EX-ANTE ANALYSIS MODEL OF THE COST-EFFECTIVENESS OF ENVIRONMENTAL POLICY REGULATIONS
06. Aug. 2019
Über diesen Artikel
Artikel-Kategorie: review
Online veröffentlicht: 06. Aug. 2019
Seitenbereich: 119 - 130
Eingereicht: 18. Jan. 2019
Akzeptiert: 27. März 2019
DOI: https://doi.org/10.21307/acee-2019-028
Schlüsselwörter
© 2019 Elzbieta BRONIEWICZ et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 1.
![The use of ex-post and ex-ante analyses in environmental policy. Source: own elaboration based on [2]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/64706f4783f1392090d6977e/j_acee-2019-028_fig_001.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250907%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250907T020324Z&X-Amz-Expires=3600&X-Amz-Signature=ad9b3c8b97b1e10e4227266945a37d190925309d5590b15ad45de5ba9ced527d&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 2.

Figure 3.
![Forecasted value of gross cost efficiency in 2020 in period I (2002–2007) and period II (2008–2013) [million PLN/% emission reduction compared to the base year 1998], fixed costs in 2013. Source: own elaboration](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/64706f4783f1392090d6977e/j_acee-2019-028_fig_003.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250907%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250907T020324Z&X-Amz-Expires=3600&X-Amz-Signature=db76461ee5a52257ece142818e702f5e76c8024481d74c9683c29958bf8c192b&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 4.
![The actual and projected value of the environmental effect in 2020 in period I (2002–2007) and period II (2008–2013) [percentage of emission reductions compared to the base year 1998]. Source: own elaboration](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/64706f4783f1392090d6977e/j_acee-2019-028_fig_004.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250907%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250907T020324Z&X-Amz-Expires=3600&X-Amz-Signature=4397a6e93677d36f6ab5b1839ed88a6ca1c1817d4286168cb532f72c8677b0f2&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
The environmental effect
Detailed list | Year of analysis | |||||
---|---|---|---|---|---|---|
I period of analysis | ||||||
2002 | 2003 | 2004 | 2005 | 2006 | 2007 | |
Environmental effect [% of CO2reduction] | 33.945 | 30.759 | 31.496 | 31.719 | 29.627 | 31.634 |
|
||||||
|
|
|
|
|
|
|
33.988 | 33.988 | 33.988 | 33.988 | 33.988 | 33.988 |
The measures of matching and verification of linearised time series models of cost-effectiveness time series
Specification | Measurements of model fit and verification | |||
---|---|---|---|---|
R2 | The standard error of estimation | Statistics F | p | |
Gross Costs | ||||
The first period | 0.5421 | 1.939 | 4.7351 | 0.0952 |
The second period | 0.5505 | 1.851 | 4.8985 | 0.0912 |
|
||||
The first period | 0.5475 | 1.870 | 4.8409 | 0.0926 |
The second period | 0.2095 | 1.924 | 1.0603 | 0.3613 |
Cost-effectiveness of CO2 reduction measures in the years 2002–2013 [million PLN/percentage of CO2 emission reduction, related to the 1988 emission level], fixed prices in 2013
Analysis period | Year | Cost-effectiveness in relation to gross costs | Cost-effectiveness in relation to net costs |
---|---|---|---|
|
2002 | 35.9693 | 35.1902 |
2003 | 41.5068 | 40.6470 | |
2004 | 39.5434 | 38.7038 | |
2005 | 39.3764 | 38.5426 | |
2006 | 43.6976 | 42.6623 | |
2007 | 40.3013 | 39.4591 | |
II period | 2008 | 36.3873 | 35.6034 |
2009 | 36.5995 | 33.7905 | |
2010 | 41.2125 | 38.1665 | |
2011 | 42.3502 | 39.2228 | |
2012 | 39.0837 | 36.0018 | |
2013 | 40.6166 | 37.0052 |
The measures of verification and matching of single equation cost-effectiveness models
Specification | The Measurements of model fit and verification | |||
---|---|---|---|---|
R2 | A standard error of estimation | F statistics | p | |
The first period | 0.96524 | 0.34206 | 41.649 | 0.00648 |
The second period | 0.97612 | 0.28694 | 27.252 | 0.03560 |