Uneingeschränkter Zugang

Design and Execution of Demolition Works By Blasting of Industrial Constructions – Technical and Safety Aspects


Zitieren

The paper describes the practical way and security conditions of realizing the demolition of an industrial chimney located in an oil refinery platform, having in the immediate vicinity sensitive equipment and constructions. The chimney has a height of 150 m and consists of the outer tubular structure of reinforced concrete and an inner chimney made of refractory brick masonry. In order to establish the possible secondary effects generated by the blasting works, a risk assessment was made with reference to seismic wave, air shock wave, noise, dust and the level of shock generated by the impact of chimney construction with the soil. The demolition work was carried out successfully and due to protection and safety measures no unwanted events were recorded, and the measured values of the seismic wave generated by the impact with the ground of the chimney were non-dangerous, being below the values estimated in the risk assessment.

eISSN:
2537-4869
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
4 Hefte pro Jahr
Fachgebiete der Zeitschrift:
Technik, Maschinenbau, Grundlagen des Maschinenbaus, Thermodynamik, Fertigung, Mechatronik und Automotive