This work is licensed under the Creative Commons Attribution 4.0 International License.
Abdelsalam, H. M., & Gad, M. M. (2009). Cost of quality in Dubai: An analytical case study of residential construction projects. International Journal of Project Management, 27(5), pp. 501–511.AbdelsalamH. M.GadM. M.2009Cost of quality in Dubai: An analytical case study of residential construction projects27550151110.1016/j.ijproman.2008.07.006Search in Google Scholar
Abdul-Rahman, H. (1993). Capturing the cost of quality failures in civil engineering. International Journal of Quality & Reliability Management, 10(3), pp. 20–32.Abdul-RahmanH.1993Capturing the cost of quality failures in civil engineering103203210.1108/02656719310037956Search in Google Scholar
Abdul-Rahman, H. (1995). The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23–32.Abdul-RahmanH.1995The cost of non-conformance during a highway project: A case study131233210.1080/01446199500000004Search in Google Scholar
Abdul-Rahman, H., Thompson, P. A., & Whyte, I. L. (1996). Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix. International Journal of Quality & Reliability Management, 13(1), pp. 48–60.Abdul-RahmanH.ThompsonP. A.WhyteI. L.1996Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix131486010.1108/02656719610108314Search in Google Scholar
Ahzahar, N., Karim, N. A., Hassan, S. H., & Eman, J. (2011). A study of contribution factors to building failures and defects in construction industry. Procedia Engineering, 20, pp. 249–255.AhzaharN.KarimN. A.HassanS. H.EmanJ.2011A study of contribution factors to building failures and defects in construction industry2024925510.1016/j.proeng.2011.11.162Search in Google Scholar
Aljailawi, H. R., & Shariatmadar, H. (2017). The reasons for rework occurrence in construction projects and prioritizing them by using AHP Method. 2nd. International Conference on Civil Engineering, Architecture and Urban Design.AljailawiH. R.ShariatmadarH.20172nd. International Conference on Civil Engineering, Architecture and Urban DesignSearch in Google Scholar
Ali, A.S., & Wen, K. H. (2011). Building defects: Possible solution for poor construction workmanship. Journal of Building Performance, 2(1).AliA.S.WenK. H.2011Building defects: Possible solution for poor construction workmanship21Search in Google Scholar
Ali, M. C., Zin, R. M., Abd Hamid, Z., & Ayub, A. R. (2010). Quality cost in the construction industry–preliminary findings in Malaysia. Journal of Design and Built Environment, 6(1).AliM. C.ZinR. M.Abd HamidZ.AyubA. R.2010Quality cost in the construction industry–preliminary findings in Malaysia61Search in Google Scholar
Al-Tmeemy, S. M., Abdul-Rahman, H., & Harun, Z. (2012). Contractors’ perception of the use of costs of quality system in Malaysian building construction projects. International Journal of Project Management, 30(7), pp. 827–838.Al-TmeemyS. M.Abdul-RahmanH.HarunZ.2012Contractors’ perception of the use of costs of quality system in Malaysian building construction projects30782783810.1016/j.ijproman.2011.12.001Search in Google Scholar
Arditi, D., & Gunaydin, H. M. (1998). Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194–203.ArditiD.GunaydinH. M.1998Factors that affect process quality in the life cycle of building projects124319420310.1061/(ASCE)0733-9364(1998)124:3(194)Search in Google Scholar
Ashworth, A., & Perera, S. (2012). Contractual Procedures in the Construction Industry, sixth edition. Routledge, New York.AshworthA.PereraS.2012sixth editionRoutledgeNew YorkSearch in Google Scholar
Beswick, J., Rogers, K., Corbett, E., Binch, S., & Jackson, K. (2007). An analysis of the prevalence and distribution of stress in the construction industry. Health and Safety Executive, RR518 Research Report, Derbyshire, pp. 1–81.BeswickJ.RogersK.CorbettE.BinchS.JacksonK.2007An analysis of the prevalence and distribution of stress in the construction industryRR518 Research ReportDerbyshire181Search in Google Scholar
BSI (2015) BSI Standards Publication: BS EN ISO 9000:2015Quality management systems Fundamentals and vocabulary. ISBN 978 0 580 78878 9.BSI2015ISBN 978 0 580 78878 9.Search in Google Scholar
Building Research Establishment (BRE). (1981). “Quality control on building sites.” Current paper 7/81, HMSO, London.Building Research Establishment (BRE)1981Current paper 7/81HMSOLondonSearch in Google Scholar
Burati Jr, James L., Farrington, J. J. & Ledbetter, W. B. (1992). Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34–49.BuratiJames L.JrFarringtonJ. J.LedbetterW. B.1992Causes of quality deviations in design and construction1181344910.1061/(ASCE)0733-9364(1992)118:1(34)Search in Google Scholar
Bureau of Economic Analysis (BEA). (2006). “Gross domestic product by industry in current dollars.” Available at http://bea.gov/bea/dn2/gdpbyind_data.htm [Accessed on 2006 October 20].Bureau of Economic Analysis (BEA)2006Available at http://bea.gov/bea/dn2/gdpbyind_data.htm [Accessed on 2006 October 20].Search in Google Scholar
Chan, A. P., & Tam, C. M. (2000). Factors affecting the quality of building projects in Hong Kong. International Journal of Quality & Reliability Management, 17(4/5), pp. 423–442.ChanA. P.TamC. M.2000Factors affecting the quality of building projects in Hong Kong174/542344210.1108/02656710010298445Search in Google Scholar
Chung, H. W. (2002). Understanding quality assurance in construction: A practical guide to ISO 9000 for contractors. Routledge.ChungH. W.2002Routledge10.4324/9780203015834Search in Google Scholar
CIOB (Chartered Institute of Building, 2006) Occupational Stress in the Construction Industry Survey 2006. Carey C. 2010. Avoiding project rework: measure twice and cut once [Internet]. Blueprint Software Systems Inc. Available from http://www.blueprintsys.com/blog [Accessed on 2019 December 12].CIOB (Chartered Institute of Building)2006Carey C. 2010. Avoiding project rework: measure twice and cut once [Internet]. Blueprint Software Systems Inc. Available from http://www.blueprintsys.com/blog [Accessed on 2019 December 12].Search in Google Scholar
CIOB (Chartered Institute of Building 2019a) Code of Quality Management: Guide to Best Practice Construction Quality Management. www.ciob.org. ISBN 978-1-9162063-1-1.CIOB (Chartered Institute of Building)2019awww.ciob.org. ISBN 978-1-9162063-1-1.Search in Google Scholar
CIOB (19 July 2019b) Safety crackdown: Malaysia to hold developers and designers accountable for accidents. Available at http://www.globalconstructionreview.com/news/safety-crackdown-malaysia-hold-developers-and-desi/ [Accessed on 2019 December 13].CIOB19July2019bAvailable at http://www.globalconstructionreview.com/news/safety-crackdown-malaysia-hold-developers-and-desi/ [Accessed on 2019 December 13].Search in Google Scholar
CIDB (28 June, 2019) Media Statement: Batu Ferringhi, Wangsa Maju and Gombak Construction Site Incidents Investigated Under CIDB ACT. Available at https://www.cidb.gov.my/sites/default/files/2020-04/CONSTRUCTION-SITE-INCIDENTS-INVESTIGATED-UNDER-CIDB-ACT--.pdf.CIDB28June2019Available at https://www.cidb.gov.my/sites/default/files/2020-04/CONSTRUCTION-SITE-INCIDENTS-INVESTIGATED-UNDER-CIDB-ACT--.pdf.Search in Google Scholar
dos Reis Almeida, R. A. S. (2011). Evaluation and modelling of the costs of non-quality in the Portuguese construction industry. Available at https://fenix.tecnico.ulisboa.pt/downloadFile/395143180796/abstract.pdf [Accessed on 12 June 2020]dos Reis AlmeidaR. A. S.2011Available at https://fenix.tecnico.ulisboa.pt/downloadFile/395143180796/abstract.pdf [Accessed on 12 June 2020]Search in Google Scholar
Egan, J. (1998). Rethinking Construction, Department of the Environment Transport and Regions, HMSO, London.EganJ.1998HMSOLondonSearch in Google Scholar
Fayek, A. R., Dissanayake, M., & Campero, O. (2003). Measuring and classifying construction field rework: A pilot study. Research Rep. (May), Construction Owners Association of Alberta _COAA_, The University of Alberta, Edmonton, Al., Canada.FayekA. R.DissanayakeM.CamperoO.2003Measuring and classifying construction field rework: A pilot studyMayConstruction Owners Association of Alberta _COAA_, The University of AlbertaEdmonton, Al., CanadaSearch in Google Scholar
Fisk, E. R. (2003). Construction project management, 7th ed. Upper Saddle River, New York, Prentice-Hall.FiskE. R.20037th ed.Upper Saddle River, New YorkPrentice-HallSearch in Google Scholar
Fisk, E. R., & Rapp, R. R. (2004). Introduction to engineering construction inspection. Hoboken, New Jersey: John Wiley and Sons Inc.FiskE. R.RappR. R.2004Hoboken, New JerseyJohn Wiley and Sons Inc.Search in Google Scholar
Hall, M., & Tomkins, C. (2001). A cost of quality analysis of a building project: towards a complete methodology for design and build. Construction Management and Economics, 19(7), pp. 727–740.HallM.TomkinsC.2001A cost of quality analysis of a building project: towards a complete methodology for design and build19772774010.1080/01446190110066146Search in Google Scholar
Hammarlund, Y., Jacobsson, S., & Josephson, P. (1990a). Quality failure costs in building construction. Proc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation, Sydney, Australia, pp. 77–89.HammarlundY.JacobssonS.JosephsonP.1990aProc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and DocumentationSydney, Australia7789Search in Google Scholar
Hammarlund, Y., Jacobsson, S., & Josephson, P. (1990b). Quality observer—a new role at the construction site? Proc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation, Sydney, Australia, pp. 90–102.HammarlundY.JacobssonS.JosephsonP.1990bProc., CIB W55/W65 Joint Symposium, International Council for Building Research Studies and DocumentationSydney, Australia90102Search in Google Scholar
Hammarlund, Y., & Josephson, P. E. (1991). Sources of quality failures in building. Proc., European Symposium on Management, Quality and Economics in Housing and Other Building Sectors, 671, pp. 679.HammarlundY.JosephsonP. E.1991Sources of quality failures in building671679Search in Google Scholar
Heravi, G., & Jafari, A. (2014). Cost of quality evaluation in mass-housing projects in developing countries. Journal of Construction Engineering and Management, 140(5), pp. 04014004.HeraviG.JafariA.2014Cost of quality evaluation in mass-housing projects in developing countries14050401400410.1061/(ASCE)CO.1943-7862.0000837Search in Google Scholar
Hong, C. H. (2016). Investigation of Defects in New Buildings in Malaysia. Unpublished BSc. UTAR.HongC. H.2016Unpublished BSc.UTARSearch in Google Scholar
Hoonakker, P., Carayon, P., & Loushine, T. (2010). Barriers and benefits of quality management in the construction industry: An empirical study. Total quality management, 21(9), pp. 953–969.HoonakkerP.CarayonP.LoushineT.2010Barriers and benefits of quality management in the construction industry: An empirical study21995396910.1080/14783363.2010.487673Search in Google Scholar
Hoonakker, P. (2006). Quality management in construction industry. Proceedings: ASQ World Conference on Quality and Improvement, Milwaukee, WI, 1–3 May, pp. 1–9.HoonakkerP.2006Proceedings: ASQ World Conference on Quality and ImprovementMilwaukee, WI1–3 May19Search in Google Scholar
Husin, H. N., Adnan, H., & Jusoff, K. (2008). Management of safety for quality construction. Journal of Sustainable Development, 1(3), pp. 41–47.HusinH. N.AdnanH.JusoffK.2008Management of safety for quality construction13414710.5539/jsd.v1n3p41Search in Google Scholar
Hwang, B. G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187–198.HwangB. G.ThomasS. R.HaasC. T.CaldasC. H.2009Measuring the impact of rework on construction cost performance135318719810.1061/(ASCE)0733-9364(2009)135:3(187)Search in Google Scholar
Hwang, B. G., & Yang, S. (2014). Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190–205.HwangB. G.YangS.2014Rework and schedule performance: A profile of incidence, impact, causes and solutions21219020510.1108/ECAM-10-2012-0101Search in Google Scholar
Jaafari, A., Chan, M. A., & Cassab, R. (1994). Quality management in the Australian construction industry. In Wakefield, R. R., & Carmichael, D. G. (Eds), Construction and Management, Recent Advances, Balkema, Rotterdam, pp. 89–112.JaafariA.ChanM. A.CassabR.1994Quality management in the Australian construction industryInWakefieldR. R.CarmichaelD. G.(Eds),BalkemaRotterdam89112Search in Google Scholar
Janipha, N. A. I. & Ismail, F. (2013). Conceptualisation of quality issues in Malaysian construction environment. Procedia-Social and Behavioral Sciences, 101, pp. 53–61.JaniphaN. A. I.IsmailF.2013Conceptualisation of quality issues in Malaysian construction environment101536110.1016/j.sbspro.2013.07.178Search in Google Scholar
Jonsson, A. Z., & Gunnelin, R. H. (2019). Defects in newly constructed residential buildings: owners’ perspective. International Journal of Building Pathology and Adaptation, 37(2), pp. 163–185. https://doi.org/10.1108/IJBPA-09-2018-0077.JonssonA. Z.GunnelinR. H.2019Defects in newly constructed residential buildings: owners’ perspective372163185https://doi.org/10.1108/IJBPA-09-2018-0077.10.1108/IJBPA-09-2018-0077Search in Google Scholar
Josephson, P. E., & Hammarlund, Y. (1999). The causes and costs of defects in construction: A study of seven building projects. Automation in Construction, 8(6), pp. 681–687.JosephsonP. E.HammarlundY.1999The causes and costs of defects in construction: A study of seven building projects8668168710.1016/S0926-5805(98)00114-9Search in Google Scholar
Josephson, P. E., Larsson, B., & Li, H. (2002). Illustrative benchmarking rework and rework costs in Swedish construction industry. Journal of Management in Engineering, 18(2), pp. 76–83.JosephsonP. E.LarssonB.LiH.2002Illustrative benchmarking rework and rework costs in Swedish construction industry182768310.1061/(ASCE)0742-597X(2002)18:2(76)Search in Google Scholar
Josephson, P. E., & Hammarlund, Y. (1996). The cost of defects in construction. Proc., CIB-W65 Int. Symposium for the Organization and Management of Construction: Shaping Theory and Practice, 2, pp. 519–528.JosephsonP. E.HammarlundY.1996The cost of defects in construction2519528Search in Google Scholar
Jha, K. N., & Iyer, K. C. (2006). Critical factors affecting quality performance in construction projects. Total Quality Management and Business Excellence, 17(9), pp. 1155–1170.JhaK. N.IyerK. C.2006Critical factors affecting quality performance in construction projects1791155117010.1080/14783360600750444Search in Google Scholar
Joaquin, D. Hernandez, D. & Aspinwall, E. (2008). A framework for building quality into construction projects-Part I. Total Quality Management, 19(10), pp. 1013–1028.JoaquinD.HernandezD.AspinwallE.2008A framework for building quality into construction projects-Part I19101013102810.1080/14783360802264061Search in Google Scholar
Juran, J. M. (1999). Juran's Quality Handbook, 5, Edited by: Godfrey, A. B. New York: McGraw-Hill.JuranJ. M.19995Edited by:GodfreyA. B.New YorkMcGraw-HillSearch in Google Scholar
Kakitahi, J. M., Landin, A., & Alinaitwe, H. M. (2013). An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266–280.KakitahiJ. M.LandinA.AlinaitweH. M.2013An exploratory study of rework causality in Uganda13326628010.1108/CI-Nov-2011-0051Search in Google Scholar
Kakitahi, J. M., Alinaitwe, H. M., Landin, A., & Rodrigues, M. J. (2014). A comparison of construction related rework in Uganda and Mozambique. Journal of Construction Project Management and Innovation, 4(1), pp. 770–781.KakitahiJ. M.AlinaitweH. M.LandinA.RodriguesM. J.2014A comparison of construction related rework in Uganda and Mozambique41770781Search in Google Scholar
Kazaz, A., Birgonul, M. T., & Ulubeyli, S. (2005). Cost-based analysis of quality in developing countries: A case study of building projects. Building and Environment, 40(10), pp. 1356–1365.KazazA.BirgonulM. T.UlubeyliS.2005Cost-based analysis of quality in developing countries: A case study of building projects40101356136510.1016/j.buildenv.2004.11.010Search in Google Scholar
Kelly, J. (2007). Making client values explicit in value management workshops. Construction Management and Economics, 25(4), 435–442.KellyJ.2007Making client values explicit in value management workshops25443544210.1080/01446190601071839Search in Google Scholar
Kelly, J., Male, S., & Graham, D. (2014). Value management of construction projects. John Wiley & Sons.KellyJ.MaleS.GrahamD.2014John Wiley & Sons10.1002/9781119007258Search in Google Scholar
Latham, M. (1994). Constructing the Team, London: HMSO.LathamM.1994LondonHMSOSearch in Google Scholar
Lee, S., Lee, S., & Kim, J. (2018). Evaluating the impact of defect risks in residential buildings at the occupancy phase. Sustainability, 10(12), pp. 4466.LeeS.LeeS.KimJ.2018Evaluating the impact of defect risks in residential buildings at the occupancy phase1012446610.3390/su10124466Search in Google Scholar
Loushine, T. W., & Hoonakker, P. L. T. (2002, May). Integrated Quality and Safety Management Systems in Construction. Proceedings of the 12th Annual Construction Safety Conference, Chicago, IL, USA.LoushineT. W.HoonakkerP. L. T.2002MayProceedings of the 12th Annual Construction Safety ConferenceChicago, IL, USASearch in Google Scholar
Love, P. E., & Edwards, D. J. (2004). Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(4), pp. 259–274.LoveP. E.EdwardsD. J.2004Determinants of rework in building construction projects11425927410.1108/09699980410547612Search in Google Scholar
Love, P. E., Edwards, D. J., & Smith, J. (2005). A forensic examination of the causal mechanisms of rework in a structural steel supply chain. Managerial Auditing Journal, 20, pp. 187–197.LoveP. E.EdwardsD. J.SmithJ.2005A forensic examination of the causal mechanisms of rework in a structural steel supply chain2018719710.1108/02686900510574593Search in Google Scholar
Love, P., Irani, Z. & Edwards, D. (2004). A rework reduction model for construction projects. IEEE Transactions on Engineering Management, 51(4), pp. 426–440.LoveP.IraniZ.EdwardsD.2004A rework reduction model for construction projects51442644010.1109/TEM.2004.835092Search in Google Scholar
Love, P. E., Li, H., & Mandal, P. (1999). Rework: A symptom of a dysfunctional supply-chain. European Journal of Purchaing & Supply Management, 5(1), pp. 1–11.LoveP. E.LiH.MandalP.1999Rework: A symptom of a dysfunctional supply-chain5111110.1016/S0969-7012(98)00017-3Search in Google Scholar
Mallawaarachchi, H., & Senaratne, S. (2015). Importance of quality for construction project success. In 6th International Conference on Structural Engineering and Construction Management, pp. 18–19.MallawaarachchiH.SenaratneS.2015In6th International Conference on Structural Engineering and Construction Management1819Search in Google Scholar
Mane, P. P., & Patil, J. R. (2015). Quality management system at construction project: A questionnaire survey. Int. Journal of Engineering Research and Applications, 5(3), pp. 126–130.ManeP. P.PatilJ. R.2015Quality management system at construction project: A questionnaire survey53126130Search in Google Scholar
Mills, A., Love, P. E., & Williams, P. (2009). Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12–16.MillsA.LoveP. E.WilliamsP.2009Defect costs in residential construction1351121610.1061/(ASCE)0733-9364(2009)135:1(12)Search in Google Scholar
Montague, A. (Global Construction Review, 19 September 2018). “Defects cost more than profits”: CIOB launches urgent course on quality. Available at http://www.globalconstructionreview.com/news/defects-cost-more-profits-ciob-launches-urgent-cou [Accessed on 2020 February 17].MontagueAGlobal Construction Review,19September2018Available at http://www.globalconstructionreview.com/news/defects-cost-more-profits-ciob-launches-urgent-cou [Accessed on 2020 February 17].Search in Google Scholar
Naoum, S. G., & Mustapha, F. H. (1994). Influences of the client, designer and procurement methods on project performance. Proceedings of CIB W-92 Procurement Systems Symposium, 4–7 December, East Meets West, Department of Surveying, The University of Hong Kong, Hong Kong, pp. 221–228.NaoumS. G.MustaphaF. H.1994Proceedings of CIB W-92 Procurement Systems Symposium4–7 DecemberEast Meets West, Department of Surveying, The University of Hong Kong, Hong Kong221228Search in Google Scholar
Ogwueleka, A.C. (2013). A review of safety and quality issues in the construction industry. Journal of Construction Engineering and Project Management, 3(3), pp. 42–48.OgwuelekaA.C.2013A review of safety and quality issues in the construction industry33424810.6106/JCEPM.2013.3.3.042Search in Google Scholar
Olanrewaju, A. (2012). Quantitative analysis of defects in university buildings: user' perspective. Built Environment Project and Asset Management, 2(2), pp. 167–181.OlanrewajuA.2012Quantitative analysis of defects in university buildings: user' perspective2216718110.1108/20441241211280909Search in Google Scholar
Olanrewaju, A. A. (2011). Practice and prospects of value management in Nigeria: VM in the Nigerian construction industry. UK: VDM Verlag. pp. 2541–2542.OlanrewajuA. A.2011UKVDM Verlag25412542Search in Google Scholar
Olanrewaju, A., Idrus, A. and Khamidi, F. M. (2011). Investigating building maintenance practices in Malaysia: a case study. Int. J. Business Excellence, 4(5), pp. 573–594.OlanrewajuA.IdrusA.KhamidiF. M.2011Investigating building maintenance practices in Malaysia: a case study4557359410.1108/02630801111182420Search in Google Scholar
Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of communication on performance of the construction sector. Procedia Engineering, 196, pp. 763–770.OlanrewajuA.TanS. Y.KwanL. F.2017Roles of communication on performance of the construction sector19676377010.1016/j.proeng.2017.08.005Search in Google Scholar
Olanrewaju, A., Tan, Y. Y., & Soh, S. N. (2021). Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation. https://doi.org/10.1108/IJBPA-11-2018-0095OlanrewajuA.TanY. Y.SohS. N.2021Defect characterisations in the Malaysian affordable housinghttps://doi.org/10.1108/IJBPA-11-2018-009510.1108/IJBPA-11-2018-0095Search in Google Scholar
Olanrewaju, A. A. (2010). Quantitative Analysis of Criteria in University Building Maintenance in Malaysia. Australasian Journal of Construction Economics and Building, 10(3), pp. 51–61.OlanrewajuA. A.2010Quantitative Analysis of Criteria in University Building Maintenance in Malaysia103516110.5130/AJCEB.v10i3.1681Search in Google Scholar
Olanrewaju, A. A., Khamidi, M. F., & Idrus, A. (2011). Structures of maintenance organisations in Malaysian universities’. Int. J. Business Excellence, 4(5), pp. 573–594.OlanrewajuA. A.KhamidiM. F.IdrusA.2011Structures of maintenance organisations in Malaysian universities’4557359410.1504/IJBEX.2011.042158Search in Google Scholar
Olanrewaju, A. L., & Abdul-Aziz, A. R. (2015). Building maintenance processes and practices: The case of a fast-developing country. Singapore: Springer.OlanrewajuA. L.Abdul-AzizA. R.2015SingaporeSpringer10.1007/978-981-287-263-0Search in Google Scholar
Olanrewaju, A. L., & Idrus, A. (2020). What is determining affordable housing shortages in the Greater Kuala Lumpur, Malaysia? Property Management, 38(1), pp. 52–81.OlanrewajuA. L.IdrusA.2020What is determining affordable housing shortages in the Greater Kuala Lumpur, Malaysia?381528110.1108/PM-05-2019-0025Search in Google Scholar
Onishi, M., Omoto, T., & Kobayashi, K. (2008). Defect liability in construction contracts. In Abdul Rashid, K (2008). Research in the Malaysian Construction Industry and Built Environment: Past, present and future. Kuala Lumpur: International Islamic University Malaysia. pp. 259–274.OnishiM.OmotoT.KobayashiK.2008Defect liability in construction contractsInAbdul RashidK(2008)Kuala LumpurInternational Islamic University Malaysia25927410.2208/journalip.20.137Search in Google Scholar
Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1), pp. 1–20.OyewobiL. O.OgunsemiD. R.2010Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria11120Search in Google Scholar
Palaneeswaran, E. (2006). Reducing rework to enhance project performance levels. In Proceedings of the one-day Seminar on Recent Developments in Project Management in Hong Kong, pp. 5.1–5.10.PalaneeswaranE.2006InProceedings of the one-day Seminar on Recent Developments in Project Management in Hong Kong5.15.10Search in Google Scholar
Rahimi, Y., Tavakkoli-Moghaddam, R., Shojaie, S., & Cheraghi, I. (2017). Design of an innovative construction model for supply chain management by measuring agility and cost of quality: An empirical study. Scientia Iranica, 24(5), pp. 2515–2526.RahimiY.Tavakkoli-MoghaddamR.ShojaieS.CheraghiI.2017Design of an innovative construction model for supply chain management by measuring agility and cost of quality: An empirical study2452515252610.24200/sci.2017.4388Search in Google Scholar
Rhodes, B., & Smallwood, J. J. (2003). Defects and rework in South African construction projects. Proceedings of the First CIBD Post Graduate Conference, Port Elizabeth, South Africa, pp. 5–6.RhodesB.SmallwoodJ. J.2003Proceedings of the First CIBD Post Graduate ConferencePort Elizabeth, South Africa56Search in Google Scholar
RIBA. (2020). RIBA Plan of Work 2020. Available at www.ribaplanofwork.com.RIBA2020Search in Google Scholar
RICS (Royal Institution of Chartered Surveyors, 2018 September) Modern Methods of Construction A forward-thinking solution to the housing crisis? Available at www.rics.org. [Accessed on 2019 December 05].RICS (Royal Institution of Chartered Surveyors)2018SeptemberAvailable at www.rics.org. [Accessed on 2019 December 05].Search in Google Scholar
Rosenfeld, Y. (2009). Cost of quality versus cost of non-quality in construction: The crucial balance. Construction Management and Economics, 27(2), pp. 107–117.RosenfeldY.2009Cost of quality versus cost of non-quality in construction: The crucial balance27210711710.1080/01446190802651744Search in Google Scholar
Sekaran, U., & Bougie, R. (2019). Research Methods for Business: A Skill Building Approach. 8th edition. New York: John Wiley & Sons Inc.SekaranU.BougieR.20198th editionNew YorkJohn Wiley & Sons Inc.Search in Google Scholar
Shohet, I. M., & Ciabocco, L. (2016). On-site Mobile Application for Command, Control and Communication of Safety and Quality. Creative Construction Conference.ShohetI. M.CiaboccoL.2016Creative Construction Conference10.24928/JC3-2017/0037Search in Google Scholar
Simpeh, E. K., Ndihokubwayo, R., Love, P. E., & Thwala, W. D. (2015). A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109–116.SimpehE. K.NdihokubwayoR.LoveP. E.ThwalaW. D.2015A rework probability model: A quantitative assessment of rework occurrence in construction projects15210911610.1080/15623599.2015.1033814Search in Google Scholar
Tang, S. L., Aoieong, R. T., & Ahmed, S. M. (2004). The use of Process Cost Model (PCM) for measuring quality costs of construction projects: Model testing. Construction Management and Economics, 22(3), pp. 263–275.TangS. L.AoieongR. T.AhmedS. M.2004The use of Process Cost Model (PCM) for measuring quality costs of construction projects: Model testing22326327510.1080/0144619032000064091Search in Google Scholar
Tawfek, H. S., Mohammed, H. E., & Abdel Razek, M. E. (2012). Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model. HBRC Journal, 8(2), pp. 132–143.TawfekH. S.MohammedH. E.Abdel RazekM. E.2012Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model8213214310.1016/j.hbrcj.2012.09.009Search in Google Scholar
United Nations Economic Commission for Europe (2021). Share of construction in GDP. Available at https://w3.unece.org/PXWeb/en/CountryRanking?IndicatorCode=8 [Accessed on 2021 February 12].United Nations Economic Commission for Europe2021Available at https://w3.unece.org/PXWeb/en/CountryRanking?IndicatorCode=8 [Accessed on 2021 February 12].Search in Google Scholar
Walker, D.H.T. (1994). An investigation into the factors that determine building construction time performance, unpublished PhD thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia.WalkerD.H.T.1994unpublished PhD thesis,Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of TechnologyMelbourne, AustraliaSearch in Google Scholar
Watt, S. D. (1994). Building Pathology: Principles and practice. Osney Mead, Oxford: Blackwell Science.WattS. D.1994Osney Mead, OxfordBlackwell ScienceSearch in Google Scholar
Wolstenholme, A., Austin, S. A., Bairstow, M., Blumenthal, A., Lorimer, J., McGuckin, S., & Guthrie, W. (2009). Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our future. Constructing Excellence. Available at: www.constructingexcellence.org.uk [Accessed 11 December 2019]WolstenholmeA.AustinS. A.BairstowM.BlumenthalA.LorimerJ.McGuckinS.GuthrieW.2009Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our futureAvailable at: www.constructingexcellence.org.uk [Accessed 11 December 2019]Search in Google Scholar
Yap, J. B. H., Low, P. L., & Wang, C. (2017). Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591–618.YapJ. B. H.LowP. L.WangC.2017Rework in Malaysian building construction: Impacts, causes and potential solutions15559161810.1108/JEDT-01-2017-0002Search in Google Scholar
Yatim, M. H., & Zakaria, S. A. (2008). The application of quality control in construction industry-a case study on customer satisfaction in housing projects. In Abdul Rashid, K (2008). Research in the Malaysian Construction Industry and Built Environment: Past, present and future, Kuala Lumpur: International Islamic University Malaysia, pp. 165–179.YatimM. H.ZakariaS. A.2008The application of quality control in construction industry-a case study on customer satisfaction in housing projectsInAbdul RashidK(2008)Kuala LumpurInternational Islamic University Malaysia165179Search in Google Scholar