1. bookVolume 114 (2017): Issue 5 (May 2017)
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
access type Open Access

The Identification of Hazards Concerning the Character of Construction Works on Railway Sites in Poland

Published Online: 26 May 2020
Volume & Issue: Volume 114 (2017) - Issue 5 (May 2017)
Page range: 47 - 55
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
Abstract

The railway investment in Poland is subject to many random factors, which have a significant impact on extending the deadline and increasing the planned cost. Railway investments are characterized by their distinctiveness in comparison to other construction works. To minimize the occurrence of unforeseen, random risks in future rail investments, the authors attempted to identify and indicate the most likely of them. The analysis concerns the implementation of railway investments in Poland, taking into account its legal and technical characteristics. The basic method of identifying the hazards of railway investments in Poland was a case study. The main threats were: bad preparation of the main contractor, difficulties in obtaining maps for design purposes, delay in the design documentation with external stakeholders, the award of contractor closures, difficulties in carrying out works related to encountering undeclared underground infrastructure and other hidden obstacles as well as the influence of the contracting party’s internal procedures on the course of the contract.

Keywords

[1] D-19, Instrukcja o organizacji i wykonywaniu pomiarów w geodezji kolejowej. Załącznik do Zarządzenia nr 144 Zarządu PKP S.A, Warszawa 2000.Search in Google Scholar

[2] Liu D., Jiang X., Meng L., Ge Y., Minimizing Investment Risk of Integrated Rail and TransitOriented-Development Projects over Years in a Linear Monocentric City, Discrete Dynamics in Nature and Society, Vol. 2016, Article ID 1840673, 2016. doi:10.1155/2016/1840673.10.1155/2016/1840673Search in Google Scholar

[3] Ig-1, Rodzaje i obieg dokumentacji geodezyjno-kartograficznej wykonywanej na poszczególnych etapach modernizacji linii kolejowych, Załącznik nr 1 do zarządzenia nr 33/2015 Zarządu PKP Polskie Linie Kolejowe S.A., Warszawa 2010.Search in Google Scholar

[4] Kampczyk A., Opracowanie map do celów projektowych w aspekcie realizacji inwestycji — The preparation of maps to project aims in aspect of realization of investment, Technika Transportu Szynowego, 2015, 40–47.Search in Google Scholar

[5] Latawiec T., Zmiana modelu realizacji inwestycji kolejowych potrzebna od zaraz, www.rynekinfrastruktury.pl/wiadomosci/zmiana-modelu-realizacji-inwestycji-kolejowychpotrzebna-od-zaraz-53472.html (access: 07.04.2016).Search in Google Scholar

[6] Li Q., Liu R., Zhang J., Sun Q., Quality risk management model for railway construction projects, International Symposium on Safety Science and Technology. Procedia Engineering 84, 2014, 195–203.10.1016/j.proeng.2014.10.426Search in Google Scholar

[7] Majdras J., Luka inwestycyjna jeszcze większa. PLK wyda tylko 4,3 mld zł, www.rynekkolejowy.pl/wiadomosci/luka-inwestycyjna-jeszcze-wieksza-plk-wyda-tylko-43-mld-zl-75572.html (access: 29.02.2016).Search in Google Scholar

[8] Ploywarin S., Song Y., Analysis of Risk-Response based on Railroad Construction Project. International Journal of Management Sciences and Business Research, 2014, Vol. 3, Issue 12.Search in Google Scholar

[9] Połoński M., Kowalski J., Problemy na etapie uzgadniania dokumentacji projektowej na kontraktach kolejowych z zastosowaniem Warunków Kontraktowych FIDIC, Miesięcznik Materiały budowlane, Vol. 6/2016, 162–163.10.15199/33.2016.06.70Search in Google Scholar

[10] Raport z „Forum Kolejowego Railway Business Forum” w sprawie problemów realizacji inwestycji w infrastrukturze kolejowej, Warszawa, 09/2012.Search in Google Scholar

[11] Sunduck D. SUH, Ph.D., P.E., Risk management in a large-scale new railway transport system project, International Association of Traffic and Safety Sciences, Tokyo 2000, IATSS Research, Vol. 24 (No. 2).10.1016/S0386-1112(14)60029-7Search in Google Scholar

[12] Szymajda M., Rząd chce zmniejszyć lukę inwestycyjną. Pomogą szybkie rewitalizacje?, www.rynek-kolejowy.pl/wiadomosci/rzad-chce-zmniejszyc-luke-inwestycyjna-pomogaszybkie-rewitalizacje-76014.html (access: 30.03.2016).Search in Google Scholar

[13] Tang J., Wang Y., Risk management methods on high-speed railway construction, International Conference on Information Management, Innovation Management and Industrial Engineering, 2013, 237–239.Search in Google Scholar

[14] Wang L., LI Y., Wang E., Research on risk management of railway engineering construction, International Conference on Risk and Engineering Management, 2011, 174–180.10.1016/j.sepro.2011.08.029Search in Google Scholar

Recommended articles from Trend MD

Plan your remote conference with Sciendo