Optimization Method of Equipment Maintenance Resource Scheduling Based on Hidden Semi-Markov Model
, , y
21 feb 2022
Acerca de este artículo
Publicado en línea: 21 feb 2022
Páginas: 23 - 31
DOI: https://doi.org/10.21307/ijanmc-2021-013
Palabras clave
© 2021 Pengrui Wang et al; published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Wang, Pengrui
School of Computer Science and Engineering Xi’an Technological UniversityXi’an, China
Liu, Bailin
School of Computer Science and Engineering Xi’an Technological UniversityXi’an, China
Zhao, Tao
Northwest Institute of Mechanical and Electrical Engineering XianyangXianyang, China
Cao, Pengxiang
School of Electronic Information Engineering Xi’an Technological UniversityXi’an, China