Application and Optimization of Equipment Abnormality Early Warning and Emergency Response Mechanism in Power Supply Service

,  und   
19. März 2025

Zitieren
COVER HERUNTERLADEN

Figure 1.

Data transmission process
Data transmission process

Figure 2.

Current model evaluation value and actual value
Current model evaluation value and actual value

Figure 3.

Comparison of bearing temperature evaluation value and actual value
Comparison of bearing temperature evaluation value and actual value

Figure 4.

Upper and lower alarm limits for supply fan current
Upper and lower alarm limits for supply fan current

Figure 5.

Upper and lower temperature alarm limits for fan bearing
Upper and lower temperature alarm limits for fan bearing

Figure 6.

System emergency flow chart
System emergency flow chart

Figure 7.

Simplified map of bus system in an area
Simplified map of bus system in an area

Gas content in transformer oil

Gas Content/(μL/L)
H2 31.2
CH4 6.5
C2H6 19.1
C2H4 4.6
C2H2 67.2

Power failure risk ranking of system nodes

Sort Node Load capacity /kW Blackout probability Risk / 10,000 yuan
1 3 10890 0.0915 49520
2 9 3850 0.2603 19560
3 7 790 0.5545 8660
4 12 2225 0.1958 15748
5 10 5675 0.1036 26479

System node weak spot sort

Sort Node Node weakness probability Voltage drop expectation /p.u Node voltage expectation /p.u
1 5 0.7798 0.2914 0.3922
2 11 0.6460 0.1811 0.3698
3 8 0.3221 0.1799 0.3587
4 9 0.0450 0.1569 0.3346
5 6 0.0123 0.1345 0.3248

Power loss load class

Load node class Lost power load node
1 3, 4, 11, 16, 17, 2
2 1, 5, 6, 7, 8, 10, 12, 13, 15
3 14, 20, 19, 18, 9