1. bookVolume 114 (2017): Issue 8 (August 2017)
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
Open Access

Optimization of Construction Schedules with the Assumed Multi-Tasking of Working Brigades

Published Online: 26 May 2020
Volume & Issue: Volume 114 (2017) - Issue 8 (August 2017)
Page range: 109 - 118
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
Abstract

The paper presents a newly developed model aimed at minimizing the downtime in working brigades work. The developed method is dedicated to the construction planned using the stream method of work organization. The model focuses on the assumption of multi-tasking of working brigades. It has been possible to model the performance depending on the type of brigade and the type of work being performed. The article also shows an example illustrating the results of the model’s operation.

Keywords

[1] Biruk S., Jaśkowski P., Scheduling construction of multi-object projects: problem of works continuity in consecutive units, Zeszyty Naukowe WSOWL, 3 (157), 2010, 340–349.Search in Google Scholar

[2] Hejducki Z., Scheduling Model of Construction Activity with Time Couplings, Journal of Civil Engineering and Management, 9:4, 2003, 284–291.10.1080/13923730.2003.10531341Search in Google Scholar

[3] Krzemiński M., Use of the KASS Program in Scheduling, Technical Transaction, 2-B(6), 2014, 217–224.Search in Google Scholar

[4] Marcinkowski R., Metody rozdziału zasobów realizatora w działalności inżynieryjno - budowlanej, WAT, Warszawa 2002.Search in Google Scholar

[5] Pinedo M.L., Scheduling: Theory, Algorithms, and Systems, Springer, 2012.10.1007/978-1-4614-2361-4Search in Google Scholar

[6] Rogalska M., Bożejko W., Hejducki Z., Time/Cost Optimization Using Hybrid Evolutionary Algorithm in Construction Project Scheduling, Automotion in Construction, 18, 2008, 24–31.10.1016/j.autcon.2008.04.002Search in Google Scholar

Recommended articles from Trend MD

Plan your remote conference with Sciendo