Dynamics of Pertinent Project Delay Variables in the Thai Construction Sector: Mathematical Analysis


Cite

Abbasi, O., Noorzai, E., Jafari, K. G., & Golabchi, M. (2020). Exploring the causes of delays in construction industry using a cause-and-effect diagram: Case study for Iran. Journal of Architectural Engineering, 26(3), 1-16. Search in Google Scholar

Abeku, D. M., Ogunbode, E. B., Salihu, C., Maxwell, S. S., & Kure, M. A. (2016). Project management and the effect of rework on construction works: A case of selected projects in Abuja metropolis, Nigeria. International Journal of Finance and Management in Practice, 4(1), 2360-77459. Search in Google Scholar

Ahmed, S. M., Azhar, S. Kappagantula, P., & Gollapudi, D. (2003). Delay in construction: A brief study of the Florida construction industry. ASC Proceedings of the 39th Conference,257-266. Search in Google Scholar

Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of construction Engineering and Management, 132(7), 667-677. Search in Google Scholar

Al Amri, T., & Perez, M. M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, 5(2020), 87-102. Search in Google Scholar

Alaryan, A., Emadelbeltagi, Elshahat, A., & Dawood, M. (2014). Causes and effects of change orders on construction projects in Kuwait. International Journal of Engineering Research and Application, 4(7), 01-08. Search in Google Scholar

Alavifar, A. H., & Motamedi, S. (2014). Identification, evaluation, and classification of time delay risks of construction project in Iran. Proceedings of International Conference on Industrial Engineering and Operations Management, 919-929. Search in Google Scholar

Al-Hams, M. F. (2010). Simulation model of change orders and their impact on building projects performance in Gaza strip. Thesis of Islamic University, Gaza-Palestine, 1-194. Search in Google Scholar

Alsulaiti A. A., & Kerbache, L. (2020). Analysis of critical delay factors in construction projects with a focus on Qatar. International Journal of Business and Economics Research, 9(3), 130-139. Search in Google Scholar

Ameh, O. J., & Osegbo, E. E. (2011). Study of relationship between time overrun and pProductivity on construction sites. International Journal of Construction and Supply Chain Management, 1(1), 56-67. Search in Google Scholar

Ametepey, S. O., Asiedu, G. W. & Kissiedu, M. A. (2017). Causes-effects relationship of construction project delays in Ghana: Focusing on local government projects. Advances in Human Factors, Sustainable Urban Planning and Infrastructure, Advances in Intelligent systems and Computing, 600, 84-95. Search in Google Scholar

Anastasiu, L. (2018). The decision-making process in construction project management byusing the ELECTRE I method. International Journal of Research. Science & Management, 5(2), 1-14. Search in Google Scholar

Anysz, H. (2019). Managing delays in construction projects aiming at cost minimization. Material Science and Engineering, 603(2019),1-10. Search in Google Scholar

Arantes, A., & Ferreira L. M. D. F. (2020). A method for development of delay mitigation measures in construction projects. Production Planning and Control, 1-14. Search in Google Scholar

Archistar Academy (2020). Top ten design software for architects. Australia. Search in Google Scholar

Asegie, Y. G. (2019). Causes of construction delay by the perception of professionals and minimizing its effect: the case of North Shoa Zone, Ethiopia. Civil Engineering and Construction Technology (in press). Search in Google Scholar

Asmitha, P. (2019). Time delay and cost overrun in construction projects. IRE Journal, 3(5), 44-51. Search in Google Scholar

Aziz, R. F. (2013). Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52, 387-406. Search in Google Scholar

Bahra, A. (2019). What causes delays and cost overruns on major infrastructure projects. London: Construction Products Association. Search in Google Scholar

Bassa, M., Reta, A., Alyew, A., & Tora, M. (2019). Causes and effects of design change in building construction projects in three selected southern Ethiopia zone. International Journal of Engineering Research and Technology, 8(12), 757-761. Search in Google Scholar

Boateng, P., Chen, Z., & Ogunlana, S. (2012). A conceptual system dynamic model to describe the impacts of critical weather conditions in megaproject of construction. Journal of Construction Project Management and Innovation, 2(1), 208-224. Search in Google Scholar

Bounthipphasert, S., Shozo, N., Toshihiro, O., & Takafunmi, N. (2020). Causes of delays in road construction projects in Laos. The Global Journal of Research in Engineering, 20(3), 1-15. Search in Google Scholar

Busby, J. S. (2001). Error and distributed cognition in design. Design Studies, 22(3), 233-254. Search in Google Scholar

Carvalho, A. B., Maues, L. M. F., Moreira, F., & Reis, C. J. L. (2021). Study on the factors of delay in construction works. Amnient Construido, 21(3), 27-46. Search in Google Scholar

Chaker, F., El Manouar, A., & Idrissi. M. A. J. (2015). Towards a system dynamic modelling method based on DEMATEL. International Journal of Computer Science & Information Technology, 7(2), 28-40. Search in Google Scholar

Chandrusa, S., & Basha, M. (2017). Rework management in construction projects and comparison with time and cost. International Journal of Engineering Science and Computing, 7(6), 13020-13025. Search in Google Scholar

Chijindu, A. H. (2018). Delay management in project construction industry in EBONYI State, Nigeria. International Journal of Advance Research in Science, Engineering and Technology, 5(10), 7196-7202. Search in Google Scholar

Choopojcharoen, T., & Magzari, A. (2012). Mathematics behind system dynamics. United States: Worcester Polytechnic Institute. Search in Google Scholar

Couto, J. P. (2012). Identifying of the reasons for the project design errors in the Portuguese construction industry. Natural & Applied Sciences, 3(2), 164-170. Search in Google Scholar

Desai, M., & Bhatt, R. (2013). Critical causes of delay in residential construction project: Case study of central Gujarat region of India. International Journal of Engineering Trends and Technology, 4(4), 762-768. Search in Google Scholar

Eksander, A. F. Z. (2018). Risk assessment influencing factors for Arabian construction projects using analytic hierarchy. Alexandria Engineering Journal, 57, 4207-4218. Search in Google Scholar

Emuze, D. D. F. (2018). Resolving client-linked delays in construction projects in India. Journal of Construction Project Management and Innovation, 8(1), 2164-2179. Search in Google Scholar

Enshassi, A., Sundermeier, M., & Zeiter, M. A. (2017). Factors contributing to rework and their impact on construction projects performance. International Journal of Sustainable Construction Engineering & Technol-ogy, 8(1), 12-33. Search in Google Scholar

Erdogan, S. A., Saparauskas, J., & Turskis, Z. (2016). Decision making in construction management: AHP and expert choice approach. Procedia Engineering, 172, 270-276. Search in Google Scholar

European Commission. (2018). European construction sector observatory. Search in Google Scholar

Foord, A. G., & Gulland, W. G. (2006). Can technology eliminate human error. Process Safety and Environmental Protection, 84, 171-173. Search in Google Scholar

Fuade, D. F., Rahmawati, Y., & Utomo, C. (2017). Factor of design errors in construction project. Regional Conference in Civil Engineering, 284-288. Search in Google Scholar

Fugar, F. D. K., & Baah, A. A. B. (2010). Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Build, 10(1/2), 103-116. Search in Google Scholar

Gascuene, N. V., Astor, E. N., Del-Burgo, J. F., & Fernandez, J. P. R. (2014). Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. Proceedings of 27th Annual ARCOM Conference of Association of Research in Construction and Management, 879-888. Search in Google Scholar

Gebrehiwet, T., & Luo, H. (2017). Analysis of delay impact on construction project based on RII and correlation coefficient: Empirical study. Proceedia Engineering, 196(2017), 366-374. Search in Google Scholar

Gonzalez, P., Gonzalez, V., Molenaar, K., & Orozco, F. (2014). Analysis of causes of delay and time performance in construction projects. Journal of construction Engineering and Manage, 140(1), 1-9. Search in Google Scholar

Halwatura, R. U., & Ranasinghe, N. P. N. P. (2013). Causes of variation orders in road construction projects in Sri Lanka. ISRN Construction Engineering, 1-7. Search in Google Scholar

Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., & Ani, A. I. C. (2011). Cause of construction delay-theoretical framework. Procedia Engineering, 20(11), 490-495. Search in Google Scholar

Hassan, A., Hamza, F., Nikhil, M., & Sufyan, S. (2017). A study in construction delays of residential structures. International Refereed Journal of Engineering Science, 6(6), 42-47. Search in Google Scholar

Hickson, B. G., & Ellis, L. A. (2014). Factors affecting construction labor productivity in Trinidad and Tobago. The Journal of Association of Professional Engineers of Trinidad and Tobago, 42(1), 4-11. Search in Google Scholar

Hossain, G. M. S., Huang, W., & Kaium, M. A. (2020). Evaluating critical success factors for adoption decision of e-learning facilities in Bangladesh by using DEMATEL approach. International Journal of e-Education, e-Business, e-Management, and e-Learning, 10(2), 182-204. Search in Google Scholar

Jajac, N., Marovi, L., & Hanak, T. (2015). Decision support for management of urban transport projects. Grad-jevinar, 6(2), 131-141. Search in Google Scholar

Jayaraman, R. (2021). An empirical study of delays in large engineering projects: An Indian experience. Jindal Journal of Business Research. doi: 10.1177/22786821211000222 Open DOISearch in Google Scholar

Jordão, A. R., Costa, R., Dias, Álvaro L., Pereira, L., & Santos, J. P. (2020). Bounded rationality in decision making: an analysis of the decision-making biases. Business: Theory and Practice, 21(2), 654-665. doi: 10.3846/btp.2020.11154 Open DOISearch in Google Scholar

Jussila, J., & Lahtinen, K. (2019). Effects of institutional practices on delays in construction-views of Finnish homebuilder families. Housing Studies, 35(7), 1167-1193. Search in Google Scholar

Kakha, G., Tabasi, S., Jami, M., & Narooei, K. D. (2019). Evaluation of the impacting factors on sustainable mining development, using the grey decision-making trial and evaluation laboratory approach. International Journal of Engineering, 32(10), 1497-1505. Search in Google Scholar

Kamandang, Z. R., & Casita, C. B. (2018). Delay in construction project: A review. Journal of Proceedings Series, 6(2018), 135-140. Search in Google Scholar

Karthik, D., & Rao, C. B. K. (2018). The analysis of essential factors responsible for loss of labor productivity in building construction projects in India. Engineering Journal, 23(2), 56-70. Search in Google Scholar

Kaushik, S., & Somvir. (2015). A method for research in library and information science. International Journal of Librarianship and Administration, 2, 179-185. Search in Google Scholar

Kazaz, A., Ulubeyli, S., & Tuncbilekli, N. A. (2012). Causes of delays in construction projects in Turkey. Journal of civil Engineering and Management, 18(3), 426-435. Search in Google Scholar

Keane, P., Sertyesilisik, B., & Ross, A. D. (2010). Variations and change orders on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering Construction, 2(2), 89-96. Search in Google Scholar

Kesavan, M., Gobidan, N., & Dissanayake, P. (2017). Analysis of factors contributing civil engineering construction project delays in Sri Lankan building construction industries. Journal of Industrial Engineering Research, 1(7), 5-11. Search in Google Scholar

Khahro, S. H., & Memon, Z. A. (2018). Non excusable delays in construction industry: A causal study. Engineering Technology Applied Science Research, 8(6), 3561-3564. Search in Google Scholar

Khaled, A. J., Panlo, F. G., & Luis, F. G. B. (2020). Factors influencing construction projects delay: An exploratory study at a Jordanian public university. International Congress of Project Management and Engineering, 24, 1-14. Search in Google Scholar

Khattri, T., Agarwal, S., Gupta, V., & Pandey, M. (2016). Causes and effects of delay in construction project. International Research Journal of Engineering and Technology (IRJET), 3, 564-566. Search in Google Scholar

Khoso, A. R., Khan, J. S., Faiz, R. U., & Akhund. M. A. (2019). Assessment of change order attributes in pre-construction and construction phase. Civil Engineering Journal, 5(3), 616-623. Search in Google Scholar

Kim, D. H. (1999). Introduction to systems thinking. Pengasus Communication, Inc. Search in Google Scholar

Kolbel, S., Ossadnik, W., & Gergeleit, S. (2017). Performance management by causal mapping: An application field of knowledge management. Knowledge Management Strategies and Applications. doi: 10.5772/intechopen.70297 Open DOISearch in Google Scholar

Kusakci, A. O., Ayvaz, B., & Bejtagic, E. (2017). An analysis of causes and effects of delays in construction projects in Libyan oil industry. Karaelmas Fen ve Mühendislik Dergisi, 7(1), 274-282. Search in Google Scholar

Larsen, J. K., Shen, G. Q, Lindhard, S. M., & Bruno, T. D. (2016). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of Management in Engineering, 32(1), 1-28. Search in Google Scholar

Lessing, B., Thurnell, D., & Durdyev, S. (2017). Main factors causing delays in large construction projects: Evidence from New Zealand. Journal of Management, Economics, and Industrial Organization, 1(2), 63-82. Search in Google Scholar

Liu, M., Le, Y., Hu, Y., Skitmore, M., & Gao, X. (2019). System dynamics modelling for construction management research: Critical review and future trends. Journal of Civil Engineering and Management, 25(8), 730-741. Search in Google Scholar

Lonergan, A. J. (2018). Fundamentals of construction contracts: Scheduling and delay issues. Demand Construction Services, Inc. Search in Google Scholar

Love, P. E. D., & Smith, J. (2003). Benchmarking, benchaction, and benchlearning: Rework mitigation in projects. Journal of Management in Engineering, 19(4), 147-159. Search in Google Scholar

Love, P. E. D., Edwards, D. J., & Irani, I. (2008). Forensic Project Management: An exploratory examination of the causal behavior of design-induced rework. IEEE Transactions on Engineering Management, 55(2), 234-247. Search in Google Scholar

Mahamid, I. (2016). Analysis of rework in Residential building projects in Palestine. Jordan Journal of Civil Engineering, 10(2), 197-208. Search in Google Scholar

Maryani, A., Wignjosoebroto, S., & Partiwi, S. G. (2015). A system dynamics approach for modelling construction accidents. Industrial Engineering and Service Science, 392-401. Search in Google Scholar

Masood, R., Ali, M., Shafique, F., Shafique, M. A., Zafar, B., Maqsoom, & Ullah, Z. (2015). Investigating the delay factors of construction projects in metropolitan city of a developing country. Journal of Civil Engineering and Architectural Research 2(9), 947-955. Search in Google Scholar

Matheu, N. F. (2005). Life cycle document management system for construction. Doctoral Thesis submitted to Escola Technica Superior d’Enginyeria Industrial de Terrasa, Department d’Enginyeria de la Construccio. Search in Google Scholar

Memon, A. H. (2014). Contractor perspective on time overrun factors in Malaysian construction projects. International Journal of Science and Environmental Technology, 3(3), 1184-1192. Search in Google Scholar

Mirshekarlou, B. R. (2012). A taxonomy for causes of changes in construction. A Thesis to Graduate School of Natural and Applied Sciences of the Middle East Technical University, Turkey. Search in Google Scholar

Mittal, Y. K., & Paul, V. K. (2018). Identification of critical factors for delay in metro rail project in India. International Journal of Students’ Research in Technology Management, 6(1), 30-39. Search in Google Scholar

Mizanur, R. M. D., Dai, L. Y., & Khanh, H. D. (2014). Investigating main causes for scheduledelay in construction projects in Bangladesh. KICEM Journal of Construction Engineering and Project Management, 4(3), 33-46. Search in Google Scholar

Mohiuddin, M., Halilem, N., Kobir, S. M. A., & Yuliang. C. (2017). Performance management by causal mapping: An application field of knowledge management. Knowledge Management Strategies and Applications. doi: 10.5772/intechopen.70297 Open DOISearch in Google Scholar

Moradi, S., Nasirzadeh, F., & Golkhoo, F. (2017). Modelling labor productivity in construction projects using hybrid SD-DES approach. Scientia Iranica, 24(6), 2752-2761. Search in Google Scholar

Motaleb, O., & Kishk, M. (2011). An investigation into causes and effects of construction delays in UAE. ARCOM Conference, 1149-1157. Search in Google Scholar

Mydin, M. A. O., Sani, N. M., Taib, M., & Alias, N. M. (2014). Imperative causes of delays in construction projects from developers’ outlook. MATEC Web of Conferences, 06005, 1-26. Search in Google Scholar

Najafabadi, E. A., & Pimplikar, S. S. (2013). The significant causes and effects of delays in Ghadir 2206 residential project. IOSR Journal of Mechanical and Civil Engineering (IOSR_JMCE), 7(4), 75-81. Search in Google Scholar

Nundwe, M., & Mulenga, M. (2017). Delays in construction of electrical power transmission lines in Zambia. American Academic Scientific Research Journal for Engineering, Technology, and Sciences, 30(1), 82-96. Search in Google Scholar

Ogano, N. O. (2016). A system dynamics approach to managing project risks in the electricity industry in sub–Saharan Africa. Doctoral Thesis submitted to Graduate School of Technology Management, Faculty of Engineering, Built Environment and Information Technology, University of Pretoria. Search in Google Scholar

Ogunlana, O., Li, H., & Sukhera, F. A. (2003). System dynamics approach to exploring performance enhancement in a construction organization. Journal of construction Engineering and Management, 129(5), 528-536. Search in Google Scholar

Owolabi, J. D., Amusan, L. M., Oloke, C. O., Olusanya, O., Olayeni, T.P., Owolabi, D., Peter, J., & Omuh, I. (2014). Causes and effect of delay on project construction delivery time. International Journal of Education and Research, 2(4), 197-208. Search in Google Scholar

Paray, W. A., & Kumar, C. (2020). Delay analysis in construction projects. International Research Journal of Engineering and Technology (IRJET), 7(10), 477-479. Search in Google Scholar

Pourrostam T., & Ismail, A. (2011). Study of methods for minimizing construction delays: Evidence from a developing country. Advances in Mathematical Research, 201-203, 2939-2942. Search in Google Scholar

Purdue University. (2021). Project management job description. Search in Google Scholar

Qaytmas, N. (2020). Causes of delays in construction projects in Fayab/Afghanistan. International Journal for Research in Applied Sciences and Biotechnology, 7(6), 72-77. Search in Google Scholar

Rahman, I. H. R. (2018). Effects of construction delays on project time overrun. IPM Professional Services, 1-2. Search in Google Scholar

Rahmandad, H., & Hu, K. (2010). Modelling the rework cycle: capturing multiple defects per task. System Dynamics Review, 26(4), 291-315. Search in Google Scholar

Ramli M. Z., Abidin, M. Z. Z., Hamid, N. B., Razman, R., & Nam, N. O. (2021). Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII). AIP Conference Proceedings, 020114. Search in Google Scholar

Rezahoseini, A., Noori, S., Ghannadpour, S. F., & Bodaghi, M. (2019). Reducing rework and increasing the civil projects quality, through total quality management (TQM), by using the concept of building information modelling (BIM). Journal of Industrial Systems Engineering, 12, 1-27. Search in Google Scholar

Rojas, E. M., & Aramvareekul, P. (2003). Labor productivity drivers and opportunities in the construction industry. Journal of Management in Engineering, 19(2), 78-82. Search in Google Scholar

Salhi, R., & Messaoudi, K. (2021). The effect of delays in Algerian construction projects: An empirical study. Civil and Environmental Engineering Report, 31(2), 218-254. Search in Google Scholar

Samani, B. A. (2012). A fuzzy systematic approach to construction risk analysis. Journal of Risk Analysis and Crisis Response, 2(4), 275-284. Search in Google Scholar

Samarah, A., & Bekr, G. A. (2016). Causes of delay in public construction projects in Jordan. American Journal of Engineering Research, 5(5), 87-94. Search in Google Scholar

Saxena, H., & Tomar, P. S. (2018). Causes and Effects of delays in Indian construction projects. Journal of Advances in Scholarly Research and Allied Education, 15(9), 231-242. Search in Google Scholar

Seboru, M. A. (2015). An investigation into factors causing delays in road construction projects in Kenya. American Journal of Civil Engineering, 3(3), 51-63. Search in Google Scholar

Seker, S., & Zavadskas, E. K. (2017). Application of fuzzy DEMATEL method for analyzing occupational risks on construction sites. Sustainability, 9, 1-19. Search in Google Scholar

Seran, S. L., Galindo, I. P., Cabrera, A. G., & Torres, A. (2017). Identifying factors causing delays and cost overruns in construction projects in Colombia. Ingenieria y Ciencia, 14(27), 117-151. Search in Google Scholar

Sha, M. K., Shahi, P. B., Pandit, R., & Pandey, A. (2017). Causes and effects of delays in construction projects. IOSR Journal of Mechanical and. Civil Engineering, 14(2), 52-58. Search in Google Scholar

Shahsavand, P., Marefat, A., & Parchamijalal, M. (2018). Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering Construction and Architectural Management, 1-39. Search in Google Scholar

Shamsudeen, M., & Obaju, N. B. (2016). Effects of design errors on construction projects. International Journal of Science and Engineering Research, 7(2), 1099-1114. Search in Google Scholar

Shieh, J. I., Wu, H. H., & Huang, K. K. (2010). A DEMATEL method in identifying key success factors of hospital service quality. Knowledge-based System, 23, 277-282. Search in Google Scholar

Si, S. L., You, X. Y., Liu, H. C., & Zhang, P. (2018). DEMATEL technique: A systematic review of the state-of-the-art literature on methodologies and applications. Mathematical Problems in Engineering, 1-33. Search in Google Scholar

Sohu, S., Chandio, A. F., & Kaleemullah. (2019). Identification of causes and minimization of delays in highway projects of Pakistan. Mehran University Research Journal in Engineering and Technology, 38(1), 103-112. Search in Google Scholar

Soliman, E. (2017). Construction projects delay causes- economical and industrial effect. International Journal of Engineering Research and Technology, 6(3), 95-103. Search in Google Scholar

Sounmphonphakdy, B., Nakamura, S., Okumatsu, T., & Nishikawa, T. (2020). Causes ofdelays in road construction projects in Laos.” Global Journal of Research in Civil, and Structural Engineering, 20(3), 1-15. Search in Google Scholar

Sterman, J. (2000). Business dynamics: Systems thinking and modelling for the complex world. Boston: McGrawhill. Search in Google Scholar

Suleiman, I. J., & Luvara, V. G. M. (2016). Factors influencing change of design of building Projects during construction stage in Dar-es-salaam Tanzania. International Journal of Construction Engineering and Management, 5(4), 93-101. Search in Google Scholar

Sullivan, A., & Harris, F. C. (1986). Delays on large construction projects. International Journal of Operation & Production Management, 6(1), 25-33. Search in Google Scholar

Sun, M., & Meng, X. (2009). Taxonomy for change causes and effects in construction projects. International Journal of Project Management, 27, 560-572. Search in Google Scholar

Susanty, A., Sari, D. P., Rinawati, I. I., Purwaningsih, R., & Sjawie, F. H. (2019). Policy making for GSCM implementation in the wooden furniture industry. Management of Environmental Quality: An International Journal, 30(5), 925-944. Search in Google Scholar

Suslov, S., & Katalevsky, D. (2019). Modelling and simulation toolset. Evolving Toolbox for Complex Project Management, 417-448. Search in Google Scholar

Suther, G. N. R. A. (1998). Evaluating the perception of design errors in the construction industry. A Report Presented to the Graduate Committee of the Department of Civil Engineering, University of Florida, 1-57. Search in Google Scholar

Szafranko, E. (2015). Evaluation of variant construction projects supported by expert opinion system based on multi-criteria methods. International Journal of New Technologies in Science and Engineering, 2(5), 39-46 Search in Google Scholar

Szafranko, E. (2017). Decision problems in management of construction projects. IOP Conference Series: Materials Science and Management, 251, 1-8. Search in Google Scholar

Tafazzoli, M. P. P., & Shrestha. (2017). Investigating causes of delay in U.S. construction projects. ASC Annual International Conference Proceedings, 53, 611-621. Search in Google Scholar

Tahir, M. M., Haron, N. A., Alias, A. H., & Diugwu, I. A. (2019). Causes of delay and cost overrun in Malaysian construction industry. Lecture Notes in Civil Engineering, 9, 47-57. Search in Google Scholar

Teplická, K., Hrehová, D., & Ševela, M. (2021). Improvement the processes in order production in construction industry with the orientation on processes performance. Polish Journal of Management Studies, 24(1), 407-427. Search in Google Scholar

Timilsina, S. P., Ojha, S. K., & Dhungana, B. R. (2020). Causes of delay in construction of motorable bridges under design and build model of bridge project, department of roads, Nepal. Modern Economy, 11(8), 1451-1462. Search in Google Scholar

Toor, S. U. R., & Ogunlana, S. O. (2008). Problems causing delays in major construction project in Thailand. Construction Management and Economics, 26(4), 395-408. Search in Google Scholar

Tosniwal, R. B., Vanakudari, S. U. (2018). Delay analysis and its effects in construction industry. International Research Journal of Engineering and Technology (IRJET), 5(7), 121-127. Search in Google Scholar

Tsai, S. B., Hunag, C. Y., Wang, C. K., Chen, Q., Pang, J., Wang, G., Wang, J., Chin, T. C., & Chang, L. C. (2016). Using a mixed model to evaluate job satisfaction in high-tech industries. Plos One, 11(5), 1-13. Search in Google Scholar

Vetrova, E., Doroshenko, S., Tihomirov, N., Khakimova, G., & Kakava, L. (2020). Model of investment decision-making in a small industrial enterprise. Forum Scientiae Oeconomia, 7(4), 7-23. Search in Google Scholar

Vishal, & Myneni, M. K. K. (2021). Causes and impact of delay in construction industry of India. International Journal of Engineering Technologies and Management Research, 8(1), 35-44. Search in Google Scholar

Wu, H. H., & Tsai, Y. N. (2011). A DEMATEL method to evaluate the causal relations among criteria in auto spare parts industry. Applied Mathematics and Computation, 218, 2334-2342. Search in Google Scholar

Wu, H. H., Chen, H. K., & Shieh, J. I. (2010). Evaluating performance criteria of employment service out-reach program personnel by DEMATEL method. Expert System with Application, 37, 219-5223. Search in Google Scholar

Yadav, A., Kumar, A., & Dash, M. K. (2016). Using DEMATEL to build decision model of online reputation management. In A. Kumar, & M. K. Dash (eds.), Fuzzy optimization and multi-criteria decision making in digital marketing (pp. 127–146). IGI Global. Search in Google Scholar

Yana, A. A. G. A., Rusdhi, H. A., & Wibowo, M. A. (2018). Analysis of factors affecting design changes in construction project with partial least square (PLS). International Conference of Euro Asia Civil Engineering Forum, 125, 40-45. Search in Google Scholar

Yu-jing, W. (2012). Application of system dynamics in construction project planning and control. International Conference on Business Computing and Global Informatization, 52-54. Search in Google Scholar

Zarei, B., Sharifi, H., & Chaghouee, Y. (2018). Delay causes analysis in complex construction projects, a semantic network analysis approach. Production Planning and Control, 1-27. Search in Google Scholar

Zen, Z., Atout, M., & Jones, J. (2008). Root causes of construction project delays in Dubai. Annual ARCOM Conference, 749-757. Search in Google Scholar

Zhang, D. (2020). Causes of delay in the construction projects of subway tunnel. Advanced Mathematical Risk Analysis in Civil Engineering. doi: 10.1155/2020/8883683 Open DOISearch in Google Scholar

Zidane, Y. J. T, & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Project Business. doi: 10.1108/IJMPB-05-2017-0052 Open DOISearch in Google Scholar