1. bookVolume 114 (2017): Issue 9 (September 2017)
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
access type Open Access

Optimisation of the choice of UAV intended to control the implementation of construction projects and works using the AHP method

Published Online: 29 May 2020
Volume & Issue: Volume 114 (2017) - Issue 9 (September 2017)
Page range: 117 - 125
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
Abstract

Modern technologies, which may include unmanned aerial vehicles (UAV, Polish abbreviation BSL), potentially have a very wide range of applications. Research has been conducted on the possibility of using UAVs to control the execution of construction works by the authors of the article among other researchers. The technical parameters of the applied measurement instruments are of great significance. This paper presents a possibility for the optimal choice of unmanned aerial vehicles using the AHP method. The popularity of this method results not only from its effectiveness in solving complex decision problems, but also from its transparency and ease of application. The decision-making analysis adopts the criteria that are essential with regard to the supervision of construction works which they may support.

Keywords

[1] Cavoukian A., Privacy and Drones: Unmanned Aerial Vehicles, Information and Privacy Commissioner of Ontario, Canada 2012.Search in Google Scholar

[2] Kowalski P., Bielecki K., Zastosowanie termowizji z wykorzystaniem dronów w budownictwie, http://www.inzynierbudownictwa.pl (access: 07.03.2016).Search in Google Scholar

[3] Skorupka D., Duchaczek A., Waniewska A., Kowacka M., Optimization of the choice of unmanned aerial vehicles used to monitor the implementation of selected construction projects, Proceedings of the International Conference on Numerical Analysis and Applied Mathematics 2016, ICNAAM-2016, Simos T.E., Tsitouras C. (eds.), Numerical Analysis and Applied Mathematics, Rhodes, Greece, 19.09–25.09.2016.Search in Google Scholar

[4] Sobolewski J., Wykorzystanie dronów do oblotu sieci elektroenergetycznych, http://www.rynek-gazu.cire.pl/pliki/2/wykorzystaniedronowdooblotusiecielektroenergetycznych.pdf (access: 07.03.2016).Search in Google Scholar

[5] http://www.dji.com/product/phantom-4 (access: 07.03.2016).Search in Google Scholar

[6] Audronis T., Drony. Wprowadzenie, HELION, Gliwice 2015.Search in Google Scholar

[7] Saaty T.L., Some Mathematical Concepts of the Analytic Hierarchy Process, Behaviormetrika, 29, 1991, 1–9.10.2333/bhmk.18.29_1Search in Google Scholar

[8] Saaty T.L., Vargas L., Models, Methods, Concepts and Applications of the Analytic Hierarchy Process, Kluwer Academic Publishing, Boston 2001.10.1007/978-1-4615-1665-1Search in Google Scholar

[9] Ostręga A., Sposoby zagospodarowania wyrobisk i terenów po eksploatacji złóż surowców węglanowych na przykładzie Krzemionek Podgórskich w Krakowie, Ph.D. thesis, Faculty of Mining and Geoengineering, AGH University of Science and Technology, Kraków 2004.Search in Google Scholar

[10] Teknomo K., Analytic Hierarchy Process. Kardi Teknomo’s Homepage, http://people.revoledu.com/kari/tutorial/AHP/AHP.htm (access: 07.03.2016).Search in Google Scholar

[11] Duchaczek A., Skorupka D., Evaluation of probability of bridge damage as a result of terrorist attack, Archives of Civil Engineering, 2013, 59(2), 215–227.10.2478/ace-2013-0011Search in Google Scholar

[12] Skorupka D., Duchaczek A., Metoda oceny ryzyka uszkodzeń obiektów komunikacyjnych w warunkach kryzysowych (Damage risk assessment method of bridge objects in conditions of crisis), [in:] Inżynieria przedsięwzięć budowlanych: rekomendowane metody i techniki, Kasprowicz T. (ed.), Warsaw University and Technology, Publishing House: Section of Engineering Projects Construction KILiW PAN: Polish Chamber of Civil Engineers, 2015, 209–228.Search in Google Scholar

[13] Duchaczek A., Skorupka D., A Risk Assessment Method of Bridge Facilities Damage in the Aspect of Potential Terrorist Attacks, Periodica Polytechnica Civil Engineering, 2016, 60(2), 189–198.10.3311/PPci.7627Search in Google Scholar

[14] Kapliński O., Janusz L., Three phases of multifactor modelling of construction processes, Journal of Civil Engineering and Management, 2006, 12(2), 127–134.10.3846/13923730.2006.9636384Search in Google Scholar

[15] Kasprowicz T., Cost-time scheduling of construction works execution, J. Infrastructure Planning and Management, 2000, 660 (IV–49).10.2208/jscej.2000.660_125Search in Google Scholar

[16] Połoński M., The analysis of the reliability of realization cost and investments, time-limits in Warsaw, Electronic Journal of Polish Agricultural Universities Topic Civil Engineering, 2006, 9(4), #10.Search in Google Scholar

[17] Sobotka A., Czarnigowska A., Analysis of supply system models for planning construction project logistics, Journal of Civil Engineering and Management, 2005, 11(1), 73–82.10.3846/13923730.2005.9636335Search in Google Scholar

[18] Plebankiewicz E., Leśniak A., Overhead costs and profit calculation by Polish contractors, Technological and Economic Development of Economy, 2013, 19.1, 141–161.10.3846/20294913.2012.763008Search in Google Scholar

Recommended articles from Trend MD

Plan your remote conference with Sciendo