search in Google Scholar
Neale, J. and A. Gurmu, Production pressures in the building sector of the construction industry: a systematic review of literature. Journal of Engineering, Design and Technology, 2022. 20(6): p. 1412-1429.Search in Google Scholar
Björk, F., et al., Testimonials About Damages in Construction Resulting in Need for Rework – Cases in Sweden - Part 2. Nordic Concrete Research, 2025.Search in Google Scholar
Hassan, O.A.B. and R. Anderstedt, Estimation of drying time of fresh concrete slabs: a comparative study. Journal of Engineering, Design and Technology, 2017. 15(2): p. 134-148.Search in Google Scholar
Kalbe, K., et al., Wetting circumstances, expected moisture content, and drying performance of CLT end-grain edges based on field measurements and laboratory analysis. Building and Environment, 2022. 221.Search in Google Scholar
SafeWater, Säker vatteninstallation; Safe water installaton, in www.sakervatten.se. 2023: Swedish trade organisation for Safe Water installations. In Swedish.Search in Google Scholar
Aljassmi, H.A. and S. Han, Classification and occurrence of defective acts in residential construction projects. Journal of Civil Engineering and Management, 2014. 20(2): p. 175-185.Search in Google Scholar