This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Abbas, G., & Painting, N. (2017). Significant factors causing cost overruns in the construction industry in Afghanistan. Procedia Engineering, 182, pp. 510–517. doi: 10.1016/j.proeng.2017.03.145AbbasG.PaintingN.2017Significant factors causing cost overruns in the construction industry in AfghanistanProcedia Engineering18251051710.1016/j.proeng.2017.03.145Open DOISearch in Google Scholar
Abdel-Razek, R. H. (2012). Engineering, construction and architectural management article information : To cite this document : Users who downloaded this article also downloaded : About www.emeraldinsight.com Factors affecting construction quality in Egypt : identification. Engineering, Construction and Architectural Management, 5(3), pp. 220–227.Abdel-RazekR. H.2012Engineering, construction and architectural management article information : To cite this document : Users who downloaded this article also downloaded : About Emerald www.emeraldinsight.com Factors affecting construction quality in Egypt : identificationEngineering, Construction and Architectural Management5322022710.1046/j.1365-232X.1998.00071.xSearch in Google Scholar
Abisuga, A. O., Amusu, O. R. O., & Salvador, K. A. (2017). Construction delay in Nigeria : A perception of indigenous and multinational construction firms construction delay in Nigeria : A perception of indigenous and multinational construction firms department of building technology. Journal of Emerging Trends in Economics and Management Sciences, 5(3), pp. 371–378.AbisugaA. O.AmusuO. R. O.SalvadorK. A.2017Construction delay in Nigeria : A perception of indigenous and multinational construction firms construction delay in Nigeria : A perception of indigenous and multinational construction firms department of building technologyJournal of Emerging Trends in Economics and Management Sciences53371378Search in Google Scholar
Agbenohevi, C. S., Amoatey, C. T., Adaku, E., & Famiyeh, S. (2017). Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2).AgbenoheviC. S.AmoateyC. T.AdakuE.FamiyehS.2017Major causes of construction time and cost overruns: A case of selected educational sector projects in GhanaJournal of Engineering, Design and Technology15210.1108/JEDT-11-2015-0075Search in Google Scholar
Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677.AibinuA. A.OdeyinkaH. A.2006Construction delays and their causative factors in NigeriaJournal of Construction Engineering and Management132766767710.1061/(ASCE)0733-9364(2006)132:7(667)Search in Google Scholar
Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), pp. 337–342.AtkinsonR.1999Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteriaInternational Journal of Project Management17633734210.1016/S0263-7863(98)00069-6Search in Google Scholar
Ballard, G., & Howell, G. A. (2003). An update on last planner. In Proc., 11th Annual Conf., International Group for Lean Construction, Blacksburg, VA (pp. 1–10).BallardG.HowellG. A.2003An update on last plannerInProc., 11th Annual Conf., International Group for Lean ConstructionBlacksburg, VA110Search in Google Scholar
Bryde, D. J., & Robinson, L. (2007). The relationship between total quality management and the focus of project management practices. The TQM Magazine.BrydeD. J.RobinsonL.2007The relationship between total quality management and the focus of project management practicesThe TQM Magazine10.1108/09544780710720835Search in Google Scholar
Davis, K. (2014). ScienceDirect different stakeholder groups and their perceptions of project success. JPMA, 32(2), pp. 189–201. doi: 10.1016/j.ijproman.2013.02.006DavisK.2014ScienceDirect different stakeholder groups and their perceptions of project successJPMA32218920110.1016/j.ijproman.2013.02.006Open DOISearch in Google Scholar
EBST. (2004). Svigt i byggeriet – økonomiske konsekvenser og muligheder for en reduktion. København: Erhvervs- og Byggestyrelsen. Retrieved from: www.ebst.dkEBST2004Svigt i byggeriet – økonomiske konsekvenser og muligheder for en reduktionKøbenhavnErhvervs- og ByggestyrelsenRetrieved from: www.ebst.dkSearch in Google Scholar
Enshassi, A., Mohamed, S., & Abushaban, S. (2010). Factors affecting the performance of construction projects in the Gaza strip. Journal of Civil Engineering and Management, 15(3), pp. 269–280. doi: 10.3846/1392-3730.2009.15.269-280EnshassiA.MohamedS.AbushabanS.2010Factors affecting the performance of construction projects in the Gaza stripJournal of Civil Engineering and Management15326928010.3846/1392-3730.2009.15.269-280Open DOISearch in Google Scholar
Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), e06826.FashinaA. A.OmarM. A.SheikhA. A.FakunleF. F.2021Exploring the significant factors that influence delays in construction projects in HargeisaHeliyon74e0682610.1016/j.heliyon.2021.e06826808570033981889Search in Google Scholar
Gardiner, P. D., & Stewart, K. (2000). Revisiting the golden triangle of cost, time and quality: The role of NPV in project control, success and failure. International Journal of Project Management, 18, pp. 251–256.GardinerP. D.StewartK.2000Revisiting the golden triangle of cost, time and quality: The role of NPV in project control, success and failureInternational Journal of Project Management1825125610.1016/S0263-7863(99)00022-8Search in Google Scholar
Guggenberger, T., & Amend, J. (2021). You Can’t Manage What You Can’t Define: The Success of Blockchain Projects You Can’t Manage What You Can’t Define: The Success of Blockchain Projects Beyond the Iron Triangle Completed Research Paper.GuggenbergerT.AmendJ.2021You Can’t Manage What You Can’t Define: The Success of Blockchain Projects You Can’t Manage What You Can’t Define: The Success of Blockchain Projects Beyond the Iron Triangle Completed Research PaperSearch in Google Scholar
Gunduz, M., & Tehemar, S. R. (2020). Assessment of delay factors in construction of sport facilities through multi criteria decision making. Production Planning & Control, 31(15), pp. 1291–1302. doi: 10.1080/09537287.2019.1704903.GunduzM.TehemarS. R.2020Assessment of delay factors in construction of sport facilities through multi criteria decision makingProduction Planning & Control31151291130210.1080/09537287.2019.1704903Open DOISearch in Google Scholar
Herrera, R. F., Omar, S., & Castañeda, K. (2020). Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis. Applied Science, 10(16), pp.5506.HerreraR. F.OmarS.CastañedaK.2020Cost overrun causative factors in road infrastructure projects: A frequency and importance analysisApplied Science1016550610.3390/app10165506Search in Google Scholar
Holt, G. D. (2014). Asking questions, analysing answers: relative importance revisited. Constr Innov. 14, pp. 2–16.HoltG. D.2014Asking questions, analysing answers: relative importance revisitedConstr Innov1421610.1108/CI-06-2012-0035Search in Google Scholar
Hossain, A., Raiymbekov, D., Nadeem, A., & Ryeol, J. (2019). Delay causes in Kazakhstan’s construction projects and remedial measures. International Journal of Construction Management, 22(5), pp. 801–819. doi: 10.1080/15623599.2019.1647635.HossainA.RaiymbekovD.NadeemA.RyeolJ.2019Delay causes in Kazakhstan’s construction projects and remedial measuresInternational Journal of Construction Management22580181910.1080/15623599.2019.1647635Open DOISearch in Google Scholar
Ika, L. A. (2009). Project success as a topic in project management journals. Willey Interscience, 40(4), pp. 6–19. doi: 10.1002/pmjIkaL. A.2009Project success as a topic in project management journalsWilley Interscience40461910.1002/pmjOpen DOISearch in Google Scholar
Islam, M. S., & Trigunarsyah, B. (2017). Construction delays in developing countries. KICEM Journal of Construction Engineering and Project Management, 7(1), pp. 1–12.IslamM. S.TrigunarsyahB.2017Construction delays in developing countriesKICEM Journal of Construction Engineering and Project Management7111210.6106/JCEPM.2017.3.30.001Search in Google Scholar
Kamaruddeen, A. M., Sung, C. F., & Wahi, W. (2020). A study on factors causing cost overrun of construction projects in Sarawak, Malaysia. Civil Engineering and Architecture, 8(3), pp. 191–199. doi: 10.13189/cea.2020.080301.KamaruddeenA. M.SungC. F.WahiW.2020A study on factors causing cost overrun of construction projects in Sarawak, MalaysiaCivil Engineering and Architecture8319119910.13189/cea.2020.080301Open DOISearch in Google Scholar
Karaman, E., & Kurt, M. (2015). Comparison of project management methodologies: Prince 2 versus PMBOK for it projects. International Journal of Applied Sciences and Engineering, 4(4), pp. 572–579.KaramanE.KurtM.2015Comparison of project management methodologies: Prince 2 versus PMBOK for it projectsInternational Journal of Applied Sciences and Engineering44572579Search in Google Scholar
Kazaz, A., Ulubeyli, S. & Tuncbilekli, N. A. (2012). Causes of Delays in Construction Projects in Turkey. J. Civ. Eng. Manag. 18, pp. 426–435.KazazA.UlubeyliS.TuncbilekliN. A.2012Causes of Delays in Construction Projects in TurkeyJ. Civ. Eng. Manag.1842643510.3846/13923730.2012.698913Search in Google Scholar
Kazemi, A., & Kim, E. (2020). Identifying and prioritizing delay factors in Iran’s oil construction projects. International Journal of Energy Sector Management, 15(3), pp. 476–495. doi: 10.1108/IJESM-04-2020-0006KazemiA.KimE.2020Identifying and prioritizing delay factors in Iran’s oil construction projectsInternational Journal of Energy Sector Management15347649510.1108/IJESM-04-2020-0006Open DOISearch in Google Scholar
Lambropoulos, S. (2013). Objective construction contract award using cost, time and durability utility. Procedia – Social and Behavioral Sciences, 74, pp. 123–133. doi: 10.1016/j.sbspro.2013.03.052LambropoulosS.2013Objective construction contract award using cost, time and durability utilityProcedia – Social and Behavioral Sciences7412313310.1016/j.sbspro.2013.03.052Open DOISearch in Google Scholar
Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2006). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of Construction Engineering and Management, 32(1), 04015032. doi: 10.1061/(ASCE)ME.1943-5479.0000391.LarsenJ. K.ShenG. Q.LindhardS. M.BrunoeT. D.2006Factors affecting schedule delay, cost overrun, and quality level in public construction projectsJournal of Construction Engineering and Management3210401503210.1061/(ASCE)ME.1943-5479.0000391Open DOISearch in Google Scholar
Lind, H. (2013). Policies to avoid cost overruns in infrastructure projects: Critical evaluation and recommendations. Australasian Journal of Construction Economics and Building, 14(3), pp. 74–85.LindH.2013Policies to avoid cost overruns in infrastructure projects: Critical evaluation and recommendationsAustralasian Journal of Construction Economics and Building143748510.5130/AJCEB.v14i3.4151Search in Google Scholar
Mahamid, I. (2016). Analysis of rework in residential building projects in Palestine. Jordan Journal of Civil Engineering, 10(2), pp. 197–208. doi: 10.14525/JJCE.10.1.3536.MahamidI.2016Analysis of rework in residential building projects in PalestineJordan Journal of Civil Engineering10219720810.14525/JJCE.10.1.3536Open DOISearch in Google Scholar
Mahamid, I. (2017). Factors contributing to poor performance in construction projects: Studies of Saudi Arabia Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12(1), pp. 27–38. doi: 10.1080/14488388.2016.1243034.MahamidI.2017Factors contributing to poor performance in construction projects: Studies of Saudi Arabia Saudi ArabiaAustralian Journal of Multi-Disciplinary Engineering121273810.1080/14488388.2016.1243034Open DOISearch in Google Scholar
Mahamid, I., & Dmaidi, N. (2013). Risks leading to cost overrun in building construction from consultants’ perspective. Organization, Technology and Management in Construction, 5(2), pp. 860–873. doi: 10.5592/otmcj.2013.2.5.MahamidI.DmaidiN.2013Risks leading to cost overrun in building construction from consultants’ perspectiveOrganization, Technology and Management in Construction5286087310.5592/otmcj.2013.2.5Open DOISearch in Google Scholar
Nyoni, T., & Bonga, W. G. (2017). A theoretical harmonization of critical success factors (CSFs) in the construction sector in Zimbabwe: Introducing the 3P model. Dynamic Research Journals (DRJ), 2(4), pp. 19–29.NyoniT.BongaW. G.2017A theoretical harmonization of critical success factors (CSFs) in the construction sector in Zimbabwe: Introducing the 3P modelDynamic Research Journals (DRJ)241929Search in Google Scholar
Oke, A. E., & Ugoje, O. F. (2013). Assessment of rework cost of selected building projects in Nigeria. International Journal of Quality & Reliability Management, 30(7), pp. 799–810. doi: 10.1108/IJQRM-Jul-2011-0103.OkeA. E.UgojeO. F.2013Assessment of rework cost of selected building projects in NigeriaInternational Journal of Quality & Reliability Management30779981010.1108/IJQRM-Jul-2011-0103Open DOISearch in Google Scholar
Oke, A., Dlamini, E., & Aigbavboa, C. (2017). Factors affecting quality of construction projects in Swazilland. In: The Ninth International Conference on Construction in the 21st Century (CITC-9): Revolutionizing the Architecture, Engineering and Construction Industry through Leadership, Collaboration and Technology, (March 5th–7th).OkeA.DlaminiE.AigbavboaC.2017Factors affecting quality of construction projects in SwazillandIn:The Ninth International Conference on Construction in the 21st Century (CITC-9): Revolutionizing the Architecture, Engineering and Construction Industry through Leadership, Collaboration and TechnologyMarch 5th–7thSearch in Google Scholar
Oluyemi-Ayibiowu, B. D., Aiyewalehinmi, O. E., & Omolayo, O. J. (2019). Most critical factors responsible for cost overruns in Nigeria building construction industry. Journal of Multidisciplinary Engineering Science Studies, 5(2), pp. 2500–2508.Oluyemi-AyibiowuB. D.AiyewalehinmiO. E.OmolayoO. J.2019Most critical factors responsible for cost overruns in Nigeria building construction industryJournal of Multidisciplinary Engineering Science Studies5225002508Search in Google Scholar
Oyedele, L. O., Jaiyeoba, B. E., Kadiri, K. O., Folagbade, S. O., Tijani, I. K., & Salami, R. O. (2015). Critical factors affecting construction quality in Nigeria: evidence from industry professionals. International Journal of Sustainable Building Technology and Urban Development, 6(2), pp. 103–113. doi: 10.1080/2093761X.2015.1033662.OyedeleL. O.JaiyeobaB. E.KadiriK. O.FolagbadeS. O.TijaniI. K.SalamiR. O.2015Critical factors affecting construction quality in Nigeria: evidence from industry professionalsInternational Journal of Sustainable Building Technology and Urban Development6210311310.1080/2093761X.2015.1033662Open DOISearch in Google Scholar
Pham, H., Luu, T., Kim, S., & Vien, D. (2020). Assessing the impact of cost overrun causes in transmission lines construction projects. KSCE Journal of Civil Engineering, 24(4), pp. 1029–1036. doi: 10.1007/s12205-020-1391-5.PhamH.LuuT.KimS.VienD.2020Assessing the impact of cost overrun causes in transmission lines construction projectsKSCE Journal of Civil Engineering2441029103610.1007/s12205-020-1391-5Open DOISearch in Google Scholar
Saidu, I., Shakantu, W., Elizabeth, P., & Africa, S. (2017). An investigation into cost overruns for ongoing building projects in Abuja, Nigeria. Acta Structilia, 24(1), pp. 53–72.SaiduI.ShakantuW.ElizabethP.AfricaS.2017An investigation into cost overruns for ongoing building projects in Abuja, NigeriaActa Structilia241537210.18820/24150487/as24i1.3Search in Google Scholar
Shrivas, A., & Singla, H. K. (2020). Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 5, pp. 1–9. doi: 10.1080/15623599.2020.1728486.ShrivasA.SinglaH. K.2020Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approachInternational Journal of Construction Management51910.1080/15623599.2020.1728486Open DOISearch in Google Scholar
Turner, J. R., & Muller, R. (2003). On the nature of the project as a temporary organization. International Journal of Project Management, 21, pp. 1–8.TurnerJ. R.MullerR.2003On the nature of the project as a temporary organizationInternational Journal of Project Management211810.1016/S0263-7863(02)00020-0Search in Google Scholar
White, D., & Fortune, J. (2002). Current practice in project management Đ an empirical study. International Journal of Project Management, 20, pp. 1–11.WhiteD.FortuneJ.2002Current practice in project management Đ an empirical studyInternational Journal of Project Management2011110.1016/S0263-7863(00)00029-6Search in Google Scholar