[Ambrožič, T., Turk, G., 2003. Prediction of subsidence due to underground mining by artificial neural networks. Computers & Geosciences, 29(5), pp. 627-637.10.1016/S0098-3004(03)00044-X]Search in Google Scholar
[Gueno Consulting Engineers (GCE) - Ben Project Structural Consulting Engineers, January 2012.]Search in Google Scholar
[Habibi, A., 2010. Crossing the collapse aquifer area (Emamzadeh Hashem (AS) Episode One Variant Project, Khatam Al-Anbia Construction Headquarter Publication, Qorb Nuh (AS), first edition.]Search in Google Scholar
[Kim, C.Y., Bae, G.J., Hong, S.W., Park, C.H., Moon, H.K., Shin, H.S., 2001. Neural network based prediction of ground surface settlements due to tunneling. Computers and Geotechnics, 28(6-7), pp.517-547.10.1016/S0266-352X(01)00011-8]Search in Google Scholar
[Kim, K. D., Lee, S., Oh, H. J. 2009. Prediction of ground subsidence in Samcheok City, Korea using artificial neural networks and GIS. Environmental Geology, 58(1), pp. 61-70.]Search in Google Scholar
[Lee, S., Park, I., Choi, J. K. 2012. Spatial prediction of ground subsidence susceptibility using an artificial neural network. Environmental management, 49(2), pp. 347-358.]Search in Google Scholar
[Neaupane, K.M., Adhikari, N.R., 2006. Prediction of tunneling-induced ground movementwith the multi-layer perceptron. Tunnelling and Underground Space Technology, 21, pp. 151–159.10.1016/j.tust.2005.07.001]Search in Google Scholar
[Santos Jr, O. J., Celestino, T. B., 2008. Artificial neural networks analysis of Sao Paulo subway tunnel settlement data. Tunnelling and underground space technology, 23(5), pp. 481-491.10.1016/j.tust.2007.07.002]Search in Google Scholar
[Sou-Sen, L., Hsien-Chuang, L., 2004. Neural-network-based regression model of ground surface settlement induced by deep excavation. Automation in construction, 13(3), pp. 279-289.10.1016/S0926-5805(03)00018-9]Search in Google Scholar
[Supplementary Report on Geotechnical Studies of Tabriz Subway 8 Stations and Tunnel Episode 9 6 of Line 1, National Construction - Engineers Company]Search in Google Scholar
[Suwansawat, S., Einstein, H. H., 2006. Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling. Tunnelling and underground space technology, 21(2), pp. 133-150.10.1016/j.tust.2005.06.007]Search in Google Scholar