[Akkermans, H. A., Bogerd, P., Yucesan, E. & van Wassenhove, L. N. (2003). The impact of ERP on supply chain management: Exploratory findings from a European Delphi study, European Journal of Operational Research, 146(2), 284-301, DOI: 10.1016/S0377-2217(02)00550-7.10.1016/S0377-2217(02)00550-7]Open DOISearch in Google Scholar
[Bernik, I. (2001). Večkriterijsko razporejanje z genetskimi algoritmi in vizualno simulacijo s Petri mrežami [Multicriteria production scheduling with genetic algorithms and visual simulation with Petri Nets], Doctoral Dissertation (in Slovenian), University of Maribor, Faculty of Organizational Sciences.]Search in Google Scholar
[Breskvar, U. & Kljajić M. (2001). Možnost uporabe simulacijskega modela v naročniški proizvodnji [Possibility of using a simulation model in a make-to-order production]. Management in globalizacija: zbornik posvetovanja z mednarodno udeležbo. Editor: Vukovič, G., Portorož 2001, p. 1075-1079, Kranj: Moderna organizacija.]Search in Google Scholar
[Buchmeister, B., Palčič, I. & Pavlinjek, J. (2008). Nekonvencionalne metode terminiranja proizvodnih procesov [Unconventional methods for production process termination]. Orodjarstvo 2008, Organizacija kot gonilo poslovnih izboljšav: dobavitelj - kupec - orodjar: (proceedings). Editors: Polajnar, A., Bračko, B., Junkar, M., Portorož 7-9 October 2008, p. 67-74, Ljubljana: GZS, Združenje kovinske industrije, Odbor za orodjarstvo; v Mariboru: Fakulteta za strojništvo.]Search in Google Scholar
[Caseau, Y. & Laburthe, F. (1995). Disjunctive scheduling with task intervals. Technical report, LIES, Ecole Normale Superieure de Paris.]Search in Google Scholar
[Chen, H., Ihlow, J. & Lehmann, C. (1999). A Genetic Algorithm for Flexible Job-Shop Scheduling, Proceedings of the 1999 IEEE International Conference on Robotics & Automation, Detroit, Michigan, 10-15 May 1999, pp. 1120-1125, Los Alamitos, CA: IEEE Computer Society.]Search in Google Scholar
[Choi, H. R., Kim, H. S., Park, B. J., Park, Y. J. & Whinston, A. B. (2004). An agent for selecting optimal order set in EC marketplace, Decision Support Systems, 36(4), 371-383, DOI: 10.1016/S0167-9236(03)00027-7.10.1016/S0167-9236(03)00027-7]Open DOISearch in Google Scholar
[Choi, S. H. & Yang, F. Y. (2006). A filter search algorithm based on machine-order space for job-shop scheduling problems, Journal of Manufacturing Technology Management, 17(3), 376-392, DOI: 10.1108/17410380610648326.10.1108/17410380610648326]Open DOISearch in Google Scholar
[Davis, L. (1985). Job shop scheduling with genetic algorithms. Proceedings fo the First Internacional Conference on Genetic Algorithms and their Aplications. Editor: Grefenstette, J. J., Pittsburgh, PA, 24-26 July 1985, pp. 136-140, Hillsdale, NJ, USA: L. Erlbaum Associates Inc.]Search in Google Scholar
[Derigs, U. & Jenal, O. (2005). A GA-based decision support system for professional course scheduling at Ford Service Organisation. OR Spectrum, 27(1), 147-162, DOI: 10.1007/s00291-004-0180-8.10.1007/s00291-004-0180-8]Open DOISearch in Google Scholar
[Deserno, T. M., Gïld, M. O., Plodowski, B., Spitzer, K. & Wein, B. B. (2008). Extended Query Refinement for Medical Image Retrieval. Journal Journal of Digital Imaging, 21(3), 280-289, DOI: 10.1007/s10278-007-9037-4.10.1007/s10278-007-9037-4]Open DOISearch in Google Scholar
[Dorn, J., Slany, W. (1994). A flow shop with compatibility constraints in a steel making plant. Intelligent Scheduling. Editors: Zwebenm M., Fox, M., pp. 629-654, San Francisco: Morgan Kaufmann.]Search in Google Scholar
[Eiben, A. E., Marchiori, E., & Valko, V. A. (2004). Evolutionary algorithms with on-the-fly population size adjustment. Lecture Notes in Computer Science, Vol. 3242, Parallel Problem Solving from Nature - PPSN VIII, 8th International Conference Proceedings, Editors: Yao, X. et al., Birmingham, 18-22 September 2004, pp. 41-50, Berlin: Springer.]Search in Google Scholar
[Gen, M. & Cheng, R. (1997). Genetic Algorithms & Engineering Design. New York: John Wiley & Sons, Inc.]Search in Google Scholar
[Jain, A. S. & Meeran, S. (1998). A state of the art rewiew of job-shop scheduling techniques. Dundee, Scotland: Technical report, Department of Applied Physics, Electronic and Mechanical Engineering, University of Dundee.]Search in Google Scholar
[Kljajić M., Breskvar, U. & Bernik, I. (2001). Planiranje proizvodnje s simulacijo in genetskimi algoritmi [Production planning with simulation and genetic algorithms]. Zbornik desete Elektrotehniške in računalniške konference ERK, Editor: Zajc, B., Portorož, 24-26 September 2001, pp. 311-314, Ljubljana: IEEE Region 8, Slovenska sekcija IEEE.]Search in Google Scholar
[Knaflič, A. (2009). Razvoj spletne aplikacije za dinamično razporejanje proizvodnje v malih in srednje velikih podjetjih [Development of a web application for dynamic production scheduling in small and medium enterprises], Master's thesis (in Slovenian), University of Maribor, Faculty of Organizational Sciences.]Search in Google Scholar
[Kofjač, D. & Kljajić, M. (2008). Application of genetic algorithms and visual simulation in a real-case production optimization. WSEAS Transactions on Systems and Control, 12(3): 992-1001.]Search in Google Scholar
[Kramberger, T. & Rosi, B. (2007). Do Managers have Enough Quality Information for Decision-Making. Organizacija, 40(3): 207-217.]Search in Google Scholar
[Ljubič T. (2000). Planiranje in vodenje proizvodnje [Production planning and control]. Kranj: Moderna organizacija.]Search in Google Scholar
[Marinho, J., Braganca, A., Ramos, C. (1999). Decision support system for dynamic production scheduling. Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning, Editor:, Porto, 21-24 July 1999, pp. 424-429, Evanston: IEEE Robotics & Automation Society.]Search in Google Scholar
[Na, D.-G., Jang, W., Kim, D.-W. (2003). Development of a resource planning system for compound semiconductor wafer manufacturing. Journal of Materials Processing Technology, 138(1-3), 372-378, DOI: 10.1016/S0924-0136(03)00101-8.10.1016/S0924-0136(03)00101-8]Open DOISearch in Google Scholar
[Naso, D., Surico, M., Turchiano, B. & Kaymak, U. (2007). Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete, European Journal of Operational Research, 177(3), 2069-2099, DOI: 10.1016/j.ejor.2005.12.019.10.1016/j.ejor.2005.12.019]Open DOISearch in Google Scholar
[Reeves, C. (1995). A genetic algorithm for flow shop sequencing, Computers and Operations Research, 22(1), 5-13.10.1016/0305-0548(93)E0014-K]Search in Google Scholar
[Smith, S. L. & Mosier, J. N. (1984). Design Guidelines for User-System Interface Software. Technical Report ESD-TR-84-190, Hanscom Air Force Base, MA: USAF Electronic Systems Division.]Search in Google Scholar
[Solina, F. (1997). Projektno vodenje razvoja programske opreme [Project management of software development]. Ljubljana: Fakulteta za računalništvo in informatiko.]Search in Google Scholar
[Stawowy, A., Duda, J., Osyczka, A. & Jankowski, R. (2007). Web-based Capable to Promise system. Information technologies in economics and innovative management. Editor: Dura, J. T., pp. 42-56, Krakow: AGH University of Science and Technology Press.]Search in Google Scholar
[Schuurman, N., Leight, M. & Berube, M. (2008). A Web-based graphical user interface for evidence-based decision making for health care allocations in rural areas. International Journal of Health Geographics, 7(1), 49-61, DOI: 10.1186/1476-072X-7-49.10.1186/1476-072X-7-49]Open DOISearch in Google Scholar
[Shi, X. H., Wan, L. M., Lee, H. P., Yang, X. W., Wang, L. M. & Liang, Y. C. (2003). An improved genetic algorithm with variable population-size and a PSO-GA based hybrid evolutionary algorithm. Proceedings of the 2003 International Conference on Machine Learning and Cybernetics, Xian: 2-5 November 2003, 3: 1735-1740, Los Alamitos: IEEE Computer Society Press.]Search in Google Scholar
[Tarantilis, C. D., Kiranoudis, C. T. & Theodorakopoulos, N. D. (2008). A Web-based ERP system for business services and supply chain management: Application to real-world process scheduling. European Journal of Operational Research, 187(3), 1310-1326, DOI: 10.1016/j.ejor.2006.09.015.10.1016/j.ejor.2006.09.015]Open DOISearch in Google Scholar