Investigating multi-objective time, cost, and risk problems using the Grey Wolf Optimization algorithm


Cite

Safety plays a crucial role in construction projects. Safety risks encompass potential hazards such as work accidents, injuries, and security. Consequently, it is important to effectively manage these risks with equal emphasis on time and cost considerations during the project planning phase. Within the scope of this research, the grid and archive-based Grey Wolf Optimizer (GWO) algorithm was employed to investigate multi-objective time-cost-risk problems. By employing the GWO, multiple Pareto solutions were provided to the decision-maker, facilitating improved decision-making. It was determined that the GWO algorithm yields better results in time-cost-risk problems compared to the Particle Swarm Optimization (PSO) and Differential Evolution (DE) algorithms.

eISSN:
2544-963X
Idioma:
Inglés
Calendario de la edición:
Volume Open
Temas de la revista:
Architecture and Design, other, Engineering, Civil Engineering, Materials, Environmental Engineering