[
Baskent, E. Z., Keles, S., 2005: Spatial forest planning: A review. Ecological Modelling, 188:145–173.
]Search in Google Scholar
[
Borges, P., Bergseng, E., Eid, T., Gobakken, T., 2015: Impact of maximum opening area constraints on profitability and biomass avalability in forestry – A large, real world case. Silva Fennica 49:1–21.
]Search in Google Scholar
[
Bruce, J. C., Han, H. S., Akay, A. E., Chung, W., 2011: ACCEL: Spreadsheet-Based Cost Estimation for Forest Road Construction. Western Journal of Applied Forestry, 26:189–197.
]Search in Google Scholar
[
Buongiorno, J., Gilles, J. K., 2003: Decision methods for forest resource management. Academic Press, 439 p.
]Search in Google Scholar
[
Crowe, K. A., Nelson, J. D., Boyland, M., 2003: Solving the area-restricted harvest scheduling model using the branch and bound algorithm. Canadian Journal of Forest Resource, 33:1804–1814.
]Search in Google Scholar
[
Emmingham, W. L., Oester, P., Bennett, M., Kukulka, F., Conrad, K., Michel, A., 2002: Comparing short-term financial aspects of four management options in Oregon: implications for uneven-aged management. Forestry, 75:489–494.
]Search in Google Scholar
[
Falcão, A. O., Borges, J. G., 2003: Heuristics for integrating strategic and operational levels in large scale forest management problems. Scientia Forestalis, 63:94–102.
]Search in Google Scholar
[
Hokans, R. H., 1983: Evaluating spatial feasibility of harvest schedules with simulated stand-selection decisions. Journal of Forestry, 81:601–603.
]Search in Google Scholar
[
Kašpar, J., Marušák, R., Bettinger P., 2016: Time Efficiency of Selected Types of Adjacency Constraints in Solving Unit Restriction Models. Forests, 7:102.
]Search in Google Scholar
[
Konôpka, J., Konôpka, B., 2008: Prognóza náhodných ťažieb v smrečinách v dôsledku mechanicky pôsobiacich abiotických škodlivých činiteľov v oblasti Kysuce a Orava, Tatry, Spiš, Slovenské rudohorie. Lesnícky časopis - Forestry Journal, 54:325–346.
]Search in Google Scholar
[
Lockwood, C., Moore, T., 1993: Harvest scheduling with spatial constraints: A simulated annealing approache. Canadian Journal of Forest Resource, 23:468–478.
]Search in Google Scholar
[
Lohmander, P., Helles, F., 1987: Windthrow probability as a function of stand characteristics and shelter. Scandinavian Journal of Forest Research, 2:227–238.
]Search in Google Scholar
[
Marušák, R., Kašpar, J., 2015: Spatially-constrained harvest scheduling with respect to environmental requirements and silvicultural system. Lesnícky časopis-Forestry Journal, 61:71–77.
]Search in Google Scholar
[
Marušák, R., Kašpar, J., Vopěnka, P., 2015: Decision Support System (DSS) Optimal – A case study from the Czech Republic. Forests, 6:163–182.
]Search in Google Scholar
[
McDill, M., Rebain, S., Braze, J., 2002: Harvest scheduling with area-based adjacency constraints. Forest Science, 48:631–642.
]Search in Google Scholar
[
Murray, A. T., 1999: Spatial Restrictions in Harvest Scheduling. Forest Science, 45:45–52.
]Search in Google Scholar
[
Murray, A. T., Weintraub, A., 2002: Scale and unit specification influences in harvest scheduling with maximum area restrictions. Forest Science, 48:779–789.
]Search in Google Scholar
[
Öhman, K., Eriksson, L. O., 2010: Aggregating harvest activities in long term forest planning by minimizing harvest area perimeters. Silva Fennica, 44:77–89.
]Search in Google Scholar
[
Palma, C. D., Nelson, J. D., 2013: A Robust Model for Protecting Road-Building and Harvest-Scheduling Decisions from Timber Estimate errors. Forest Science, 60:137–148.
]Search in Google Scholar
[
Pasalodos-Tato, M., Mäkinen, A., Garcia-Gonzalo, J., Borges, J. G., Lämås, T., Eriksson, L. O., 2013: Review. Assessing uncertainty and risk in forest planning and decision support systems: review of classical methods and introduction of innovative approaches. Forest Systems, 22:282–303.
]Search in Google Scholar
[
Richards, E. W., Gunn, E. A., 2000: A Model and Tabu Search Method to Optimize Stand Harvest and Road Construction Schdeules. Forest Science, 46:188–203.
]Search in Google Scholar
[
Spinelli, R., Owende, P. M. O., Ward, S. M., Ronero, M., 2004: Comparison of Short-Wood Forwarding Systems Used in Iberia. Silva Fennica, 38:85–94.
]Search in Google Scholar
[
Tiernan, D., Nieuwenhuis, M., 2005. Financial optimisation of forest-level harvest scheduling in Ireland – A case study. Journal of Forest Economics, 11:21–43.
]Search in Google Scholar
[
Vopěnka, P., Kašpar, J., Marušák, R., 2015: GIS tool for optimization of harvest-scheduling. Computers and Electronics in Agriculture, 113:254–259.
]Search in Google Scholar
[
Zeng, H., Peltola, H., Talkkari, A., Venalainen, A., Strandmanm H., Kellomäki, S. et al., 2004: Influence of clear-cutting on the risk of wind damage at forests edges. Forest and Ecology Management, 203:77–88.
]Search in Google Scholar
[
Zeng, H., Peltola, H., Väisänen, H., Kellomäki, S., 2009: The effects of fragmentation on the susceptinility of boreal forest ecosystem to wind damage. Forest Ecology and Management, 257:1165–1173.
]Search in Google Scholar