Reliability Assessment for Auxiliary Power Supply System of a Nuclear Power Plant Based on the Monte Carlo Simulation
y
16 nov 2023
Acerca de este artículo
Publicado en línea: 16 nov 2023
Páginas: 9 - 19
Recibido: 21 mar 2023
Aceptado: 15 may 2023
DOI: https://doi.org/10.2478/bipie-2022-0013
Palabras clave
© 2022 Mihai-Alexandru Ghidu et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Ghidu, Mihai-Alexandru
“Gheorghe Asachi” Technical University of Iași, Faculty of Electrical EngineeringIași, Romania
Nemeş, Ciprian
“Gheorghe Asachi” Technical University of Iași, Faculty of Electrical EngineeringIași, Romania