Del Pico, W. J. (2023). Project control: Integrating cost and schedule in construction. John Wiley & Sons.Del PicoW. J. (2023). Project control: Integrating cost and schedule in construction. John Wiley & Sons.Search in Google Scholar
Rashid, H. A., Al-juboori, O. A., & Mahjoob, A. M. R. M. R. (2021). New cost control techniques in mega construction projects. Periodicals of Engineering and Natural Sciences (PEN), 9(2), 454-461.RashidH. A.Al-jubooriO. A.MahjoobA. M. R. M. R. (2021). New cost control techniques in mega construction projects. Periodicals of Engineering and Natural Sciences (PEN), 9(2), 454-461.Search in Google Scholar
Ahmed, A. A. A., Ashour, M. A. H., & Al-Dahhan, I. A. (2020). Using modified earned value for cost control in construction projects. Periodicals of Engineering and Natural Sciences (PEN), 8(1), 156-168.AhmedA. A. A.AshourM. A. H.Al-DahhanI. A. (2020). Using modified earned value for cost control in construction projects. Periodicals of Engineering and Natural Sciences (PEN), 8(1), 156-168.Search in Google Scholar
Yilmaz, S., Kumar, D., Hada, S., Demirkesen, S., Zhang, C., & Li, H. (2024). A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 1-15.YilmazS.KumarD.HadaS.DemirkesenS.ZhangC.LiH. (2024). A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 1-15.Search in Google Scholar
Abbas, N. N., & Burhan, A. M. (2022). Investigating the causes of poor cost control in Iraqi construction projects. Engineering, Technology & Applied Science Research, 12(1), 8075-8079.AbbasN. N.BurhanA. M. (2022). Investigating the causes of poor cost control in Iraqi construction projects. Engineering, Technology & Applied Science Research, 12(1), 8075-8079.Search in Google Scholar
Ali, L. T., Abid Ali, R. S., & Khaled, Z. S. (2020). Investigation of Cost-Influencing Factors Potentially Controllable by Main Contractors in Construction Projects in Iraq. Engineering and Technology Journal, 38(7A), 1069-1076.AliL. T.Abid AliR. S.KhaledZ. S. (2020). Investigation of Cost-Influencing Factors Potentially Controllable by Main Contractors in Construction Projects in Iraq. Engineering and Technology Journal, 38(7A), 1069-1076.Search in Google Scholar
Durdyev, S. (2021). Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), 1241-1260.DurdyevS. (2021). Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), 1241-1260.Search in Google Scholar
Kurniawan, M. I., Wulandari, D. A. R., & Tistogondo, J. (2021). Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method. Neutron, 21(1), 20-26.KurniawanM. I.WulandariD. A. R.TistogondoJ. (2021). Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method. Neutron, 21(1), 20-26.Search in Google Scholar
Liao, K., Zhang, M., & Zhang, H. (2024). Implications for cost management analysis of new green building materials in the context of low-carbon economy: a critical review in China. Journal of Building Design and Environment, 3(2).LiaoK.ZhangM.ZhangH. (2024). Implications for cost management analysis of new green building materials in the context of low-carbon economy: a critical review in China. Journal of Building Design and Environment, 3(2).Search in Google Scholar
Qi, Y., Chang, S., Ji, Y., & Qi, K. (2018). BIM-based incremental cost analysis method of prefabricated buildings in China. Sustainability, 10(11), 4293.QiY.ChangS.JiY.QiK. (2018). BIM-based incremental cost analysis method of prefabricated buildings in China. Sustainability, 10(11), 4293.Search in Google Scholar
Liu, Y., Chang, R. D., Zuo, J., Xiong, F., & Dong, N. (2023). What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), 805-832.LiuY.ChangR. D.ZuoJ.XiongF.DongN. (2023). What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), 805-832.Search in Google Scholar
Mansur, S. A., Zin, R. M., & Linbo, L. (2019, September). Components of cost overrun in China construction projects. In IOP Conference Series: Materials Science and Engineering (Vol. 620, No. 1, p. 012081). IOP Publishing.MansurS. A.ZinR. M.LinboL. (2019, September). Components of cost overrun in China construction projects. In IOP Conference Series: Materials Science and Engineering (Vol. 620, No. 1, p. 012081). IOP Publishing.Search in Google Scholar
Hwang, B. G., Shan, M., Zhu, L., & Lim, W. C. (2020). Cost control in megaprojects: efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), 437-449.HwangB. G.ShanM.ZhuL.LimW. C. (2020). Cost control in megaprojects: efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), 437-449.Search in Google Scholar
Wu, H., Qian, Q. K., Straub, A., & Visscher, H. J. (2022). Factors influencing transaction costs of prefabricated housing projects in China: developers’ perspective. Engineering, Construction and Architectural Management, 29(1), 476-501.WuH.QianQ. K.StraubA.VisscherH. J. (2022). Factors influencing transaction costs of prefabricated housing projects in China: developers’ perspective. Engineering, Construction and Architectural Management, 29(1), 476-501.Search in Google Scholar
Li, Y. (2018, July). Research on construction projects cost management. In IOP Conference Series: Materials Science and Engineering (Vol. 394, No. 3, p. 032057). IOP Publishing.LiY. (2018, July). Research on construction projects cost management. In IOP Conference Series: Materials Science and Engineering (Vol. 394, No. 3, p. 032057). IOP Publishing.Search in Google Scholar
Li, X., Wang, C., & Alashwal, A. (2021). Case study on BIM and value engineering integration for construction cost control. Advances in Civil Engineering, 2021(1), 8849303.LiX.WangC.AlashwalA. (2021). Case study on BIM and value engineering integration for construction cost control. Advances in Civil Engineering, 2021(1), 8849303.Search in Google Scholar
Nabawy, M., & Khodeir, L. M. (2020). A systematic review of quantitative risk analysis in construction of mega projects. Ain Shams Engineering Journal, 11(4), 1403-1410.NabawyM.KhodeirL. M. (2020). A systematic review of quantitative risk analysis in construction of mega projects. Ain Shams Engineering Journal, 11(4), 1403-1410.Search in Google Scholar
Olatunde, N. A., & Alao, O. O. (2017). Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), 619-634.OlatundeN. A.AlaoO. O. (2017). Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), 619-634.Search in Google Scholar
Sepasgozar, S. M., Costin, A. M., Karimi, R., Shirowzhan, S., Abbasian, E., & Li, J. (2022). BIM and digital tools for state-of-the-art construction cost management. Buildings, 12(4), 396.SepasgozarS. M.CostinA. M.KarimiR.ShirowzhanS.AbbasianE.LiJ. (2022). BIM and digital tools for state-of-the-art construction cost management. Buildings, 12(4), 396.Search in Google Scholar
Liu, Q. H., & Cao, Q. (2024). Dynamic control method of construction cost based on fuzzy neural network. Automatika, 65(4), 1339-1349.LiuQ. H.CaoQ. (2024). Dynamic control method of construction cost based on fuzzy neural network. Automatika, 65(4), 1339-1349.Search in Google Scholar
Jiajia Xin,Zhi Wang,Xu Hao,Xiaoye Qi,Yongjie Wang & Baogang Wen. (2024). Dynamic Characteristics Analysis of Cylindrical Roller Bearing with Dimensional Deviations in Cage Pocket. Applied Sciences(20),9433-9433.JiajiaXinZhiWangXuHaoXiaoyeQiYongjieWangBaogangWen (2024). Dynamic Characteristics Analysis of Cylindrical Roller Bearing with Dimensional Deviations in Cage Pocket. Applied Sciences(20),9433-9433.Search in Google Scholar
Natalie M Scala,Vincent Schiavone,Hylton Olivieri,Olli Seppänen,Thais da C L Alves,Min Liu & Ariovaldo Denis Granja. (2023). Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States. Engineering Management Journal(3),237-256.Natalie MScalaVincentSchiavoneHyltonOlivieriOlliSeppänenThais da C LAlvesMinLiuAriovaldo DenisGranja (2023). Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States. Engineering Management Journal(3),237-256.Search in Google Scholar
Mullapudi Durga Sruthi & Achuthan Aravindan. (2020). Performance measurement of schedule and cost analysis by using earned value management for a residential building. Materials Today: Proceedings(P1), 524-532.Mullapudi DurgaSruthiAchuthanAravindan (2020). Performance measurement of schedule and cost analysis by using earned value management for a residential building. Materials Today: Proceedings(P1), 524-532.Search in Google Scholar