Uneingeschränkter Zugang

Forecasting Models for Time and Cost Performance Predicting of Infrastructural Projects

, ,  und   
17. Dez. 2024

Zitieren
COVER HERUNTERLADEN

AKOGBE, R. - FENG, X. - ZHOU, J.: Project performance evaluation based on time-cost-design capacity and plant utilization, Quest Journals Journal of Architecture and Civil Engineering, vol. 2, no. 2, pp. 1-9, 2004.Search in Google Scholar

ALSUGAIR, A. M. - ALSANABANI, N. M. - AL-GAHTANI, K. S.: Forecasting the final contract cost on the basis of the owner’s cost estimation using an artificial neural network, Buildings, vol. 13, no. 3, p. 786, 2023, doi: 10.3390/buildings13030786.Open DOISearch in Google Scholar

MACKOVA, D. - KOZLOVSKA, M. - BASKOVA, R. - SPISAKOVA, M. - KRAJNIKOVA, K.: Construction-duration prediction model for residential buildings in Slovak Republic based on computer simulation, International Journal of Applied Engineering Research, vol. 12, no. 13, pp. 3590-3599, 2017.Search in Google Scholar

KEVIN, - CHARLES, : Analysis of building performance evaluation and value management as tools in building facilities management, Civil and Environmental Research, vol. 3, no. 1, 2013.Search in Google Scholar

AL-ZWAINY, F. M. S. - AL-MARSOMI, M. S. K.: Developing a novel approach for evaluation performance of the engineering departments managers using 360 technique, Eurasian Journal of Science & Engineering, vol. 2, no. 2, pp. 56-67, 2017.Search in Google Scholar

AL-ZWAINY, F. M. S. - HADHAL, N. T.: Building a mathematical model for predicting the cost of communication towers projects using multifactor linear regression technique, International Journal of Construction Engineering and Management, vol. 5, no. 1, pp. 25-29, 2016.Search in Google Scholar

JABER, F. K. - JASIM, N. A. - AL-ZWAINY, F. M.: Forecasting techniques in construction industry: Earned value indicators and performance models, Scientific Review Engineering and Environmental Sciences, vol. 29, no. 2, pp. 234-243, 2020.Search in Google Scholar

WANG, Y. R. - GIBSON, G. E.: A study of pre-project planning and project success using ANNs and regression models, Automation in Construction, vol. 19, no. 3, pp. 341-346, 2010.Search in Google Scholar

AL-ZWAINY, F. M. S. - SALIH, S. A. - ALDIKHEELI, M. R.: Prediction of residual strength of sustainable self-consolidating concrete exposed to elevated temperature using artificial intelligence technique, International Journal of Applied Science and Engineering, vol. 18, no. 2, pp. 1-15, 2021.Search in Google Scholar

AL-ZWAINY, F. M. S. - ALA’AMAR, H. - IBRAHEEM, H. F.: Predicting productivity in construction industry utilizing multiple linear regression technique and artificial neural network technique: A review for research and applications, International Journal of Research in Advanced Engineering and Technology, vol. 6, no. 3, pp. 7-13, 2020.Search in Google Scholar

MAYA, R. - HASSAN, B. - HASSAN, A.: Develop an artificial neural network (ANN) model to predict construction projects performance in Syria, Journal of King Saud University-Engineering Sciences, 2021.Search in Google Scholar

MEMON, A. H. - RAHMAN, I. A. - AZIS, A. A. A.: Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia, International Journal of Advances in Applied Sciences, vol. 1, no. 1, pp. 45-52, 2012.Search in Google Scholar

HAMMOODY, O. - AL-SOMAYDAII, J. - AL-ZWAINY, F. - HAYDER, G.: Forecasting and determining of cost performance index of tunnels projects using artificial neural networks, International Journal for Computational Civil and Structural Engineering, vol. 18, no. 1, pp. 51-60, 2022.Search in Google Scholar

JASIM, N. A. - MARUF, S. M. - ALJUMAILY, H. S. M. - AL-ZWAINY, F.: Predicting index to complete schedule performance indicator in highway projects using artificial neural network model, Archives of Civil Engineering, vol. 66, no. 3, pp. 541-554, 2020.Search in Google Scholar

AIDAN, I. A. - AL-JEZNawi, D. - AL-ZWAINY, F. M. S.: Predicting earned value indexes in residential complexes’ construction projects using artificial neural network model, International Journal of Intelligent Engineering and Systems, vol. 13, no. 4, pp. 248-259, 2020.Search in Google Scholar

ZAMIM, S. K. - FARAJ, N. S. - AIDAN, I. A. - AL-ZWAINY, F. M. S. - ABDULQADER, M. A. - MOHAMMED, I. A.: Prediction of dust storms in construction projects using intelligent artificial neural network technology, Periodicals of Engineering and Natural Sciences, vol. 7, no. 4, pp. 1659-1666, 2019.Search in Google Scholar

JABER, F. K. - AL-ZWAINY, F. M. S. - HACHEM, S. W.: Optimizing of predictive performance for construction projects utilizing support vector machine technique, Cogent Engineering, vol. 6, no. 1, pp. 1685860, 2019.Search in Google Scholar

Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
2 Hefte pro Jahr
Fachgebiete der Zeitschrift:
Wirtschaftswissenschaften, Volkswirtschaft, Wirtschaftstheorie, -systeme und -strukturen, Betriebswirtschaft, Branchen, Umweltmanagement