Uneingeschränkter Zugang

It Systems Supporting the Management of Production Capacity


Zitieren

[1] ANSI/ISA-95.00.03-2005. Enterprise-control system integration. Part 3: Activity models of manufacturing operations management, 2005. ISBN 1-55617-955-3.Search in Google Scholar

[2] A. Atamturk, M.W.P. Savelsbergh. „Integer programming software systems”. Annals of Operations Research, vol. 140(1), 2005, pp. 67-124.10.1007/s10479-005-3968-2Search in Google Scholar

[3] R. Basu, J.N. Wright. „Resource and capacity management”. Total Supply Chain Management. Chapter 5, 2008.10.1016/B978-0-7506-8426-2.50009-5Search in Google Scholar

[4] M. Berglund, J. Karlun. „Human, technological and organizational aspects influencing the production scheduling process”. International Journal of Production Economics, vol. 110(1-2), 2007, pp. 160-174.10.1016/j.ijpe.2007.02.024Search in Google Scholar

[5] P.M.M. Bongers, B. H. Bakker. „Application of multi-stage scheduling”. In proceedings of 16th ESCAPE. Computer Aided Chemical Engineering, vol. 21, 2006, pp. 1917-1922.10.1016/S1570-7946(06)80328-7Search in Google Scholar

[6] M. Brzeziński (Ed.). Organizacja i sterowanie produkcją. Projektowanie systemów produkcyjnych i procesów sterowania produkcją. Warszawa: A.W. Placet, 2002.Search in Google Scholar

[7] O. Rogelio, W. Noel. „Cross-functional alignment in supply chain planning: A case study of sales and operations planning”. Journal of Operations Management, vol. 29(5), 2011, pp. 434-448.10.1016/j.jom.2010.11.012Search in Google Scholar

[8] P.M. Castro, L.J. Zeballos, C.A. Méndez. „Hybrid time slots sequencing model for a class of scheduling problems”. AIChE Journal, vol. 58(3), 2012, pp. 789–800.10.1002/aic.12609Search in Google Scholar

[9] M. Christopher. Logistics and Supply Chain Management: Creating Value-Adding Networks. London: Pearson Education Limited, 2005.Search in Google Scholar

[10] S. Chopra, P. Meindl. Supply chain management: strategy, planning and operation. New Jersey: Upper Saddle River, 2003.Search in Google Scholar

[11] I. Durlik. Inżynieria zarządzania. Strategia i projektowanie systemów produkcyjnych. Warszawa: A.W. Placet, 1995.Search in Google Scholar

[12] M.C. Georgiadis, A.A. Levis, P. Tsiakis, L. Sanidiotis, C.C. Pantelides, L.G. Papageorgiou. „Optimisation-based scheduling: A discrete manufacturing case study”. Computers & Industrial Engineering, vol. 49(1), 2005, pp. 118-145.10.1016/j.cie.2005.02.004Search in Google Scholar

[13] Z. Li, M. Ierapetritou. „Process scheduling under uncertainty: Review and challenges”. Computers & Chemical Engineering, vol. 32(4-5), 2008, pp. 715-727.10.1016/j.compchemeng.2007.03.001Search in Google Scholar

[14] A.G. De Kok, S.C. Graves (Eds). „Handbook in operations research and management science”. Supply Chain Management: Design, Coordination and Operation, vol. 11, 2003, Amsterdam: Elsevier, pp. 457-524.Search in Google Scholar

[15] S. Kreipl, J.D. Dickersbach. „Scheduling coordination problems in supply chain planning”. Annals of Operations Research, vol. 161(1), 2008, pp. 103-122.10.1007/s10479-007-0293-ySearch in Google Scholar

[16] C.T. Maravelias, C. Sung. „Integration of production planning and scheduling: Overview, challenges and opportunities”. Computers & Chemical Engineering, 33(12), 2009, pp. 1919-1930.10.1016/j.compchemeng.2009.06.007Search in Google Scholar

[17] H. Meyr, M. Wagner, J. Rohde. „Structure of Advanced Planning Systems”. In: H. Stadtler, C. Kilger (Eds). Supply Chain Management and Advanced Planning. Concepts, Models, Software and Case Studies. Berlin: Springer, 2005, pp. 109-115.Search in Google Scholar

[18] E. Milewska. „Wykorzystanie narzędzi informatycznych w procesie sterowania strumieniem przepływu materiałowego”. Mechanik, vol. 84(7), 2011, pp. 575-582.Search in Google Scholar

[19] E. Milewska. „Sterowanie strumieniem przepływu zasobów na przykładzie produkcji naczyń kamionkowych”, Ekonomika i Organizacja Przedsiębiorstwa, vol. 5, 2009, [in: CD], In proceedings of 6th International Scientific Conference „Systems Supporting Environment Management”, pp. 83-92.Search in Google Scholar

[20] E. Pająk. Zarządzanie produkcją. Produkt, technologia, organizacja. Warszawa: PWN, 2006.Search in Google Scholar

[21] K. Pasternak. Zarys zarządzania produkcją. Warszawa: PWE, 2005.Search in Google Scholar

[22] J. Rohde, M. Wagner. „Master Planning”. In: H. Stadtler, C. Kilger (Eds). Supply Chain Management and Advanced Planning. Concepts, Models, Software and Case Studies. Berlin: Springer, 2005, pp. 159-177.Search in Google Scholar

[23] H. Stadtler. „Supply chain management and advanced planning – basics, overview and challenges”. European Journal of Operations Research, vol. 163, 2005, pp. 575-588.10.1016/j.ejor.2004.03.001Search in Google Scholar

[24] M. Taal, C.J. Wortmann. „Integrating MRP and finite capacity planning”. Production Planning and Control, vol. 8(3), 1997, pp. 245-254.10.1080/095372897235307Search in Google Scholar

[25] V.C.S Wiers. „A case study on the integration of APS and ERP in a steel processing plant”. Production Planning and Control, vol. 13(6), 2002, pp. 552-560.10.1080/09537280210160321Search in Google Scholar

[26] V.C.S. Wiers, W.T. Van Der Schaaf. „A framework for decision support in production scheduling tasks”. Production Planning and Control, vol. 8(6), 1997, pp. 533-544.10.1080/095372897234876Search in Google Scholar

[27] J.C. Wortmann, D.R. Muntslag, P.J.M. Timmermans. Customer-driven manufacturing, London: Chapman & Hall, 1997.10.1007/978-94-009-0075-2_4Search in Google Scholar

[28] J. Wu, M. Ulieru, M. Cobzaru, D. Norrie. Supply Chain Management Systems: state of the art and vision, In proceedings of 9th International Conference on International Conference on Management of Innovation and Technology IEEE, 2000, pp. 759-764.Search in Google Scholar

eISSN:
2450-5781
Sprache:
Englisch