Uneingeschränkter Zugang

Application of approximation technique to on-line updating of the actual cost curve in the earned value method

   | 29. Mai 2020

Zitieren

[1] Arfken G.B., Weber J.W., Mathematical Models for Physicist, Burlington MA, Harcourt/Academic Press San Diego, San Francisco, New York, Boston, London, Sydney, Toronto, Tokyo 2001.Search in Google Scholar

[2] Bass’ Basement Research Institute (BBRI), Mathematical derivation of the Bass model, 2012, http://www.bassbasement.org/BassModelSearch in Google Scholar

[3] Burke R., Project Management. Planning and Control Techniques, John Wiley & Sons Ltd, Chichester, New York, Weinheim, Brisbane, Singapore, Toronto 1999.Search in Google Scholar

[4] Cioffi D.F., A tool for managing project: an analytic parametrization of the S-curve, International Journal of Project Management, 2001, No. 23, 215–222.10.1016/j.ijproman.2004.08.001Search in Google Scholar

[5] Corovic R., Why EVM is not good for schedule performance analyses (and how it could be…), The Measurable News, www.earnedschedule.com/papers, 2006–2007.Search in Google Scholar

[6] Czarnigowska A., Earned value method as a tool for project control, Budownictwo i Architektura, 2008, No. 3, 15–32.10.35784/bud-arch.2320Search in Google Scholar

[7] Dolezal J., Projektovy management. Komplexne, prakticky a podle svetovych standardu, Grada Publishing, Praha 2016.Search in Google Scholar

[8] Evensmo J., Karlsen J.T., Earned value based forecasts – some pitfalls, AACE International Transactions, 2006.Search in Google Scholar

[9] Hillson D., Earned value management and risk management: a practical synergy, PMI 2004 Global Congress Proceedings, Anaheim, California, USA 2004.Search in Google Scholar

[10] Hines W.W., Montgomery D.C., Probability and statistics in engineering and management science, Wiley, New York 1990.Search in Google Scholar

[11] Lipke W., Henderson K., Earned schedule – an emerging enhancement to EVM, 2007, www.pmicos.org/EVMDEC07.pdfSearch in Google Scholar

[12] Mahadik S.G., Bhangale P.P., Study & analysis of construction project management with earn value management system, International Journal of Innovative Technology and Exploring Engineering, 2013, Vol. 3, Iss. 4, 40–44.Search in Google Scholar

[13] Morrison F., The Art of Modeling Dynamic Systems. Forecasting for Chaos, Randomness and Determinism, Multiscience Press Inc., 1991.10.1063/1.4823091Search in Google Scholar

[14] Murmis G.M., S curves for monitoring project progress, Project Manage Journal, 1997, 29–35.Search in Google Scholar

[15] Narbaev T., De Marco A., An earned schedule-based regression model to improve cost at completion, Journal of Project Management, 2013, Vol. 32, No. 6, 1007–1018.10.1016/j.ijproman.2013.12.005Search in Google Scholar

[16] Narbaev T., De Marco A., Combination of growth model and earned schedule to forecast project cost at completion, Journal of Construction Engineering and Management, 2014, Vol. 140, No. 1.10.1061/(ASCE)CO.1943-7862.0000783Search in Google Scholar

[17] Project Management Institute (PMI), Practice standard for earned value management, Newtown Square, PA, 2011.Search in Google Scholar

[18] Seber G.A.F., Wild C.J., Nonlinear regression, Wiley, New York 1989.10.1002/0471725315Search in Google Scholar

[19] Vandevoorde S., Vanhoucke M., A comparison of different project duration forecasting methods using earned value metrics, 2006, International Journal of Project Management, Vol. 24, 289–302.10.1016/j.ijproman.2005.10.004Search in Google Scholar

[20] Walczak R., Podstawy zarządzania projektami. Metody i przykłady, Difin, Warszawa 2014.Search in Google Scholar

[21] Wanner R., Earned Value Management. So machen Sie Ihr Projektcontrolling noch effektiver, Demand GmbH, Norderstedt 2007.Search in Google Scholar

[22] Wawak S., Earned Value – metoda kontroli procesu zmian na przykładzie projektu inwestycyjnego, Management Forum 2000, K. Krzakiewicz, S. Cyfert (ed.), Wydawnictwo Akademii Ekonomicznej w Poznaniu, Poznań 2003, 268–271.Search in Google Scholar

[23] Webb A., Using earned value. A project manager’s guide, Gower Publishing Ltd., Aldershot-Burlington 2003.Search in Google Scholar

[24] Zając K., Zarys metod statystycznych, PWE, Warszawa 1994.Search in Google Scholar

eISSN:
2353-737X
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
Volume Open
Fachgebiete der Zeitschrift:
Architektur und Design, Architektur, Architekten, Gebäude, Technik, Maschinenbau, Mechanik, Industrielle Chemie, Chemieingenieurwesen, Materialwissenschaft, andere