This work is licensed under the Creative Commons Attribution 4.0 International License.
Kafuku, J.M., 2019. Factors for effective implementation of lean manufacturing practice in selected industries in Tanzania. Procedia Manufacturing, 33, pp. 351-358. [https://doi.org/10.1016/j.promfg.2019.04.043]Search in Google Scholar
Nakajima, S., 1988. Introduction to TPM: Total Productive Maintenance. Cambridge, Mass: Productivity Press.Search in Google Scholar
Junior, R.G.P., Inácio, R.H., da Silva, I.B., Hassui, A. and Barbosa, G.F., 2022. A novel framework for single-minute exchange of die (SMED) assisted by lean tools. International Journal of Advanced Manufacturing Technology. Volume 119, pp. 6469-6487 [https://doi.org/10.1007/s00170-021-08534-w]Search in Google Scholar
Liker, J.K., 2004. The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer. New York: McGraw-Hill. ISBN 0071392319.Search in Google Scholar
Frank, G., Sturgeon, T.J., Benitez, G.B., Marodin, G.A. and Ferreira e Cunha, S., 2025. How Lean and Industry 4.0 affect worker outcomes and operational performance: A quantitative assessment of competing models. International Journal of Production Economics, 279, 109475. [https://www.sciencedirect.com/science/article/pii/S0925527324003323]Search in Google Scholar
Jonsson, P. and Lesshammar, M., 1999. Evaluation and improvement of manufacturing performance measurement systems – the role of OEE. International Journal of Operations & Production Management, 19(1), pp. 55-78. [https://doi.org/10.1108/01443579910244223]Search in Google Scholar
Engelmann, B., Schmitt, S., Miller, E., Bräutigam, V. and Schmitt, J., 2020. Advances in machine learning detecting changeover processes in cyber physical production systems. Journal of Manufacturing and Materials Processing, Volume 4(4). [https://doi.org/10.3390/jmmp4040108]Search in Google Scholar
Kang, N., Zhao, C., Li, J. and Horst, J.A., 2016. A hierarchical structure of key performance indicators for operation management and continuous improvement in production systems. International Journal of Production Research, Volume 54(22), pp. 6333-6350. [https://doi.org/10.1080/00207543.2015.1136082]Search in Google Scholar
Muchiri, P. and Pintelon, L., 2008. Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussion. International Journal of Production Research, Volume 46(13), pp. 3517-3535. [https://doi.org/10.1080/00207540601142645]Search in Google Scholar
Becker, J.M.J., Borst, J. and van der Veen, A., 2015. Improving the overall equipment effectiveness in high-mix-low-volume manufacturing environments. CIRP Annals, 64, pp. 419-422. [https://doi.org/10.1016/j.cirp.2015.04.126]Search in Google Scholar
Bhade, S. and Hegde, S., 2020. Improvement of Overall Equipment Efficiency of Machine by SMED. Procedia Manufacturing, 24(2), pp. 463-472. [https://doi.org/10.1016/j.matpr.2020.04.298]Search in Google Scholar
Sousa, E., Silva, F.J.G., Ferreira, L.P., Pereira, M.T., Gouveia, R. and Silva, R.P., 2018. Applying SMED methodology in cork stoppers production. Procedia Manufacturing, 17, pp. 611-622. [https://doi.org/10.1016/j.promfg.2018.10.103]Search in Google Scholar
Rosa, C., Silva, F.J.G., Ferreira, L.P. and Campilho, R., 2017. SMED methodology: the reduction of setup times for Steel Wire-Rope assembly lines in the automotive industry. Procedia Manufacturing, 13, pp. 1034-1042. [https://doi.org/10.1016/j.promfg.2017.09.110]Search in Google Scholar
Antoniolli, I., Guariente, P., Pereira, T., Ferreira, L.P. and Silva, F.J.G., 2017. Standardization and optimization of an automotive components production line. Procedia Manufacturing, 13, pp. 1120-1127. [https://doi.org/10.1016/j.promfg.2017.09.173]Search in Google Scholar
Vieira, A.M., Silva, F.J.G., Campilho, R.D.S.G., Ferreira, L.P., Sá, J.C. and Pereira, T., 2020. SMED methodology applied to the deep drawing process in the automotive industry. Procedia Manufacturing, 51, pp. 1416-1422. [https://doi.org/10.1016/j.promfg.2020.10.197]Search in Google Scholar
Ferradás, P.G. and Salonitis, K., 2013. Improving changeover time: A tailored SMED approach for welding cells. Procedia CIRP, 7, pp. 598-603. [https://doi.org/10.1016/j.procir.2013.06.039]Search in Google Scholar
Antosz, K. and Pacana, A., 2018. Comparative analysis of the implementation of the SMED method on selected production stands. Technical Gazette, 25(Suppl. 2), pp. 276-282. [https://doi.org/10.17559/TV-20160411095705]Search in Google Scholar
Khakpour, R., Ebrahimi, A. And Seyed-Hosseini, S.-M., 2024. “SMED 4.0: a development of single minute exchange of die in the era of Industry 4.0 technologies to improve sustainability. Journal of Manufacturing Technology Management, Vol. 35 No. 3, pp. 568-589. [https://doi.org/10.1108/JMTM-08-2023-0333]Search in Google Scholar
Komendák, M., 2024. Application of the SMED Method to Improve the Efficiency of Production Equipment Changeovers: Master’s Thesis. Zvolen: Technical University in Zvolen, Faculty of Technology.Search in Google Scholar
IPA Slovakia, 2017. SMED. Blog article, 24 February. Available at: https://www.ipaslovakia.sk/clanok/smed [Accessed 29 April 2023].Search in Google Scholar
Boledovič, L., 2017. PDCA Cycle. Blog article, 25 February. Available at: https://www.ipaslovakia.sk/clanok/pdca-cyklus [Accessed 29 January 2024].Search in Google Scholar
Burieta, J., 2017. 5S Method – Standardisation and Visualisation. Blog article, 25 February. Available at: https://www.ipaslovakia.sk/clanok/5s-metoda [Accessed 29 April 2023].Search in Google Scholar
LeanProduction, 2024. Lean Manufacturing. [online] Available at: https://www.leanproduction.com/ [Accessed 3 March 2024].Search in Google Scholar