Influence, of time randomness execution of work, on lenght of the construction cycle

Published Online: 23 May 2020
Volume & Issue: Volume 114 (2017) - Issue 3 (March 2017)
Page range: 115 - 123
Journal Details
License
Format
Journal
eISSN
2353-737X
First Published
20 May 2020
Publication timeframe
1 time per year
Languages
English
Abstract

The objective of this paper is to analyse the time reserves in scheduling periods for conducting processes that ensure construction deadlines can be met. By using the probability account and numerical analyses methods, including ‘Monte Carlo’, execution cycles have been analysed, as well as summary stoppage times for executing teams and working areas. On the basis of calculations made using data from studies made during the construction office building in Krakow it was stated that in order to keep to the planned deadline, must be smaller periods of performance of works by individual brigades, an average of 0,103 times of rhythm.

Keywords

[1] Cho C., Shin Y., Park J., Lee. Y., Cho M., Lifting load calculation method of computing simulation for super-tall building construction, The 29th International Symposium of Automation and Robotics in Construction, Eindhoven, Netherlands 2012.10.4017/gt.2012.11.02.396.00Search in Google Scholar

[2] Belniak S. et al., Zastosowanie metod matematycznych w wybranych problemach zarządzania w budownictwie, Wydawnictwo Politechniki Krakowskiej, Kraków 2015.Search in Google Scholar

[3] Dyżewski A., Doktryna pracy równomiernej w realizacji budowlanej, PWG, Warszawa 1949.Search in Google Scholar

[4] International Standard ISO 10005: 2005. Quality management systems – Guidelines for quality plans.Search in Google Scholar

[5] Jaworski K., Metodologia projektowania realizacji budowy, Państwowe Wydawnictwo Naukowe PWN, Warszawa 2009.Search in Google Scholar

[6] Kenzo K., Nobuyuki N., Efficient Monte Carlo simulation method of GERT-type network for project management, Elsevier, Computers & Industrial Engineering, V. 42, I. 2–4, P. 521–531, New York 2002.10.1016/S0360-8352(02)00050-5Search in Google Scholar

[7] Mrozowicz J., Metody potokowe organizacji procesów budowlanych o charakterze deter-ministycznym, Prace Naukowe Instytutu Budownictwa PWr, nr 32, Monografie, nr 14, Wydawnictwo PWr, Wrocław 1982.Search in Google Scholar

[8] Pritchard C., Risk Management: Concepts and Guidance, Fourth Edition, ESI, 2010.10.1201/9781439842201Search in Google Scholar

[9] Shtub A., Bard J., Shlomo G., Project Management. Engineering, Technology, and Implementation, Prentice Hall, Englewood Cliffs, New Jersey 1994.Search in Google Scholar

[10] Wątorski J., Organizacja i mechanizacja budowy, Cz. III, PWN, Kraków–Warszawa–Łódź 1965.Search in Google Scholar

[11] Więckowski A., Principles of the NNM method applied in the analysis of process realisation, Automation in Construction, Elsevier Science BV, Amsterdam–London–New York–Paris–Shannon–Tokyo 2002, vol. 11/4, 409–420.10.1016/S0926-5805(01)00073-5Search in Google Scholar

[12] A. Więckowski, Time reserves in the realizations of building, Creative Construction Conference, Krakow 2015, Poland, 482–492.Search in Google Scholar

[13] http://opolskabusinesspark.pl/Search in Google Scholar

Recommended articles from Trend MD

Plan your remote conference with Sciendo