This work is licensed under the Creative Commons Attribution 4.0 International License.
Monghasemi, S., & Abdallah, M. (2021). Linear optimization model to minimize total cost of repetitive construction projects and identify order of units. Journal of management in engineering, (4), 37.Search in Google Scholar
Sharma, S., & Bansal, V. K. (2018). Location-based planning and scheduling of highway construction projects in hilly terrain using gis. Canadian Journal of Civil Engineering, cjce-2017-0359.Search in Google Scholar
Dziurzanski, P., Zhao, S., Scholze, S., Zilverberg, A., & Indrusiak, L. S. (2020). Process planning and scheduling optimisation with alternative recipes. at - Automatisierungstechnik, 68(2), 140-147.Search in Google Scholar
Brunaud, B., Amaran, S., Bury, S., Wassick, J., & Grossmann, I. E. (2019). Novel approaches for the integration of planning and scheduling. Industrial and Engineering Chemistry Research, 58(43), 19973-19984.Search in Google Scholar
Amirian, H., & Sahraeian, R. (2017). Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm. Computers & Industrial Engineering, 107(MAY), 141-149.Search in Google Scholar
Pang, Q., Li, M., Yang, T., & Shen, Y. (2018). Supply chain coordination with carbon trading price and consumers’ environmental awareness dependent demand. Mathematical Problems in Engineering, 2018(PT.3), 1-11.Search in Google Scholar
Shilland, R., Grimsditch, G., Ahmed, M., Bandeira, S., & Huxham, M. (2021). A question of standards: adapting carbon and other pes markets to work for community seagrass conservation. Marine Policy, 129.Search in Google Scholar
Li, L., Dong, J., & Song, Y. (2020). Impact and acting path of carbon emission trading on carbon emission intensity of construction land: evidence from pilot areas in china. Sustainability, 12.Search in Google Scholar
Chen, X., Xu, J., Sawada, Y., & Yoshino, N. (2018). Carbon trading scheme in the people’s republic of china: evaluating the performance of seven pilot projects. Asian Development Review, 35(2), 131-152.Search in Google Scholar
Garcia-Nieves, J. D., Ponz-Tienda, J. L., Ospina-Alvarado, A., & Bonilla-Palacios, M. (2019). Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects. Automation in construction, 105(SEP.), 102799.1-102799.11.Search in Google Scholar
Zhang, L., Dai, G., Zou, X., & Qi, J. (2020). Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering Construction and Architectural Management, 27(10), 3095-3113.Search in Google Scholar
Tomczak, M., & Jaskowski, P. (2022). Harmonizing construction processes in repetitive construction projects with multiple buildings. Automation in construction, (Jul.), 139.Search in Google Scholar
Wang, Z., Zhao, J., & Li, M. (2017). Analysis and optimization of carbon trading mechanism for renewable energy application in buildings. Renewable and Sustainable Energy Reviews, 73, 435-451.Search in Google Scholar
Yadav, D., Mekhilef, S., Singh, B., & Rawa, M. (2021). Carbon trading analysis and impacts on economy in market-to-market coordination with higher pv penetration. IEEE Transactions on Industry Applications, (57-6).Search in Google Scholar
Weng, Q., & Xu, H. (2018). A review of china’s carbon trading market. Renewable and Sustainable Energy Reviews, 91(aug.), 613-619.Search in Google Scholar
Kable, A., Baker, A., Pond, D., Southgate, E., Turner, A., & Levi, C. (2019). Health professionals’ perspectives on the discharge process and continuity of care for stroke survivors discharged home in regional australia: a qualitative, descriptive study. Nursing & Health Sciences, 21.Search in Google Scholar
Niemimaa, M. (2017). Information systems continuity process: conceptual foundations for the study of the “social”. Computers & Security, 65(MAR.), 1-13.Search in Google Scholar
Hemberger, J., Witynski, G., & Gratton, C. (2022). Floral resource continuity boosts bumble bee colony performance relative to variable floral resources. Ecological Entomology, (4), 47.Search in Google Scholar
Sasaki, H., Maruya, H., Abe, Y., Fujita, M., & Egawa, S. (2020). Scoping review of hospital business continuity plans to validate the improvement after the 2011 great east japan earthquake and tsunami. The Tohoku Journal of Experimental Medicine, 251(3), 147-159.Search in Google Scholar