[Ekama GA, Marais GvR (1979): Dynamic behavior of the activated sludge process. J Water Pollut Control Fed, 51, 534.]Search in Google Scholar
[Henze M, Grady CPL, Gujer W, Marais GvR, Matsuo T (1986): Activated sludge model No. 1, IAWPRC Task Group on Mathematical Modelling for Design and Operation of Biological Wastewater Treatment. IAWPRC London, Report July 1986.]Search in Google Scholar
[Henze M, Grady CPL, Gujer W, Marais GvR, Matsuo T (1987): Activated sludge model No. 1, IAWQ Scientific and Technical report. No. 1, IAWPRC, London. ISSN: 1010-707X.]Search in Google Scholar
[Holba M (2003): Využiti vysledků laboratornich kinetickych měřeni a matematickeho modelovani pro zlepšeni funkce ČOV s technologiemi odstraňovani nutrietů (PhD Thesis). VŠCHT, Praha, FTVP.]Search in Google Scholar
[ifak (2009). SIMBA 6 Retrieved 27 November 2009 from: http://www.ifak-system.com/products/simulation-software/wastewatersimulation/simba-6.html.]Search in Google Scholar
[Mejier SCF, van Loosdrecht MCM, Heijen JJ (2001). Metabolic modelling of full-scale biological nitrogen and phosphorus removing, WWTP’s Water Res. 34 (14), 2711-2723.]Search in Google Scholar
[Roeleveld PJ, van Loosdrecht MCM (2001): Experiences with guidelines for wastewater characterization in The Netherlands. In Activated Sludge Modelling Fifth Kollekolle Seminar 2001: Modelling of Activated Sludge Processes in Theory and Practise, Denmark, 10-12 September 2001. 121-129.]Search in Google Scholar