Login
Register
Reset Password
Publish & Distribute
Publishing Solutions
Distribution Solutions
Subjects
Architecture and Design
Arts
Business and Economics
Chemistry
Classical and Ancient Near Eastern Studies
Computer Sciences
Cultural Studies
Engineering
General Interest
Geosciences
History
Industrial Chemistry
Jewish Studies
Law
Library and Information Science, Book Studies
Life Sciences
Linguistics and Semiotics
Literary Studies
Materials Sciences
Mathematics
Medicine
Music
Pharmacy
Philosophy
Physics
Social Sciences
Sports and Recreation
Theology and Religion
Publications
Journals
Books
Proceedings
Publishers
Blog
Contact
Search
EUR
USD
GBP
English
English
Deutsch
Polski
Español
Français
Italiano
Cart
Home
Journals
Foundations of Management
Volume 13 (2021): Issue 1 (January 2021)
Open Access
Research Method for Management of Thermoplastics Production Improvement in Rubber Industry with the Use of 3D Simulation Modeling
Sándor Forrai
Sándor Forrai
,
Balázs Ludanyi
Balázs Ludanyi
,
István Péter Szabó
István Péter Szabó
,
Justyna Smagowicz
Justyna Smagowicz
and
Cezary Szwed
Cezary Szwed
| Apr 29, 2021
Foundations of Management
Volume 13 (2021): Issue 1 (January 2021)
About this article
Previous Article
Next Article
Abstract
Article
Figures & Tables
References
Authors
Articles in this Issue
Preview
PDF
Cite
Share
Published Online:
Apr 29, 2021
Page range:
21 - 34
DOI:
https://doi.org/10.2478/fman-2021-0002
Keywords
production management
,
simulation modeling
,
improvement of production processes
,
SMED
,
rubber industry
,
calender
© 2021 Sándor Forrai et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 1
Part of the placed machine units in FlexSim (Source: Own study)
Figure 2
Part of Process Flow of the material flow (Source: Own study)
Figure 3
Continuous material flow (Source: Own study)
Figure 4
Example of path drawing (Source: Own study)
Figure 5
The two letoffs next to each other (Source: Own study)
Figure 6
Results of the experiments (Source: Own study)
Figure 7
Electricity and steam savings (Source: Own study)
Figure 8
Gant diagram of setup times – one and two letoff units used (Source: Own study)
Figure 9
Gant diagram of machine downtime and process time with one and two letoff units used (Source: Own study)