[
Chinneck, J.W. (2009) Operations research and cyber-infrastructure. Tailoring classifier hyperplanes to general metrics. Springer, 365-387.10.1007/978-0-387-88843-9
]Search in Google Scholar
[
El Bassuony, M. (2016) Time-cost-quality trade-off analysis for construction projects. Master thesis. School of Sciences and Engineering, American University in Cairo.
]Search in Google Scholar
[
El-Rayes, K. & Kandil, A. (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), 477-486.10.1061/(ASCE)0733-9364(2005)131:4(477)
]Search in Google Scholar
[
Hegazy, T. (2002) Computer-Based Construction Project Management. Ontario, Prentice Hall.
]Search in Google Scholar
[
Hinze, J. (2004) Construction planning and scheduling, New York, Pearson/Prentice Hall.
]Search in Google Scholar
[
Patre, A.D. & Ugale, A.B. (2020) Indirect cost in construction project. Aegaeum Journal, 8(5), 925-928.
]Search in Google Scholar
[
Rao, R.V., Savsani, V.J. & Vakharia, D.P. (2011) Teaching-learning-based optimization: a novel method for constrained mechanical design optimization problems. Computer-Aided Design, 43(3), 303-315.10.1016/j.cad.2010.12.015
]Search in Google Scholar
[
Rao, R.V., Savsani, V.J. & Vakharia, D.P. (2012) Teaching-learning-based optimization: an optimization method for continuous non-linear large scale problems. Information Sciences, 183(1), 1-15.10.1016/j.ins.2011.08.006
]Search in Google Scholar
[
Vishnu, V., Achu, V., Riyana, M.S. & Jayakrishnan, R. (2018) Time-cost-risk optimization in construction work by using ant colony algorithm. International Research Journal of Engineering and Technology, 5(4), 2298-23.
]Search in Google Scholar
[
Zhang, H. & Xing, F. (2010) Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction. Automation in Construction, 19, 1067-1075.10.1016/j.autcon.2010.07.014
]Search in Google Scholar