This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
(2008). Ordinance on health and safety on temporary and mobile construction sites. In: Republic of Croatia (ed.) NN 51/2008. Official Gazette.2008Ordinance on health and safety on temporary and mobile construction sitesIn:Republic of Croatia(ed.)Official GazetteSearch in Google Scholar
92/57/EEC (1992). Directive 92/57/EEC on the implementation of minimum safety and health requirements at temporary or mobile construction sites. In: The Council Of The European Communities (ed.). Brussels: The Council of the European Communities.92/57/EEC1992In:The Council Of The European Communities(ed.)BrusselsThe Council of the European CommunitiesSearch in Google Scholar
Azhar, S. & Behringer, A. (2013). A BIM-based approach for communicating and implementing a construction site safety plan. Proceedings of the 49th ASC Annual International Conference.AzharS.BehringerA.2013Proceedings of the 49th ASC Annual International ConferenceSearch in Google Scholar
Bansal, V. K. (2011). Application of geographic information systems in construction safety planning. International Journal of Project Management, 29, pp. 66–77.BansalV. K.2011Application of geographic information systems in construction safety planning29667710.1016/j.ijproman.2010.01.007Search in Google Scholar
Benjaoran, V., & Bhokha, S. (2010). An integrated safety management with construction management using 4D Cad model. Safety Science, 48, pp. 395–403.BenjaoranV.BhokhaS.2010An integrated safety management with construction management using 4D Cad model4839540310.1016/j.ssci.2009.09.009Search in Google Scholar
British Standards Institution. (2018a). PAS 1192-6:2018 Specification for collaborative sharing and use of structured Health and Safety information using BIM [Online]. BSI. [Accessed 14.11. 2018].British Standards Institution2018a[Online]. BSI. [Accessed 14.11. 2018].Search in Google Scholar
British Standards Institution (2018b). Specification for collaborative sharing and use of structured Health and Safety information using BIM. BSI.British Standards Institution2018bBSISearch in Google Scholar
Carter, G., & Smith, S. D. (2006). Safety Hazard Identification on Construction Projects. Journal of Construction Engineering and Management, 132, pp. 197–205.CarterG.SmithS. D.2006Safety Hazard Identification on Construction Projects13219720510.1061/(ASCE)0733-9364(2006)132:2(197)Search in Google Scholar
Chan King, C., Heng, L., & Martin, S. (2012). The use of virtual prototyping for hazard identification in the early design stage. Construction Innovation, 12, pp. 29–42.Chan KingC.HengL.MartinS.2012The use of virtual prototyping for hazard identification in the early design stage12294210.1108/14714171211197481Search in Google Scholar
Chen, A., Golparvar-Fard, M., & Kleiner, B. (2013). Design and Development of Saves: A Construction Safety Training Augmented Virtuality Environment for Hazard Recognition and Severity Identification. Computing in Civil Engineering. American Society of Civil Engineers, Reston.ChenA.Golparvar-FardM.KleinerB.2013American Society of Civil EngineersReston10.1061/9780784413029.105Search in Google Scholar
Chen, A., Golparvar-Fard, M., & Kleiner, B. (2014). Saves: An Augmented Virtuality Strategy for Training Construction Hazard Recognition. Construction Research Congress 2014. American Society of Civil Engineers, Reston.ChenA.Golparvar-FardM.KleinerB.2014American Society of Civil EngineersReston10.1061/9780784413517.238Search in Google Scholar
Cheng, M.-Y., Ko, C.-H., & Chang, C.-H. (2002). Computer-aided DSS for safety monitoring of geotechnical construction. Automation in Construction, 11, pp. 375–390.ChengM.-Y.KoC.-H.ChangC.-H.2002Computer-aided DSS for safety monitoring of geotechnical construction1137539010.1016/S0926-5805(01)00059-0Search in Google Scholar
Cheung, S. O., Cheung, K. K. W., & Suen, H. C. H. (2004). CSHM: Web-based safety and health monitoring system for construction management. Journal of Safety Research, 35, pp. 159–170.CheungS. O.CheungK. K. W.SuenH. C. H.2004CSHM: Web-based safety and health monitoring system for construction management3515917010.1016/j.jsr.2003.11.006Search in Google Scholar
Chi, S., Hampson, K., & Biggs, H. (2012). Using BIM for smarter and safer scaffolding and formwork construction: a preliminary methodology. Modelling and Building Health.ChiS.HampsonK.BiggsH.2012Using BIM for smarter and safer scaffolding and formwork construction: a preliminary methodologySearch in Google Scholar
Choi, B., Lee, H., Park, M., Cho, Y., & Kim, H. (2014). Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140, p. 04014041.ChoiB.LeeH.ParkM.ChoY.KimH.2014Framework for work-space planning using four-dimensional BIM in construction projects1400401404110.1061/(ASCE)CO.1943-7862.0000885Search in Google Scholar
Clevenger, C., Lopez Del Puerto, C. & Glick, S. (2014). Developing a BIM-enabled Bilingual Safety Training Module for the Construction Industry. Construction Research Congress 2014. American Society of Civil Engineers.ClevengerC.Lopez Del PuertoC.GlickS.2014Developing a BIM-enabled Bilingual Safety Training Module for the Construction IndustryAmerican Society of Civil Engineers10.1061/9780784413517.183Search in Google Scholar
Collins, R., Zhang, S., Kim, K. & Teizer, J. (2014). Integration of Safety Risk Factors in BIM for Scaffolding Construction. Computing in Civil and Building Engineering. American Society of Civil Engineers.CollinsR.ZhangS.KimK.TeizerJ.2014Integration of Safety Risk Factors in BIM for Scaffolding ConstructionAmerican Society of Civil Engineers10.1061/9780784413616.039Search in Google Scholar
Cooke, T., Lingard, H., Blismas, N., & Stranieri, A. (2008). ToolSHeDTM: The development and evaluation of a decision support tool for health and safety in construction design. Engineering, Construction and Architectural Management, 15, pp. 336–351.CookeT.LingardH.BlismasN.StranieriA.2008ToolSHeDTM: The development and evaluation of a decision support tool for health and safety in construction design1533635110.1108/09699980810886847Search in Google Scholar
Dharmapalan, V., Gambatese, J., Fradella, J., & Moghaddam Vahed, A. (2014). Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141, p. 04014090.DharmapalanV.GambateseJ.FradellaJ.Moghaddam VahedA.2014Quantification and assessment of safety risk in the design of multistory buildings1410401409010.1061/(ASCE)CO.1943-7862.0000952Search in Google Scholar
Eastman, C., Lee, J.-M., Jeong, Y.-S., & Lee, J.-K. (2009). Automatic rule-based checking of building designs. Automation in Construction, 18, pp. 1011–1033.EastmanC.LeeJ.-M.JeongY.-S.LeeJ.-K.2009Automatic rule-based checking of building designs181011103310.1016/j.autcon.2009.07.002Search in Google Scholar
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. Wiley Publishing, Hoboken.EastmanC.TeicholzP.SacksR.ListonK.2008Wiley PublishingHoboken10.1002/9780470261309Search in Google Scholar
Eurostat (2015). Accidents at Work Statistics. Eurostat.Eurostat2015EurostatSearch in Google Scholar
Gambatese, J., Hinze, J., & Haas, C. (1997). Tool to design for construction worker safety. Journal of Architectural Engineering, 3, pp. 32–41.GambateseJ.HinzeJ.HaasC.1997Tool to design for construction worker safety3324110.1061/(ASCE)1076-0431(1997)3:1(32)Search in Google Scholar
Gilkinson, N., Raju, P., Kiviniemi, A., & Chapman, C. (2015). Building information modelling: the tide is turning. Proceedings of the Institution of Civil Engineers - Structures and Buildings, 168, pp. 81–93.GilkinsonN.RajuP.KiviniemiA.ChapmanC.2015Building information modelling: the tide is turning168819310.1680/stbu.12.00045Search in Google Scholar
Golovina, O., Teizer, J., & Pradhananga, N. (2016). Heat map generation for predictive safety planning: Preventing struck-by and near miss interactions between workers-on-foot and construction equipment. Automation in Construction, 71, pp. 99–115.GolovinaO.TeizerJ.PradhanangaN.2016Heat map generation for predictive safety planning: Preventing struck-by and near miss interactions between workers-on-foot and construction equipment719911510.1016/j.autcon.2016.03.008Search in Google Scholar
Guo, H., Liu, W., Zhang, W. & Skitmor, M. (2014). A BIM-RFID Unsafe On-Site Behavior Warning System. Iccrem 2014@ sSmart.GuoH.LiuW.ZhangW.SkitmorM.2014A BIM-RFID Unsafe On-Site Behavior Warning System10.1061/9780784413777.040Search in Google Scholar
Guo, H. L., Li, H., & Li, V. (2013). VP-based safety management in large-scale construction projects: A conceptual framework. Automation in Construction, 34, pp. 16–24.GuoH. L.LiH.LiV.2013VP-based safety management in large-scale construction projects: A conceptual framework34162410.1016/j.autcon.2012.10.013Search in Google Scholar
Hadikusumo, B., & Rowlinson, S. (2004). Capturing safety knowledge using design-for-safety-process tool. Journal of Construction Engineering and Management, 130, pp. 281–289.HadikusumoB.RowlinsonS.2004Capturing safety knowledge using design-for-safety-process tool13028128910.1061/(ASCE)0733-9364(2004)130:2(281)Search in Google Scholar
Hadikusumo, B. H. W., & Rowlinson, S. (2002). Integration of virtually real construction model and design-for-safety-process database. Automation in Construction, 11, pp. 501–509.HadikusumoB. H. W.RowlinsonS.2002Integration of virtually real construction model and design-for-safety-process database1150150910.1016/S0926-5805(01)00061-9Search in Google Scholar
Hallowell, M., & Gambatese, J. (2009). Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135, pp. 990–998.HallowellM.GambateseJ.2009Activity-based safety risk quantification for concrete formwork construction13599099810.1061/(ASCE)CO.1943-7862.0000071Search in Google Scholar
Hasan, S., Zaman, H., Han, S., Al-Hussein, M. & Su, Y. (2012). Integrated Building Information Model to Identify Possible Crane Instability Caused by Strong Winds. Construction Research Congress 2012. American Society of Civil Engineers.HasanS.ZamanH.HanS.Al-HusseinM.SuY.2012Integrated Building Information Model to Identify Possible Crane Instability Caused by Strong WindsAmerican Society of Civil Engineers10.1061/9780784412329.129Search in Google Scholar
Hayne, G., Kumar, B. & Hare, B. (2014). The Development of a Framework for a Design for Safety BIM Tool. Computing in Civil and Building Engineering (2014). American Society of Civil Engineers.HayneG.KumarB.HareB.2014The Development of a Framework for a Design for Safety BIM ToolAmerican Society of Civil Engineers10.1061/9780784413616.007Search in Google Scholar
Jannadi, O., & Almishari, S. (2003). Risk assessment in construction. Journal of Construction Engineering and Management, 129, pp. 492–500.JannadiO.AlmishariS.2003Risk assessment in construction12949250010.1061/(ASCE)0733-9364(2003)129:5(492)Search in Google Scholar
Kamardeen, I. (2010). 8D BIM modelling tool for accident prevention through design. 26th Annual Arcom Conference, Leeds, Association of Researchers in Construction Management, 281–289.KamardeenI.201026th Annual Arcom Conference, Leeds, Association of Researchers in Construction Management281289Search in Google Scholar
Kim, H. & Ahn, H. (2011). Temporary facility planning of a construction project using BIM (Building Information Modeling). Computing in Civil Engineering (2011). American Society of Civil Engineers.KimH.AhnH.2011Temporary facility planning of a construction project using BIM (Building Information Modeling)American Society of Civil Engineers10.1061/41182(416)77Search in Google Scholar
Kim, H., Lee, H.-S., Park, M., Chung, B., & Hwang, S. (2016). Automated hazardous area identification using laborers’ actual and optimal routes. Automation in Construction, 65, pp. 21–32.KimH.LeeH.-S.ParkM.ChungB.HwangS.2016Automated hazardous area identification using laborers’ actual and optimal routes65213210.1016/j.autcon.2016.01.006Search in Google Scholar
Kim, H., Lee, H., Park, M., Chung, B., & Hwang, S. (2013). Information retrieval framework for hazard identification in construction. Journal of Computing in Civil Engineering, 29, p. 04014052.KimH.LeeH.ParkM.ChungB.HwangS.2013Information retrieval framework for hazard identification in construction290401405210.1061/(ASCE)CP.1943-5487.0000340Search in Google Scholar
Kim, K. & Cho, Y. (2015). BIM-Based Planning of Temporary Structures for Construction Safety. Computing in Civil Engineering 2015. American Society of Civil Engineers.KimK.ChoY.2015BIM-Based Planning of Temporary Structures for Construction SafetyAmerican Society of Civil Engineers10.1061/9780784479247.054Search in Google Scholar
Kim, K., & Teizer, J. (2014). Automatic design and planning of scaffolding systems using building information modeling. Advanced Engineering Informatics, 28, pp. 66–80.KimK.TeizerJ.2014Automatic design and planning of scaffolding systems using building information modeling28668010.1016/j.aei.2013.12.002Search in Google Scholar
Lin, K.-Y., Son, J. W., & Rojas, E. M. (2011). A pilot study of a 3D game environment for construction safety education. Journal of Information Technology in Construction, 16, pp. 69–83.LinK.-Y.SonJ. W.RojasE. M.2011A pilot study of a 3D game environment for construction safety education166983Search in Google Scholar
Malekitabar, H., Ardeshir, A., Sebt, M. H., & Stouffs, R. (2016). Construction safety risk drivers: A BIM approach. Safety Science, 82, pp. 445–455.MalekitabarH.ArdeshirA.SebtM. H.StouffsR.2016Construction safety risk drivers: A BIM approach8244545510.1016/j.ssci.2015.11.002Search in Google Scholar
Mallasi, Z. (2006). Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation. Automation in Construction, 15, pp. 640–655.MallasiZ.2006Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation1564065510.1016/j.autcon.2005.08.005Search in Google Scholar
Melzner, J., Zhang, S., Teizer, J., & Bargstädt, H.-J. (2013). A case study on automated safety compliance checking to assist fall protection design and planning in building information models. Construction Management and Economics, 31, pp. 661–674.MelznerJ.ZhangS.TeizerJ.BargstädtH.-J.2013A case study on automated safety compliance checking to assist fall protection design and planning in building information models3166167410.1080/01446193.2013.780662Search in Google Scholar
Mihić, M. (2018). Incorporation of Health and Safety into Building Information Modelling through Hazard Integration System. PhD thesis, University of Zagreb Faculty of Civil Engineering.MihićM.2018PhD thesisUniversity of Zagreb Faculty of Civil EngineeringSearch in Google Scholar
Mihić, M., Cerić, A., & Završki, I. (2018). Developing construction hazard database for automated hazard identification process. Technical Gazette, 25, pp. 1761–1769.MihićM.CerićA.ZavrškiI.2018Developing construction hazard database for automated hazard identification process251761176910.17559/TV-20180417105624Search in Google Scholar
NBIMS V.3 (2015). National BIM Standard - United States Version 3. National Institute of Building Sciences buildingSMART alliance.NBIMS V.32015National Institute of Building Sciences buildingSMART allianceSearch in Google Scholar
NNC Limited. (2003). The development of a knowledge based system to deliver health and safety information to designers in the construction industry. Research Report 173. Health & Safety Executive, Norwich, UK.NNC Limited2003Health & Safety ExecutiveNorwich, UKSearch in Google Scholar
Park, C.-S., & Kim, H.-J. (2013). A framework for construction safety management and visualization system. Automation in Construction, 33, pp. 95–103.ParkC.-S.KimH.-J.2013A framework for construction safety management and visualization system339510310.1016/j.autcon.2012.09.012Search in Google Scholar
Perlman, A., Sacks, R., & Barak, R. (2014). Hazard recognition and risk perception in construction. Safety Science, 64, pp. 22–31.PerlmanA.SacksR.BarakR.2014Hazard recognition and risk perception in construction64223110.1016/j.ssci.2013.11.019Search in Google Scholar
Qi, J. 2011. Integration of Construction Worker Fall Safety in Design through the Use of Building Information Modeling. PhD, University of Florida.QiJ.2011PhD, University of Florida10.1061/41182(416)86Search in Google Scholar
Qi, J., Issa, R., Hinze, J. & Olbina, S. 2011. Integration of Safety in Design through the Use of Building Information Modeling. Computing in Civil Engineering (2011). American Society of Civil Engineers.QiJ.IssaR.HinzeJ.OlbinaS.2011Integration of Safety in Design through the Use of Building Information ModelingAmerican Society of Civil Engineers10.1061/41182(416)86Search in Google Scholar
Qi, J., Issa, R., Olbina, S., & Hinze, J. (2013). Use of building information modeling in design to prevent construction worker falls. Journal of Computing in Civil Engineering, 28, p. A4014008.QiJ.IssaR.OlbinaS.HinzeJ.2013Use of building information modeling in design to prevent construction worker falls28A401400810.1061/(ASCE)CP.1943-5487.0000365Search in Google Scholar
Riaz, Z., Arslan, M., Kiani, A. K., & Azhar, S. (2014). CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces. Automation in Construction, 45, pp. 96–106.RiazZ.ArslanM.KianiA. K.AzharS.2014CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces459610610.1016/j.autcon.2014.05.010Search in Google Scholar
Riaz, Z., Arslan, M. & Peña-Mora, F. (2015). Challenges in Data Management When Monitoring Confined Spaces Using BIM and Wireless Sensor Technology. Computing in Civil Engineering 2015. American Society of Civil Engineers.RiazZ.ArslanM.Peña-MoraF.2015Challenges in Data Management When Monitoring Confined Spaces Using BIM and Wireless Sensor TechnologyAmerican Society of Civil Engineers10.1061/9780784479247.016Search in Google Scholar
Rozenfeld, O., Sacks, R., & Rosenfeld, Y. (2009). ‘CHASTE’: construction hazard assessment with spatial and temporal exposure. Construction Management and Economics, 27, pp. 625–638.RozenfeldO.SacksR.RosenfeldY.2009‘CHASTE’: construction hazard assessment with spatial and temporal exposure2762563810.1080/01446190903002771Search in Google Scholar
Rozenfeld, O., Sacks, R., Rosenfeld, Y., & Baum, H. (2010). Construction job safety analysis. Safety Science, 48, pp. 491–498.RozenfeldO.SacksR.RosenfeldY.BaumH.2010Construction job safety analysis4849149810.1016/j.ssci.2009.12.017Search in Google Scholar
Ruff, T. (2007). Recommendations for Evaluating and Implementing Proximity Warning Systems on Surface Mining Equipment. National Institute for Occupational Safety and Health, Spokane, WA.RuffT.2007National Institute for Occupational Safety and HealthSpokane, WASearch in Google Scholar
Sacks, R., Perlman, A., & Barak, R. (2013). Construction safety training using immersive virtual reality. Construction Management and Economics, 31, pp. 1005–1017.SacksR.PerlmanA.BarakR.2013Construction safety training using immersive virtual reality311005101710.1080/01446193.2013.828844Search in Google Scholar
Sacks, R., Rozenfeld, O., & Rosenfeld, Y. (2009). Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135, pp. 726–736.SacksR.RozenfeldO.RosenfeldY.2009Spatial and temporal exposure to safety hazards in construction13572673610.1061/(ASCE)0733-9364(2009)135:8(726)Search in Google Scholar
Sacks, R., Whyte, J., Swissa, D., Raviv, G., Zhou, W., & Shapira, A. (2015). Safety by design: dialogues between designers and builders using virtual reality. Construction Management and Economics, 33, pp. 55–72.SacksR.WhyteJ.SwissaD.RavivG.ZhouW.ShapiraA.2015Safety by design: dialogues between designers and builders using virtual reality33557210.1080/01446193.2015.1029504Search in Google Scholar
Saurin, T. A., Formoso, C. T., & Guimarães, L. B. M. (2004). Safety and production: an integrated planning and control model. Construction Management and Economics, 22, pp. 159–169.SaurinT. A.FormosoC. T.GuimarãesL. B. M.2004Safety and production: an integrated planning and control model2215916910.1080/0144619042000201367Search in Google Scholar
Schultz, C. S. & Jørgensen, K. 2014. Integrated safety in design. In: Aulin, R. & Ek, Å. (eds.) Proceedings of Achieving Sustainable Construction Health and Safety Conference. Lund, Sweden: International Council for Research and Innovation in Building and Construction (CIB).SchultzC. S.JørgensenK.2014Integrated safety in designIn:AulinR.EkÅ(eds.)Lund, SwedenInternational Council for Research and Innovation in Building and Construction, (CIB)Search in Google Scholar
Shapira, A., Simcha, M., & Goldenberg, M. (2012). Integrative model for quantitative evaluation of safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 138, pp. 1281–1293.ShapiraA.SimchaM.GoldenbergM.2012Integrative model for quantitative evaluation of safety on construction sites with tower cranes1381281129310.1061/(ASCE)CO.1943-7862.0000537Search in Google Scholar
Soeiro, A., Vasconcelos, B. & Barkokebas, B. 2014. Prevention guide for designers based on analysis of about 2000 accidents. CIB W99.SoeiroA.VasconcelosB.BarkokebasB.2014Prevention guide for designers based on analysis of about 2000 accidentsSearch in Google Scholar
Solihin, W., & Eastman, C. (2015). Classification of rules for automated Bim rule checking development. Automation in Construction, 53, pp. 69–82.SolihinW.EastmanC.2015Classification of rules for automated Bim rule checking development53698210.1016/j.autcon.2015.03.003Search in Google Scholar
Sulankivi, K., Zhang, S., Teizer, J., et al. Utilization of Bim-based Automated Safety Checking in Construction Planning. Proceedings of the 19th International Cib World Building Congress, Brisbane Australia, 2013. 5–9.SulankiviK.ZhangS.TeizerJ.Proceedings of the 19th International Cib World Building CongressBrisbane Australia201359Search in Google Scholar
Taiebat, M. 2011. Tuning Up Bim for Safety Analysis Proposing modeling logics for application of Bim in DfS. Virginia Polytechnic Institute and State University.TaiebatM.2011Virginia Polytechnic Institute and State UniversitySearch in Google Scholar
Teizer, J., Allread, B. S., Fullerton, C. E., & Hinze, J. (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19, pp. 630–640.TeizerJ.AllreadB. S.FullertonC. E.HinzeJ.2010Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system1963064010.1016/j.autcon.2010.02.009Search in Google Scholar
Teo, A. L. E., Ofori, G., Tjandra, I. K., & Kim, H. (2016). Design for safety: theoretical framework of the safety aspect of Bim system to determine the safety index. Construction Economics and Building, 16, p. 18.TeoA. L. E.OforiG.TjandraI. K.KimH.2016Design for safety: theoretical framework of the safety aspect of Bim system to determine the safety index161810.5130/AJCEB.v16i4.4873Search in Google Scholar
Tixier, A. J. P., Hallowell, M. R., Rajagopalan, B., & Bowman, D. (2016). Automated content analysis for construction safety: A natural language processing system to extract precursors and outcomes from unstructured injury reports. Automation in Construction, 62, pp. 45–56.TixierA. J. P.HallowellM. R.RajagopalanB.BowmanD.2016Automated content analysis for construction safety: A natural language processing system to extract precursors and outcomes from unstructured injury reports62455610.1016/j.autcon.2015.11.001Search in Google Scholar
U.S. Bureau Of Labor Statistics (2015). National Census of Fatal Occupational Injuries in 2014. Bureau of Labor Statistics.U.S. Bureau Of Labor Statistics2015Bureau of Labor StatisticsSearch in Google Scholar
Wang, H. & Boukamp, F. (2007). Leveraging Project Models for Automated Identification of Construction Safety Requirements. Computing in Civil Engineering (2007). American Society of Civil Engineers.WangH.BoukampF.2007Leveraging Project Models for Automated Identification of Construction Safety RequirementsAmerican Society of Civil Engineers10.1061/40937(261)30Search in Google Scholar
Wang, J., Zhang, S., & Teizer, J. (2015). Geotechnical and safety protective equipment planning using range point cloud data and rule checking in building information modeling. Automation in Construction, 49(Part B), pp. 250–261.WangJ.ZhangS.TeizerJ.2015Geotechnical and safety protective equipment planning using range point cloud data and rule checking in building information modeling49Part B25026110.1016/j.autcon.2014.09.002Search in Google Scholar
Weick, K. E. (1985). Cosmos vs. chaos: Sense and nonsense in electronic contexts. Organizational Dynamics, 14, pp. 51–64.WeickK. E.1985Cosmos vs. chaos: Sense and nonsense in electronic contexts14516410.1016/0090-2616(85)90036-1Search in Google Scholar
Whyte, J., Sacks, R., Zhou, W. & Haffegee, A. (2013). Building safely by design - Using digital design models to improve planning for safe construction. Institution of Occupational Safety and Health.WhyteJ.SacksR.ZhouW.HaffegeeA.2013Institution of Occupational Safety and HealthSearch in Google Scholar
Workcover. (2011). Chair Safety in Design Tool. Workcover, New South Wales.Workcover2011WorkcoverNew South WalesSearch in Google Scholar
Zhang, J. & Issa, R. (2015). Collecting Fire Evacuation Performance Data Using Bim-Based Immersive Serious Games for Performance-Based Fire Safety Design. Computing in Civil Engineering 2015. American Society of Civil Engineers.ZhangJ.IssaR.2015Collecting Fire Evacuation Performance Data Using Bim-Based Immersive Serious Games for Performance-Based Fire Safety DesignAmerican Society of Civil Engineers10.1061/9780784479247.076Search in Google Scholar
Zhang, S. (2014). Integrating safety and Bim: automated construction hazard identification and prevention. Doctor of Philosophy, Georgia Institute of Technology.ZhangS.2014Doctor of Philosophy, Georgia Institute of TechnologySearch in Google Scholar
Zhang, S., Boukamp, F. & Teizer, J. (2014). Ontology-Based Semantic Modeling of Safety Management Knowledge. In: Issa, R. & Flood, I. (eds.) 2014 International Conference on Computing in Civil and Building Engineering. Orlando, Florida, United States: American Society of Civil Engineers.ZhangS.BoukampF.TeizerJ.2014Ontology-Based Semantic Modeling of Safety Management KnowledgeIn:IssaRFloodI.(eds.)Orlando, Florida, United StatesAmerican Society of Civil Engineers10.1061/9780784413616.280Search in Google Scholar
Zhang, S., Boukamp, F., & Teizer, J. (2015a). Ontology-based semantic modeling of construction safety knowledge: towards automated safety planning for job hazard analysis (JHA). Automation in Construction, 52, pp. 29–41.ZhangS.BoukampF.TeizerJ.2015aOntology-based semantic modeling of construction safety knowledge: towards automated safety planning for job hazard analysis (JHA)52294110.1016/j.autcon.2015.02.005Search in Google Scholar
Zhang, S., Sulankivi, K., Kiviniemi, M., Romo, I., Eastman, C. M., & Teizer, J. (2015b). Bim-based fall hazard identification and prevention in construction safety planning. Safety Science, 72, pp. 31–45.ZhangS.SulankiviK.KiviniemiM.RomoI.EastmanC. M.TeizerJ.2015bBim-based fall hazard identification and prevention in construction safety planning72314510.1016/j.ssci.2014.08.001Search in Google Scholar
Zhang, S., Teizer, J., Lee, J.-K., Eastman, C. M., & Venugopal, M. (2013). Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules. Automation in Construction, 29, pp. 183–195.ZhangS.TeizerJ.LeeJ.-K.EastmanC. M.VenugopalM.2013Building information modeling (BIM) and safety: automatic safety checking of construction models and schedules2918319510.1016/j.autcon.2012.05.006Search in Google Scholar
Zhou, W., Whyte, J., & Sacks, R. (2012). Construction safety and digital design: a review. Automation in Construction, 22, pp. 102–111.ZhouW.WhyteJ.SacksR.2012Construction safety and digital design: a review2210211110.1016/j.autcon.2011.07.005Search in Google Scholar
Zhou, Y., Ding, L. Y., & Chen, L. J. (2013). Application of 4D visualization technology for safety management in metro construction. Automation in Construction, 34, pp. 25–36.ZhouY.DingL. Y.ChenL. J.2013Application of 4D visualization technology for safety management in metro construction34253610.1016/j.autcon.2012.10.011Search in Google Scholar
Zhou, Z., Goh, Y. M., & Li, Q. (2015). Overview and analysis of safety management studies in the construction industry. Safety Science, 72, pp. 337–350.ZhouZ.GohY. M.LiQ.2015Overview and analysis of safety management studies in the construction industry7233735010.1016/j.ssci.2014.10.006Search in Google Scholar
Zhu, Z., Park, M.-W., Koch, C., Soltani, M., Hammad, A., & Davari, K. (2016). Predicting movements of onsite workers and mobile equipment for enhancing construction site safety. Automation in Construction, 68, pp. 95–101.ZhuZ.ParkM.-W.KochC.SoltaniM.HammadA.DavariK.2016Predicting movements of onsite workers and mobile equipment for enhancing construction site safety689510110.1016/j.autcon.2016.04.009Search in Google Scholar
Zolfagharian, S., Irizarry, J., Ressang, A., Nourbakhsh, M., & Gheisari, M. (2014). Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14, pp. 134–147.ZolfagharianS.IrizarryJ.RessangA.NourbakhshM.GheisariM.2014Automated safety planning approach for residential construction sites in Malaysia1413414710.1080/15623599.2014.926190Search in Google Scholar