[1. European Network of Transmission System Operators for Electricity (ENTSO-E) (2010). Scenario Outlook and System Adequacy Forecast 2011-2025, Brussels: ENTSO-E AISBL, p. 168.]Search in Google Scholar
[2. Krishans, Z., Mutule, A., Merkuryev, Y., & Oleinikova, I. (Jan. 2011). Dynamic Management of Sustainable Development - Methods for Large Technical Systems (1st ed-n). Springer, XXIII, ISBN: 978-0-85729-055-7, p. 190.]Search in Google Scholar
[3. Keay, M. (Febr. 2013). Oxford Energy Comment, Renewable energy targets: the importance of system and resource costs. The Oxford Institute for Energy Studies.10.26889/ec201302]Search in Google Scholar
[4. OECD/IEA. Power Generation investment in electricity markets. (2003).France.]Search in Google Scholar
[5. Rautkivi, M., & Kruisdijk, M. (July-Aug. 2013). Europe’s balancing act. Power Engineering International, 16-20.]Search in Google Scholar
[6. Joskow, P. L. (June, 2012). Competitive electricity markets and investment in new generating capacity. MIT, p. 74.]Search in Google Scholar
[7. Turcik, M., Oleinikova, I., Junghans, G., & Kolcun, M. (2012). Methods for Estimation of Market Power in Electric Power Industry. Latv. J. Phys. Tech. Sci., (2), 14-22.10.2478/v10047-012-0008-2]Search in Google Scholar
[8. VGB Survey (2011). Investment and Operation Cost Figures: Generation Portfolio.]Search in Google Scholar
[9. Sauhats, A., Vempers, G., Inde, J., & Neimane, V. (July 2007). On co-eneration strategies in the cities of North-Eastern Europe. Power Tech., 07 IEEE , Lausanne (Switzerland), 645-650.10.1109/PCT.2007.4538392]Search in Google Scholar
[10. Neimane, V., Sauhats, A., Vempers, G., Tereskina, I., & Bočkarjova, G. (May, 2009). Allocation production cost at CHP Plant to Heat and Power based on Cooperative Game Theory. In: 6th Intern. Conf. on the European Energy Market, Lēvene (Belgium), 182-187. 10.1109/EEM.2009.5207193]Search in Google Scholar