Simulation of a Power System Considering Active Power Losses and Seasons
und
29. Mai 2021
Über diesen Artikel
Online veröffentlicht: 29. Mai 2021
Seitenbereich: 1 - 7
DOI: https://doi.org/10.2478/amset-2021-0001
Schlüsselwörter
© 2021 Lucian-Ioan Dulău et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
In this paper is presented the simulation of a power system. The simulations performed are considering the seasons (spring, summer, autumn and winter). The system has 39 buses, 46 power lines, 13 generating units, 19 loads and 2 storage units. Of the 13 generating units, 3 are distributed generation sources based on renewable energy. There are also 2 battery storage units. The simulation considers the active power supplied by the generating and storage units, respectively the active power losses. The results give the power supplied by each generating unit for each season.