Cite

Ahmad, I., & Minkarah, I. (1988). Questionnaire survey on bidding in construction. Journal of Management in Engineering, 4(3), 229-243. doi:10.1061/(ASCE)9742-597X(1988)4:3(229)10.1061/(ASCE)9742-597X(1988)4:3(229)Search in Google Scholar

Bageis, S., & Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27, 53-71. doi: 10.1080/0144619080259622010.1080/01446190802596220Search in Google Scholar

Benjamin, N. B. H., & Meador, R. C. (1979). Comparison of Friedman and Gates competitive bidding models. ASCE Journal of the Construction Division, 105(1), 25-40.10.1061/JCCEAZ.0000821Search in Google Scholar

Best, R. J. (1997). Market-Based Management Strategies for growing customer value and profitability. New Jersey, USA: Prentice Hall.Search in Google Scholar

Brook, M. (2011). Estimating and Tendering for Construction Work. 4th Ed. Abingdon, Great Britain: Spon Press.Search in Google Scholar

Carr, R. I. (1982). General Bidding Model. Journal of the Construction Division, 108(4), 639-650.10.1061/JCCEAZ.0001070Search in Google Scholar

Cartlidge, D. (2013). Estimator’s Pocket Book. Abingdon, Great Britain: Routledge.10.4324/9780203579091Search in Google Scholar

Chua, D., & Li, D. (2000). Key Factors in Bid Reasoning Model. Journal of Construction Engineering and Management, 126(5), 349-357. doi:10.1061/(ASCE)0733-9364(2000)126:5(349)10.1061/(ASCE)0733-9364(2000)126:5(349)Search in Google Scholar

Cooper, R., & Slagmulder, R. (1997). Target Costing and Value Engineering. Portland-New Jersey, USA: Productivity Press.Search in Google Scholar

Egemen, M., & Mohamed, A. N. (2008). SCBMD: A knowledge-based system software for strategically correct bid/no bid and mark-up size decisions. Automation in Construction, 17(7), 864-872. doi: 10.1016/j.autcon.2008.02.01310.1016/j.autcon.2008.02.013Search in Google Scholar

Friedman, L. (1956). A competitive bidding strategy. Operations Research, 4, 104-112.10.1287/opre.4.1.104Search in Google Scholar

Gates, M. (1967). Bidding strategies and probabilities. ASCE Journal of the Construction Division, 93(CO1), 75-107.10.1061/JCCEAZ.0000192Search in Google Scholar

Hassanein, A. G. (1996). Factors affecting the bidding behaviour of contractors in Egypt. Building Research and Information, 24(4), 228-236. doi: 10.1080/0961321960872753410.1080/09613219608727534Search in Google Scholar

Hwang, J-S., & Kim, Y-S. (2016). A bid decision-making model in the initial bidding phase for overseas construction projects. KSCE Journal of Civil Engineering, 20(4), 1189-1200. doi:10.1007/s12205-015-0760-y10.1007/s12205-015-0760-ySearch in Google Scholar

Ioannou, P. G. (1988). Bidding models – symmetry and state of information. Journal of Construction Engineering and Management, 114(2), 214-232. doi: 10.1061/(ASCE)0733-9364(1988)114:2(214)10.1061/(ASCE)0733-9364(1988)114:2(214)Search in Google Scholar

Kaka, A., Wong, C., Fortune, C., & Langford, D. (2008). Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(1), 66-77. doi: 10.1108/0969998081084207010.1108/09699980810842070Search in Google Scholar

Koksalan, M. M., Wallenius, J., & Zionts, S. (2011). Multiple Criteria Decision Making: From Early History to the 21st Century. Singapore: World Scientific.10.1142/8042Search in Google Scholar

Kou, G., Ergu, D., Peng, Y., & Shi, Y. (2013). Data processing for the AHP/ANP. Series: Quantitative Management, Vol. 1, Berlin, Germany: Springer.10.1007/978-3-642-29213-2Search in Google Scholar

Leśniak, A., & Plebankiewicz, E. (2013). Overhead costs and profit calculation by Polish contractors. Technological and Economic Development of Economy, 19(1), 141-161. doi:10.3846/20294913.2012.76300810.3846/20294913.2012.763008Search in Google Scholar

Leśniak, A., & Plebankiewicz, E. (2015). Modeling the Decision-Making Process Concerning Participation in Construction Bidding. Journal of Management in Engineering, 31(2). doi: 10.1061/(ASCE)ME.1943-5479.000023710.1061/(ASCE)ME.1943-5479.0000237Search in Google Scholar

Li, H., & Love, P. E. D. (1999). Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17, 169-76. doi: 10.1080/01446199937166410.1080/014461999371664Search in Google Scholar

Lin, C-T., & Chen, Y-T. (2004). Bid/no-bid decision-making – a fuzzy linguistic approach. International Journal of Project Management, 22(7), 585-593. doi: 10.1016/j.ijproman.2004.01.00510.1016/j.ijproman.2004.01.005Search in Google Scholar

Lowe, D. J., & Parvar, J. (2004). A logistic regression approach to modelling the contractor’s decision to bid. Construction Management and Economics, 22(6), 643-653. doi: 10.1080/0144619031000164905610.1080/01446190310001649056Search in Google Scholar

Mielec, A., Jaśkowski, P., & Biruk, S. (2009). Ustalenie wskaźnika narzutu zysku w strategii przetargowej przedsiębiorstwa budowlanego [Determining profit margins in bidding strategy of a construction enterprise]. Przegląd Budowlany, 6, 50-53.Search in Google Scholar

Mochtar, K., & Arditi, D. (2000) Alternate pricing strategies in construction. Civil Engineering Dimension, 2(1), 56-64.Search in Google Scholar

Moselhi, O., Hegazy, T., & Fazio, P. (1993). DBID: Analogy-based DSS for bidding in construction, Journal of Construction Engineering and Management, 119(3), 466-470. doi: 10.1061/(ASCE)0733-9364(1993)119:3(466)10.1061/(ASCE)0733-9364(1993)119:3(466)Search in Google Scholar

Potts, K. (2008). Construction Cost Management: Learning from Case Studies. Abingdon, Great Bitain: Taylor & Francis.10.4324/9780203933015Search in Google Scholar

Saaty, T.L. (2000). Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process. Pittsburgh, PA: RWS Publications.Search in Google Scholar

Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), 111-118. doi: 10.1080/01446199300000004.10.1080/01446199300000004Search in Google Scholar

Shokri-Ghasabeh, M., & Chileshe, N. (2016). Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 2(16), 127-157. doi:10.1108/CI-04-2015-002110.1108/CI-04-2015-0021Search in Google Scholar

Sobotka, A., & Czarnigowska, A. (2007). Target costing in public construction projects. Proceedings of the 9th International Conference Modern Building Materials, Structures and Techniques, 16-18 May, Vilnius, Lithuania. Retrieved from: http://leidykla.vgtu.lt/conferences/MBM_2007/2pdf/Sobotka_czarn.pdfSearch in Google Scholar

Stevens, M. (2012). The Construction MBA. Practical Approaches to Construction Contracting. New York, USA: McGraw-Hill.Search in Google Scholar

Tan, Y.-T., Shen, L.-Y., Langston, C., & Liu, Y. (2010). Construction project selection using fuzzy TOPSIS approach. Journal of Modelling in Management, 5(3), 302-315. doi: 10.1108/1746566101109266910.1108/17465661011092669Search in Google Scholar

Triantaphyllou, E. (2000). Multi-criteria Decision Making Methods: A Comparative Study. Boston, USA: Kluwer.Search in Google Scholar

Wang, W.-C., Dzeng, R.-J., & Lu, Y.-H. (2007), Integration of Simulation-Based Cost Model and Multi-Criteria Evaluation Model for Bid Price Decisions. Computer-Aided Civil and Infrastructure Engineering, 22, 223-235. doi:10.1111/j.1467-8667.2007.00480.x10.1111/j.1467-8667.2007.00480.xSearch in Google Scholar

Wanous, M., Boussabaine, A. H., & Lewis, J. (2000). To bid or not to bid: a parametric solution. Construction Management and Economics, 18(4), 457-466. doi: 10.1080/0144619005002487910.1080/01446190050024879Search in Google Scholar

Wanous, M., Boussabaine, A. H., & Lewis, J. (2003). A neural network bid/no bid model: the case for contractors in Syria. Construction Management and Economics, 21(7), 737-744. doi: 10.1080/014461903200009332310.1080/0144619032000093323Search in Google Scholar