Acceso abierto

Investigation of factors responsible for delays in the execution of adequately funded construction projects


Cite

Al-Joburi, A. I., Al-Aomar, R., & Bahri, M. E. (2012). Analyzing the impact of negative cash flow on construction performance in the Dubai area. Journal of Management in Engineering, October. doi: 10.1061/(ASCE)ME.1943-5479.0000123 Search in Google Scholar

Babatunde, S. O., Opawole, A., & Ujadughe, I. C. (2010). An appraisal of project procurement methods in the Nigerian construction industry. Civil Engineering Dimension, 12(1), 1-7. doi: 10.9744/ced.12.1.1-7 Search in Google Scholar

Day, J., & Bobeva, M. (2005). A generic toolkit for the successful management of Delphi studies. The Electronic Journal of Business Research Methodology, 3(2), 103-116. Search in Google Scholar

Deep, S., Bilal, M., & Ahmad, S. (2017). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), 28-33. Search in Google Scholar

Doloi, H. (2009). Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), 1245-126. doi: 10.1080/01446190903394541 Search in Google Scholar

Durdyev, S., & Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business, 13(1), 20-46. doi: 10.1108/IJMPB-09-2018-0178 Search in Google Scholar

Förster, B., & Gracht, H. V. (2014). Assessing Delphi panel composition for strategic foresight — a comparison of panels based on company-internal and external participants. Technological Forecasting & Social Change, 84, 215-229. doi: 10.1016/j.techfore.2013.07.012 Search in Google Scholar

Franklin, K. J., & Hart, K. (2007). Idea generation and exploration: benefits and limitations of the Policy Delphi research method. Innovative Higher Education, 31, 237-246. doi: 10.1007/s10755-006-9022-8 Search in Google Scholar

Fugar, F. D. K., & Agyakwah-Baah, A. B. (2010). Delays in building construction projects in Ghana. Australian Journal of Construction Economics and Building, 10(1-2), 102-116. doi: 10.5130/AJCEB.v10i1-2.1592 Search in Google Scholar

Hasson, F., Keeney, S., & McKenna, H. (2000). Research guidelines for the Delphi survey. Journal of Advanced Nursing, 32, 1008-1015. doi: 10.1046/j.1365-2648.2000.t01-1-01567.x Search in Google Scholar

Indhu, B., & Ajai, P. (2014). Study of delay management in a construction project – a case study. International Journal of Emerging Technology and Advanced Engineering, 4(5), 108-113. doi: 10.1.1.643.8673 Search in Google Scholar

Jafari, A. (2013). A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), 746-760. doi: 10.1080/01446193.2013.825045 Search in Google Scholar

Jefferies, M., Brewer, G. J., & Gajendran, T. (2014). Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), 465-480. doi: 10.1108/ECAM-01-2012-0007 Search in Google Scholar

Kamau, C. G., & Mohamed, H. B. (2015). Efficacy of Monitoring and Evaluation Function in Achieving Project Success in Kenya: A Conceptual Framework. Science Journal of Business and Management, 3(3), 2015, 82-94. doi: 10.11648/j.sjbm.20150303.14 Search in Google Scholar

Magondu, A. (2013). Factors influencing implementation of monitoring and evaluation in HIV research projects, a case of Kenya Aids Vaccine Initiative (Kavi). Master’s dissertation. University of Nairobi, Kenya. Retrieved from http://erepository.uonbi.ac.ke:8080/xmlui/handle/123456789/56377 Search in Google Scholar

Olatunji, S. O. (2019). Drivers of timely payment in public building projects in Nigeria. FUTA Journal of Engineering and Engineering Technology, 13(2), 158-171. Search in Google Scholar

Omopariola, E. D., Windapo, A., Edwards, D. J., & Thwala, W. D. (2020). Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), 308-325. doi: 10.1108/JEDT-04-2019-0099 Search in Google Scholar

Pourrashidi, R., Mehranpour, M., & Nick, M. F. (2017). Human resources management: challenges and solutions. Helix, 8, 998-1001. doi: 10.29042/2017-998-1001 Search in Google Scholar

Sekayi, D., & Kennedy, A. (2017). Qualitative Delphi method: a four-round process with a worked example. The Qualitative Report, 22(10), 2755-2763. Search in Google Scholar

Steinerowska-Streb, I., & Głód. G. (2020). Innovations in Polish family firms. Exploring employee creativity and management practices that stimulate innovative thinking. Journal of Entrepreneurship, Management and Innovation, 16(1), 231-260. doi: 10.7341/20201628 Search in Google Scholar

Turkar, P., & Apte, M. R. (2016). Delay causes and importance of corrective actions on them. International Research Journal of Engineering and Technology, 3(6), 863-866. Search in Google Scholar

Yalini, R., & Alan, S. (2015). Study on identification of delay factors in construction project in Tamilnadu. International Journal of Science and Engineering Research, 3(5), 3221-3224. Search in Google Scholar

Yin, R. K. (2014). Case study research – design and methods. 5th ed. Singapore: SAGE. Search in Google Scholar

Zamojska, A., & Próchniak, J. (2017). Measuring the Social Impact of Infrastructure Projects: The Case of Gdańsk International Fair Co. Journal of Entrepreneurship, Management and Innovation, 14(4), 25-42. doi: 10.7341/20171342 Search in Google Scholar

Zayed, T., & Liu, Y. (2014). Cash flow modelling for construction projects. Engineering, Construction and Architectural Management, 21(2), 170-189. doi: 10.1108/ECAM-08-2012-0082 Search in Google Scholar