Balkau, B.J. (1975). A financial model for public works programmes. National ASOR Conference. Sydney: ASOR. Balkau B.J. 1975 A financial model for public works programmes National ASOR Conference Sydney ASORSearch in Google Scholar

Banki M.T. & Esmaeili B. (2009), The Effects of Variability of the Mathematical Equations and Project Categorizations on Forecasting S-Curves at Construction Industry. International Journal of Civil Engineering. Vol. 7(4), 258-270. Banki M.T. Esmaeili B. 2009 The Effects of Variability of the Mathematical Equations and Project Categorizations on Forecasting S-Curves at Construction Industry International Journal of Civil Engineering 74 258270Search in Google Scholar

Blyth, K. & Kaká, A.P. (2006). A novel multiple linear regression model for forecasting S-curves. Engineering. Construction and Architectural Management. Vol. 13 (1): 82-95. Blyth K. Kaká A.P. 2006 A novel multiple linear regression model for forecasting S-curves. Engineering Construction and Architectural Management 13 1 8295Search in Google Scholar

Bromilow, F.J. & Davies, V.F. (1978). Financial planning and control of large programmes of public works. In Second International Symposium on Organisation and Management of Construction, Organising and Managing Construction. Technion, Israel Institute of Technology, Haifa, Israel. Vol. 2: 119-133. Bromilow F.J. Davies V.F. 1978 Financial planning and control of large programmes of public works Second International Symposium on Organisation and Management of Construction, Organising and Managing Construction Technion, Israel Institute of Technology Haifa, Israel 2 119133Search in Google Scholar

Carlberg, C. (2012). Análisis estadístico con Excel. Madrid: Ediciones Anaya Multimedia. Carlberg C. 2012 Análisis estadístico con Excel Madrid Ediciones Anaya MultimediaSearch in Google Scholar

Chan, D.W.M. & Kumaraswamy, M.M. (1995). A Study of the Factors Affecting Construction Durations in Hong Kong. Construction Management and Economics, Vol. 13: 319-333. Chan D.W.M. Kumaraswamy M.M. 1995 A Study of the Factors Affecting Construction Durations in Hong Kong Construction Management and Economics 13 319333Search in Google Scholar

Del Castillo Puente, A. M. (2008). Axiomas Fundamentales de la Investigación de Mercados. La Coruña: Netbiblo, S.L. Del Castillo Puente A. M. 2008 Axiomas Fundamentales de la Investigación de Mercados La Coruña: Netbiblo, S.LSearch in Google Scholar

Granger, W. J. (1979). Seasonality: Causation, Interpretation, and Implications. Available at: http://www.nber.org/chapters/c3896 [Accessed on 21 November 2018]. Granger W. J. 1979 Seasonality: Causation, Interpretation, and Implications Available at http://www.nber.org/chapters/c3896 [Accessed on 21 November 2018]Search in Google Scholar

El-Rayes, K., and Moselhi, O. (2001). Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, ASCE, 127(2): 125-131. El-Rayes K. Moselhi O. 2001 Impact of rainfall on the productivity of highway construction Journal of Construction Engineering and Management, ASCE 1272 125131Search in Google Scholar

Heaps, A. & Domingo, N. (2014). Forecasting cash flow expenditure at pre-tender stage: Case studies in New Zealand construction projects. Available at: http://www.irbnet.de/daten/iconda/CIB_DC27661.pdf [Accessed on 21 November 2018]. Heaps A. Domingo N. 2014 Forecasting cash flow expenditure at pre-tender stage: Case studies in New Zealand construction projects Available at http://www.irbnet.de/daten/iconda/CIB_DC27661.pdf [Accessed on 21 November 2018]Search in Google Scholar

Kaká, A.P. & Price, A.D.F. (1993). Modelling standard cost commitment curves for contractors. Construction Management and Economics, Vol. 11: 271-283. Kaká A.P. Price A.D.F. 1993 Modelling standard cost commitment curves for contractors Construction Management and Economics 11 271283Search in Google Scholar

Kenley, R. & Wilson, O.D. (1989). A Construction Project Net Cash Flow Model. Construction Management and Economics, Vol. 7: 3-18. Kenley R. Wilson O.D. 1989 A Construction Project Net Cash Flow Model Construction Management and Economics 7 318Search in Google Scholar

Khosrowshahi, F. & Kaká, A. (2007). A decision support model for construction cash flow management. Computer-Aided Civil and Infraestructure Engeneering, Vol. 22: 527-539. Khosrowshahi F. Kaká A. 2007 A decision support model for construction cash flow management Computer-Aided Civil and Infraestructure Engeneering 22 527539Search in Google Scholar

Koehn, E. & Brown, G. (1985). Climatic Effects on Construction. Journal of Construction Engineering and Management, ASCE, 111(2), 129-137. Koehn E. Brown G. 1985 Climatic Effects on Construction Journal of Construction Engineering and Management, ASCE 1112 129137Search in Google Scholar

Odabasi, E. (2009). Models for Estimating Construction Duration: An Application for Selected Building on the Metu Campus. (Unpublished MSc Thesis). School of Natural and Applied Sciences of Middle East Technical University. Available at: https://etd.lib.metu.edu.tr/upload/12610696/index.pdf [Accessed on 21 November 2018]. Odabasi E. 2009 Models for Estimating Construction Duration: An Application for Selected Building on the Metu Campus. (Unpublished MSc Thesis) School of Natural and Applied Sciences of Middle East Technical University Available at https://etd.lib.metu.edu.tr/upload/12610696/index.pdf [Accessed on 21 November 2018]Search in Google Scholar

Ostojic, N. & Radujkovic, M. (2012). S-curve modelling in early phases of construction projects. GRADEVINAR, Vol. 64 (8): 647-654. Ostojic N. Radujkovic M. 2012 S-curve modelling in early phases of construction projects GRADEVINAR 64 8 647654Search in Google Scholar

Peer, S. (1982). Application of cost-flow forecasting models. Journal of the Construction Division, ASCE, Proc. Paper 17128, Vol. 108 (CO2): 226-232. Peer S. 1982 Application of cost-flow forecasting models. Journal of the Construction Division, ASCE Proc. Paper 17128 108 CO2 226232Search in Google Scholar

Skitmore, M.R. (1992). Parameter prediction for cash Flow Forecasting Models. Construction Management and Economics, Vol. 10 (5): 397-413. Skitmore M.R. 1992 Parameter prediction for cash Flow Forecasting Models Construction Management and Economics 10 5 397413Search in Google Scholar

Tucker, S.N. & Rahilly, M. (1982). A single project cash flow model for a microcomputer. Building Economist, December, Vol. 21 (3): 109-115. Tucker S.N. Rahilly M. 1982 A single project cash flow model for a microcomputer Building Economist, December 21 3 109115Search in Google Scholar

Valderrama, F. & Guadalupe, R. (2013). Predimensionado de tiempos mediante curvas “S” y duraciones en función del coste. In 17th International Congress on Project Management and Engineering. Logroño, 17-19th July 2013. AEIPRO: 279-291. Logroño. Spain. Valderrama F. Guadalupe R. 2013 Predimensionado de tiempos mediante curvas “S” y duraciones en función del coste 17th International Congress on Project Management and Engineering Logroño, 17-19th July 2013. AEIPRO 279291 Logroño. SpainSearch in Google Scholar

Wiliams, R.C. (2008). The Developement of Mathematical Models for Preliminary Prediction of Highway Construction Duration. (Unpublished Thesis). Dissertation submitted to the faculty of Virginia Polytechnic Institute and State University: 160. Blacksburg, Virginia, EE.UU. Available at: https://vtechworks.lib.vt.edu/handle/10919/29483 [Accessed on 21 November 2018]. Wiliams R.C. 2008 The Developement of Mathematical Models for Preliminary Prediction of Highway Construction Duration. (Unpublished Thesis) Dissertation submitted to the faculty of Virginia Polytechnic Institute and State University: 160 Blacksburg, Virginia EE.UU. Available at https://vtechworks.lib.vt.edu/handle/10919/29483 [Accessed on 21 November 2018]Search in Google Scholar