Login
Register
Reset Password
Publish & Distribute
Publishing Solutions
Distribution Solutions
Subjects
Architecture and Design
Arts
Business and Economics
Chemistry
Classical and Ancient Near Eastern Studies
Computer Sciences
Cultural Studies
Engineering
General Interest
Geosciences
History
Industrial Chemistry
Jewish Studies
Law
Library and Information Science, Book Studies
Life Sciences
Linguistics and Semiotics
Literary Studies
Materials Sciences
Mathematics
Medicine
Music
Pharmacy
Philosophy
Physics
Social Sciences
Sports and Recreation
Theology and Religion
Publications
Journals
Books
Proceedings
Publishers
Blog
Contact
Search
EUR
USD
GBP
English
English
Deutsch
Polski
Español
Français
Italiano
Cart
Home
Journals
Management Systems in Production Engineering
Volume 28 (2020): Issue 1 (March 2020)
Open Access
Materials Requirement Planning with the Use of Activity Based Costing
Dorota Więcek
Dorota Więcek
,
Dariusz Więcek
Dariusz Więcek
and
Luboslav Dulina
Luboslav Dulina
| Mar 17, 2020
Management Systems in Production Engineering
Volume 28 (2020): Issue 1 (March 2020)
About this article
Previous Article
Next Article
Abstract
References
Authors
Articles in this Issue
Preview
PDF
Cite
Share
Published Online:
Mar 17, 2020
Page range:
3 - 8
Received:
Jul 01, 2018
Accepted:
Mar 01, 2019
DOI:
https://doi.org/10.2478/mspe-2020-0001
Keywords
activity based costing
,
planning of material requirements
© 2020 Dorota Więcek et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Dorota Więcek
University of Bielsko-Biala,
Dariusz Więcek
University of Bielsko-Biala,
Luboslav Dulina
University of Zilina,