[
Aboushady, A. M., & Elbarkouky, M. (2015). Overview of Building Information Modelling Applications in Construction Projects. Paper presented at the Architectural Engineering Institute, AEI 2015, Milwaukee, Wisconsin, USA.
]Search in Google Scholar
[
Aghimien, D. O, Aigbavboa, C. O, & Oke, A. E. (2018). Digitalisation for Effective Construction Project Delivery in South Africa. Contemporary Construction Conference: Dynamic and Innovative Built Environment (CCC2018), Coventry United Kingdom, 5–6 July, pp. 3–10.
]Search in Google Scholar
[
Barlow, J. (2000). Innovation and learning in complex offshore construction projects. Research Policy, 29(7–8), 973–989. https://doi.org/10.1016/s0048-7333(00)00115-3
]Search in Google Scholar
[
Bartlett, M. S. (1954). A note on the multiplying factors for various chi square approximations. Journal of the Royal Statistical Society, 16(B), 296–298.
]Search in Google Scholar
[
Berger, R. (2016). Digitisation in the construction industry. Think Act, 1–16. https://www.rol&berger.com/nl/Publications/Digitization-of-the-construction-industry.html
]Search in Google Scholar
[
Chan, A. P. C., Chan., D. W. M., Chiang, Y. H., Tang, B. S., Chan, E. H. W., & Ho, K.S.K. (2004). Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management, 130(2), 188–198. https://doi.org/10.1061/(asce)0733-9364(2004)130:2(188)
]Search in Google Scholar
[
Cheng, E. W. L., & Li, H. (2002). Construction Partnering Process and Associated Critical Success Factors: Quantitative Investigation. Journal of Management in Engineering, 18(4), 194–202. https://doi.org/10.1061/(asce)0742-597x(2002)18:4(194)
]Search in Google Scholar
[
Cheng, E. W. L., Li, H., & Love, P. E. D. (2000). Establishment of critical success factors for construction partnering. Journal of Management in Engineering, 6(2), 84–92. https://doi.org/10.1061/(asce)0742-597x(2000)16:2(84)
]Search in Google Scholar
[
Cook, E. L., & Hancher, D. E. (1990). Partnering: Contracting for the future. Journal of Management in Engineering, 6(4), 431–446. https://doi.org/10.1061/(asce)9742-597x(1990)6:4(431)
]Search in Google Scholar
[
Delgado, J. M., Oyedele, L., Ajayi, A., Akanbi, L., Akinade, O., Bilal, M., & Owolabi, H. (2019). Robotics and automated systems in construction: Understanding industry-specific challenges for adoption. Journal of Building Engineering, 26, 100868. https://doi.org/10.1016/j.jobe.2019.100868
]Search in Google Scholar
[
Doğan, S. Z., Çalğici, P. K., Arditi, D., & Günaydin, H. M. (2015). Critical success factors of partnering in the building design process. METU Journal of the Faculty of Architecture, 32(2), 61–78. https://doi.org/10.4305/metu.jfa.2015.2.4
]Search in Google Scholar
[
Dyk, L. V., & Schutte, C. S. L. (2012). Development of a Maturity Model for Telemedicine. The South African Journal of Industrial Engineering, 23(2). https://doi.org/10.7166/23-2-330
]Search in Google Scholar
[
Economist Intelligence Unit (EIU) (2015). Connecting Companies Strategic Partnerships for The Digital Age. A Telstra report. http://connectedfuture.economist.com/connecting-capabilities/article/connecting-companies-strategic-partnerships-for-the-digital-age/
]Search in Google Scholar
[
Economist Intelligence Unit (EIU) (2017). Digital Refinement: C-Level Executives Hone Their Transformation Skills, Choosing the Right Technology Partner. https://eiuperspectives.economist.com/sites/default/files/Choosing_the_right_technology_partner.pdf
]Search in Google Scholar
[
Field, A. (2005). Discovering Statistics, Using SPSS for Windows. Sage Publications.
]Search in Google Scholar
[
Frost, J. (2020). How to interpret R-squared in Regression Analysis. https://statisticsbyjim.com/regression/interpret-r-squared-regression/
]Search in Google Scholar
[
George, D., & Mallery, P. (2000). SPSS for Windows Step by Step: A Simple Guide and Reference. (2nd ed.). Allyn & Bacon Publisher.
]Search in Google Scholar
[
Ghasemi, A., & Zahediasl, S. (2012). Normality test for statistical analysis: A guide for nonstatisticians. International Journal of Endocrinology and Metabolism, 10(2), 486–489. https://doi.org/10.5812/ijem.3505
]Search in Google Scholar
[
Gill, M., VanBoskirk, S., Evans, P. F., Nail, J., Causey, A., Glazer, L. (2016). The Digital Maturity Model 4.0, Benchmarks: Digital Business Transformation Playbook. www.forrester.com
]Search in Google Scholar
[
Hampson, K., Kraatz, J. A., & Sanchez, A. X. (2014). R&D investment and impact in the global construction industry. Routledge.
]Search in Google Scholar
[
Handler, A. (2017). Revisit Risk in the Age of Digital Transformation. https://www.gartner.com/smarterwithgartner/revisit-risk-in-the-age-of-digital-transformation/
]Search in Google Scholar
[
Kadefors, A. (2004). Trust in project relationships—Inside the black box. International Journal of Project Management, 22(3), 175–182. https://doi.org/10.1016/s0263-7863(03)00031-0
]Search in Google Scholar
[
Kalavendi R. (2017). Digitisation and Digitalisation: The two-letter difference. https://medium.com/@ravisierraatlantic/digitization-digitalization-the-2-letter-difference-59b747d42ade
]Search in Google Scholar
[
Klötzer, C., & Pflaum, A. (2017). Toward the Development of a Maturity Model for Digitalisation within the Manufacturing Industry's Supply Chain. Proceedings of the 50th Hawaii International Conference on System Sciences, Waikoloa Village, Hawaii, USA, January 4–7.
]Search in Google Scholar
[
Minitab (2013). Regression Analysis: How Do I Interpret R-squared and Assess the Goodness-of-Fit? https://blog.minitab.com/blog/adventures-in-statistics-2/regression-analysis-how-do-i-interpret-rsquared-&-assess-the-goodness-of-fit
]Search in Google Scholar
[
Naoum, S. (2003). An overview of the concept of partnering. International Journal of Project Management, 21(1), 71–76. https://doi.org/10.1016/s0263-7863(01)00059-x
]Search in Google Scholar
[
Newman, M. (2017). Digital Maturity Model (DMM): A blueprint for digital transformation, TM Forum White paper. www.tmforum.org
]Search in Google Scholar
[
Nunez, N. P., Del Puerto, C. L., & Jeong, D. (2018). Development of a Partnering Maturity Assessment Tool for Transportation Agencies. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(4). https://doi.org/10.1061/(asce)la.1943-4170.0000272
]Search in Google Scholar
[
Nystrom, J. (2005). The definition of partnering as a Wittgenstein family resemblance concept. Construction Management and Economics, 23(5), 473–481. https://doi.org/10.1080/01446190500040026
]Search in Google Scholar
[
Ochs T., & Riemann, U. T. (2018). IT Strategy Follows Digitalisation. Encyclopaedia of Information Science and Technology, Fourth Edition, IGI Global, Hershey, Pennsylvania, USA.
]Search in Google Scholar
[
Oke, A. E., Aghimien, D. O., Aigbavboa, C. O., & Koloko, N. (2018). Challenges of Digital Collaboration in The South African Construction Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management Bandung, Indonesia, March 6–8, 2472–2482.
]Search in Google Scholar
[
Parn, E. A., & Edwards, D. (2019). Cyber threats confronting the digital built environment. Engineering Construction & Architectural Management, 26(2), 245–266. https://doi.org/10.1108/ecam-03-2018-0101
]Search in Google Scholar
[
Schwab, K. (2016). The Fourth Industrial Revolution. First edition. World Economic Forum.
]Search in Google Scholar
[
Stern, L. (2010). A visual approach to SPSS for Windows: a guide to SPSS 17.0, Second edition. Allyn & Bacon.
]Search in Google Scholar
[
Struková, Z., & Líška, M. (2012). Application of automation & robotics in construction work execution. Journal of Interdisciplinary Research, 2(2), 121–125.
]Search in Google Scholar
[
Tabachnick, B. G., & Fidell, LS (2007). Using Multivariate Statistics. Fifth edition. Allyn & Bacon.
]Search in Google Scholar
[
Tan, W. C. K. (2011). Practical Research Methods. Pearson Custom.
]Search in Google Scholar
[
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2009). Enhancing Total Quality Management by Partnering in Construction. Journal of Professional Issues in Engineering Education and Practice, 135(4), 129–141. https://doi.org/10.1061/(asce)1052-3928(2009)135:4(129)
]Search in Google Scholar
[
Teece, D. J., & Pisano, G. (1994). The dynamic capabilities of firms: an introduction. Working Paper for the International Institute for Applied Systems Analysis, 1–34.
]Search in Google Scholar
[
Teece, D. J. (2007). Explicating dynamic capabilities: the nature and microfoundations of (sustainable) enterprise performance. Strategic Management Journal, 28(13), 1319–1350. https://doi.org/10.1002/smj.640
]Search in Google Scholar
[
Teece, D. J., Pisano, G., & Shuen, A. (1997). Dynamic Capabilities & Strategic Management. Strategic Management Journal, 18(7), 509–533. https://doi.org/10.1002/(SICI)1097-0266(199708)18:7<509::AID-SMJ882>3.0.CO;2-Z
]Search in Google Scholar
[
Valdez-de-Leon, O. (2016). A Digital Maturity Model for Telecommunications Service Providers. Technology Innovation Management Review, 6(8), 19–32. https://doi.org/10.22215/timreview/1008
]Search in Google Scholar
[
Vollmer, C., & Egor, M. (2014). Five Rules for Strategic Partnerships in a Digital World, Strategy + Business. https://www.strategy-business.com/blog/Five-Rules-for-Strategic-Partnerships-in-a-Digital-World?gko=ebbc1
]Search in Google Scholar
[
Whalen, M. (2015). A digital transformation maturity model and your digital roadmap, A paper presented at the Agenda15 conference. http://www.agendaconference.com/wpcontent/uploads/2014/12/Whalen_IDC.pdf
]Search in Google Scholar
[
Wøien J., Hosseini, A., Klakegg, O. J., Lædre, O., & Lohne, J., (2016). Partnering elements' importance for success in the Norwegian construction industry. Energy Procedia, 96, 229–240. https://doi.org/10.1016/j.egypro.2016.09.130
]Search in Google Scholar
[
Zollo, M., & Winter, S. G. (2002). Deliberate learning and the evolution of dynamic capabilities. Organization Science, 13(3), 339–351. https://doi.org/10.1287/orsc.13.3.339.2780
]Search in Google Scholar