Enhancing design–bid–build project delivery: A comprehensive review and framework for contractor selection and project optimisation in the construction industry
This work is licensed under the Creative Commons Attribution 4.0 International License.
Abou Chakra, H., & Ashi, A. (2019). Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon. Journal of Industrial Engineering International, 15(1), pp. 147–152.Abou ChakraH. & AshiA. (2019).Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon.,15(1), pp.147–152.Search in Google Scholar
Ahmed, S., & El-Sayegh, S. (2021). Critical review of the evolution of project delivery methods in the construction industry. Buildings, 11(1), pp. 1–25.AhmedS. & El-SayeghS. (2021).Critical review of the evolution of project delivery methods in the construction industry.,11(1), pp.1–25.Search in Google Scholar
Akpan, E. O. P., Amade, B., Okangba, S., & Ekweozor, C. O. (2014). Constructability practice and project delivery processes in the Nigerian construction industry. Journal of Building Performance Simulation, 5, pp. 10–21.AkpanE. O. P.AmadeB.OkangbaS. & EkweozorC. O. (2014).Constructability practice and project delivery processes in the Nigerian construction industry.,5, pp.10–21.Search in Google Scholar
Algarni, A. M., Arditi, D., & Polat, G. (2007). Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728–735.AlgarniA. M.ArditiD. & PolatG. (2007).Build-operate-transfer in infrastructure projects in the United States.,133(10), pp.728–735.Search in Google Scholar
Al-Mousli, A., & El-Sayegh, M. H. (2016). Assessment of the design-construction interface problems in the UAE. Architectural Engineering and Design Management, 12, pp. 353–366.Al-MousliA. & El-SayeghM. H.(2016).Assessment of the design-construction interface problems in the UAE.,12, pp.353–366.Search in Google Scholar
Azari-Najafabadi, R., Ballard, G., Cho, S., & Kim, Y.-W. (2012). A dream of ideal project delivery system. In: Proceedings of the AEI 2011: Building Integration Solutions, Oakland, CA, USA, pp. 427–436.Azari-NajafabadiR.BallardG.ChoS. & KimY.-W.(2012).A dream of ideal project delivery system. In:,Oakland, CA, USA, pp.427–436.Search in Google Scholar
Azhar, N., Kang, Y., & Ahmad, I. (2015). Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction. Journal of Management in Engineering, 31(5), pp. 1–12.AzharN.KangY. & AhmadI. (2015).Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction.,31(5), pp.1–12.Search in Google Scholar
Azhar, N., Kang, Y., & Ahmad, I. U. (2014). Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective. Procedia Engineering, 77, pp. 213–221.AzharN.KangY. & AhmadI. U.(2014).Factors influencing integrated project delivery in publicly owned construction projects: An information modelling perspective.,77, pp.213–221.Search in Google Scholar
Calahorra-Jimenez, M., Alarcón, L. F., Torres-Machi, C., Chamorro, A., & Molenaar, K. (2020). Improving cost performance in design-bid-build road projects by mapping the reasons for cost overruns into the project phases. Revista de la Construcción, 19(2), pp. 334–345.Calahorra-JimenezM.AlarcónL. F.Torres-MachiC.ChamorroA. & MolenaarK. (2020).Improving cost performance in design-bid-build road projects by mapping the reasons for cost overruns into the project phases.,19(2), pp.334–345.Search in Google Scholar
Carpenter, N., & Bausman, D. C. (2016). Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10), pp. 1–10.CarpenterN. & BausmanD. C.(2016).Project delivery method performance for public school construction: Design-bid-build versus CM at risk.,142(10), pp.1–10.Search in Google Scholar
Choi, J., Yun, S., Leite, F., & Mulva, S. P. (2019). Team integration and owner satisfaction: Comparing integrated project delivery with construction management at risk in health care projects. Journal of Management in Engineering, 35(1), pp. 1–11.ChoiJ.YunS.LeiteF. & MulvaS. P.(2019).Team integration and owner satisfaction: Comparing integrated project delivery with construction management at risk in health care projects.,35(1), pp.1–11.Search in Google Scholar
Critical Appraisal Skills Programme. (2018). CASP Checklist: 10 Questions to Help you Make Sense of a Qualitative Research. Oxford Centre for Triple Value Healthcare.Critical Appraisal Skills Programme. (2018)..Oxford Centre for Triple Value Healthcare.Search in Google Scholar
David, C., & Becerik-Gerber, G. (2010). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136, pp. 815–825.DavidC. & Becerik-GerberG. (2010).Understanding construction industry experience and attitudes toward integrated project delivery.,136, pp.815–825.Search in Google Scholar
Eckblad, S. . (2007). Integrated Project Delivery – A Working Definition. AIA California Council, Sacramento, CA, USA.EckbladS. (2007)..AIA California Council,Sacramento, CA, USA.Search in Google Scholar
Friedlander, M. C. (1998). Feature: Design/build solutions. Journal of Management in Engineering, 14, pp. 59–64.FriedlanderM. C.(1998).Feature: Design/build solutions.,14, pp.59–64.Search in Google Scholar
Gallaher, M. . (2004). Cost Analysis of Inadequate Interoperability in the US Capital Facilities Industry (NIST GCR 04-867). National Institute of Standards and Technology, Gaithersburg, MD, USA.GallaherM. (2004)..National Institute of Standards and Technology,Gaithersburg, MD, USA.Search in Google Scholar
Ghadamsi, A., & Braimah, N. (2016). The impact of design-bid-build procurement methods on project performance in Libya. Journal of Construction Engineering and Project Management, 6(2), pp. 16–23.GhadamsiA. & BraimahN. (2016).The impact of design-bid-build procurement methods on project performance in Libya.,6(2), pp.16–23.Search in Google Scholar
Gould, F. E. (2012). Managing the Construction Process: Estimating, Scheduling, and Project Control. Prentice Hall, Boston, MA.GouldF. E.(2012)..Prentice Hall, Boston, MA.Search in Google Scholar
Gransberg, D., Molenaar, K., & Koch, J. E. (2006). Preparing for Design-Build Projects: A Primer for Owners, Engineers, and Contractors. American Society of Civil Engineers, Reston, VA.GransbergD.MolenaarK. & KochJ. E.(2006)..American Society of Civil Engineers,Reston, VA.Search in Google Scholar
Griffiths, F. (1989). Project contract strategy for 1992 and beyond. International Journal of Project Management, 7(2), pp. 69–83.GriffithsF. (1989).Project contract strategy for 1992 and beyond.,7(2), pp.69–83.Search in Google Scholar
Ireland, R. (2022). A model of strategic entrepreneurship: The construct and its dimensions. Journal of Management, 29(6), pp. 963–989. doi: 10.1016/s0149-2063(03)00086-2.IrelandR. (2022).A model of strategic entrepreneurship: The construct and its dimensions.,29(6), pp.963–989. doi:10.1016/s0149-2063(03)00086-2.Open DOISearch in Google Scholar
Kalsaas, B. T. . (2018). Transformation from design-bid-build to design-build contracts in road construction. In: 26th Annual Conference of the International Group for Lean Construction. International Group for Lean Construction.KalsaasB. T.. (2018).. In:26th Annual Conference of the International Group for Lean Construction.International Group for Lean Construction.Search in Google Scholar
Kereri, J. O., & Turner, B. S. (2017). A comparison of project party relationships in design-bid-build and design-build delivery methods. International Journal of Architecture Engineering and Construction, 6(4).KereriJ. O. & TurnerB. S.(2017).A comparison of project party relationships in design-bid-build and design-build delivery methods.,6(4).Search in Google Scholar
Khalafallah, A., Kartam, N., & Razeq, R. A. (2019). Bilevel standards-compliant platform for evaluating building contractor safety. Journal of Construction Engineering and Management, 145(10).KhalafallahA.KartamN. & RazeqR. A.(2019).Bilevel standards-compliant platform for evaluating building contractor safety.,145(10).Search in Google Scholar
Kisi, K. P., Mani, N., Rojas, E. M., & Foster, E. T. (2017). Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3), p.04016107. doi: 10.1061/(asce)co.1943-7862.0001257.KisiK. P.ManiN.RojasE. M. & FosterE. T.(2017).Optimal productivity in labor-intensive construction operations: Pilot study.,143(3), p.04016107. doi:10.1061/(asce)co.1943-7862.0001257.Open DOISearch in Google Scholar
Kumaraswamy, M. M., & Morris, D. A. (2002). Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93–102.KumaraswamyM. M. & MorrisD. A.(2002).Build-operate-transfer-type procurement in Asian megaprojects.,128(2), pp.93–102.Search in Google Scholar
Li, J., Greenwood, D., & Kassem, M. (2019). Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Automation in Construction, [online] 102(1), pp. 288–307. doi: 10.1016/j.autcon.2019.02.005.LiJ.GreenwoodD. & KassemM. (2019).Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases.,[online]102(1), pp.288–307. doi:10.1016/j.autcon.2019.02.005.Open DOISearch in Google Scholar
Lichtenstein, S., Badu, E., Owusu-Manu, D. G., Edwards, D. J., & Holt, G. D. (2013). Corporate social responsibility architecture and project alignments: A study of the Ghanaian construction industry. Journal of Engineering Design and Technology, 11(3), pp. 334–353.LichtensteinS.BaduE.Owusu-ManuD. G.EdwardsD. J. & HoltG. D.(2013).Corporate social responsibility architecture and project alignments: A study of the Ghanaian construction industry.,11(3), pp.334–353.Search in Google Scholar
Lu, W., Hua, Y., & Zhang, S. (2017). Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering Construction and Architectural Management, 24(1), pp. 118–132.LuW.HuaY. & ZhangS. (2017).Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects.,24(1), pp.118–132.Search in Google Scholar
Ma, L., Le, Y., Li, H., Jin, R., Piroozfar, P., & Liu, M. (2018). Regional comparisons of contemporary construction industry sustainable concepts in the Chinese context. Sustainability, 10(11), p. 3831. doi: 10.3390/su10113831.MaL.LeY.LiH.JinR.PiroozfarP. & LiuM. (2018).Regional comparisons of contemporary construction industry sustainable concepts in the Chinese context.,10(11), p.3831. doi:10.3390/su10113831.Open DOISearch in Google Scholar
Osei-Kyei, R., & Chan, A. P. C. (2015). Review of studies on the critical success factors for public-private partnership (PPP) projects from 1990 to 2013. International Journal of Project Management, 33(6), pp. 1335–1346.Osei-KyeiR. & ChanA. P. C.(2015).Review of studies on the critical success factors for public-private partnership (PPP) projects from 1990 to 2013.,33(6), pp.1335–1346.Search in Google Scholar
Oyelami, C. F. (2021). Assessment of Risk Response Techniques for Construction Projects Under Design Bid Build and Design & Build Procurement Methods in Abuja.OyelamiC. F.(2021)..Search in Google Scholar
Peng, Y., & Kim, J. (2022). Time, cost, and construction intensity comparison between design-manufacture-construct and traditional design-bid-build delivery methods. In: EPiC Series in Built Environment. EasyChair.PengY. & KimJ. (2022).Time, cost, and construction intensity comparison between design-manufacture-construct and traditional design-bid-build delivery methods. In:.EasyChair.Search in Google Scholar
Rojas, E. M., & Kell, I. (2008). Comparative analysis of project delivery systems cost performance in Pacific northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387–397.RojasE. M. & KellI. (2008).Comparative analysis of project delivery systems cost performance in Pacific northwest public schools.,134(6), pp.387–397.Search in Google Scholar
Salla, D. E. (2020). Comparing performance quality of designbid-build (DBB) and design-build (DB) project delivery methods in Nigeria. African Journal of Earth and Environmental Sciences, 2(2), pp. 517–523.SallaD. E.(2020).Comparing performance quality of designbid-build (DBB) and design-build (DB) project delivery methods in Nigeria.,2(2), pp.517–523.Search in Google Scholar
Tatum, C. B. (1983). Issues in professional construction management. Journal of Construction Engineering and Management, 109(1), pp. 112–119.TatumC. B.(1983).Issues in professional construction management.,109(1), pp.112–119.Search in Google Scholar
Teicholz, P. M., & Ashley, D. B. (1978). Optimal bid prices for unit price contract. Journal of the Construction Division, 104(1), pp. 57–67.TeicholzP. M. & AshleyD. B.(1978).Optimal bid prices for unit price contract.,104(1), pp.57–67.Search in Google Scholar
Tran, D. Q., Harper, C. M., Molenaar, K. R., Haddad, N. F., & Scholfield, M. M. (2018). Project delivery selection matrix for highway design and construction. Transportation Research Record: Journal of the Transportation Research Board, 2347(1), pp. 3–10. doi: 10.3141/2347-01.TranD. Q.HarperC. M.MolenaarK. R.HaddadN. F. & ScholfieldM. M.(2018).Project delivery selection matrix for highway design and construction.,2347(1), pp.3–10. doi:10.3141/2347-01.Open DOISearch in Google Scholar
Xia, B., Chan, A. P. C., & Yeung, J. F. Y. (2011). Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations. Journal of Construction Engineering and Management, 137(12), pp. 1176–1184.XiaB.ChanA. P. C. & YeungJ. F. Y.(2011).Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations.,137(12), pp.1176–1184.Search in Google Scholar
Youssef, M. A., Gamal, A., & Abdelhamid, S. A. G. (2017). Libyan construction projects delivery systems: empirical comparison between design-build and design-bid-build. Journal of Engineering and Applied Science, 2(1), pp. 17–21.YoussefM. A.GamalA. & AbdelhamidS. A. G.(2017).Libyan construction projects delivery systems: empirical comparison between design-build and design-bid-build.,2(1), pp.17–21.Search in Google Scholar
Yu, T., Shen, G. Q., & Shi, Q. (2017). Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4), pp. 1–48.YuT.ShenG. Q. & ShiQ. (2017).Comparing the performance quality of design-bid-build and design-build delivery methods.,143(4), pp.1–48.Search in Google Scholar
Zuber, S. Z. S., Nawi, M. N. M., Abdul Nifa, F. A., & Bahaudin, A. Y. (2018). An overview of project delivery methods in construction industry. International Journal of Supply Chain Management, 7(6), pp. 177–182.ZuberS. Z. S.NawiM. N. M.Abdul NifaF. A. & BahaudinA. Y.(2018).An overview of project delivery methods in construction industry.,7(6), pp.177–182.Search in Google Scholar