Uneingeschränkter Zugang

The Multi-Mode, Resource-Constrained Project Scheduling Problem in Construction: State of Art Review and Research Challenges

   | 26. Mai 2020

Zitieren

In this article, the author analyses the state of the research of the multi-mode, resource-constrained, projectscheduling problem (MRCPSP). Both general and construction-industry-specific applications were studied and compared–in particular, algorithms and methodologies used for solving the different variations of this scheduling problem. Based on the analysis, the author suggests future research ideas.

eISSN:
2353-737X
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
Volume Open
Fachgebiete der Zeitschrift:
Architektur und Design, Architektur, Architekten, Gebäude, Technik, Maschinenbau, Mechanik, Industrielle Chemie, Chemieingenieurwesen, Materialwissenschaft, andere