Open Access

Appropriate Risk Response Planning of Build Operate Transfer Contracts for the Transportation Projects in Iraq


Cite

[1] UNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW: UNCITRAL Legislative Guide on Public-Private Partnerships. UN Publication, E.20.V.2, 2020, 7 p. Search in Google Scholar

[2] KANG, C. - FENG, C. - KHAN, H.: Risk Assessment For Build-Operate-Transfer Projects: A Dynamic Multi-Objective Programming Approach. Computers & Operations Research 32, 2003, pp. 1633-1654, DOI: 10.1016/j.cor.2003.11.026. Open DOISearch in Google Scholar

[3] ACAR, M.: The Build-Operate-Transfer Model for Aerodrome Terminal Buildings. Publications of Directorate General of Civil Aviation, Publication No.: HAD/A-02, 2009, pp. 48-56. Search in Google Scholar

[4] ODEYINKA, H. – OLADAPO, A. - AKINDELE, O.: Assessing Risk Impacts on Construction Cost. The construction and building research conference of the Royal Institution of Chartered Surveyors, University College London, 2006. Search in Google Scholar

[5] Al-AZEMI, K. - BHAMRA, R. - SALMAN, A.: Risk Management Framework for Build, Operate and Transfer (BOT) Projects in Kuwait. Journal of Civil Engineering and Management, Vol. 20(3), 2014, pp. 415-433.10.3846/13923730.2013.802706 Search in Google Scholar

[6] EBRAHIMNEJAD, S. - MOUSAVI, S. - SEYRAFIANPOUR, H.: Risk Identification and Assessment for Build-Operate-Transfer Projects: A Fuzzy Multi Attribute Decision Making Model. Expert Systems with Applications International Journal, Vol. 37, 2010, pp. 575-586.10.1016/j.eswa.2009.05.037 Search in Google Scholar

[7] DEY, P. - OGUNLANA, S.: Selection and Application of Risk Management Tools and Techniques for Build-Operate-Transfer Projects. Industrial Management & Data Systems, Vol. 104, No. 4, 2004, pp. 334-346, DOI 10.1108/02635570410530748. Open DOISearch in Google Scholar

[8] TABER, K.: The Use of Cronbach’s Alpha when Developing and Reporting Research Instruments in Science Education. Res Sci Educ, Springer, Vol. 48, 2018, pp. 1273-1296, DOI 10.1007/s11165-016-9602-2. Open DOISearch in Google Scholar

[9] LAVRAKAS, P.: Encyclopaedia of Survey Research Methods. eBook, Vol. 1 & 2, 2008, 169 p.10.4135/9781412963947 Search in Google Scholar

[10] YOCKEY, R.: SPSS Demystified a Simple Guide and Reference: Third Edition. New York, NY: Routledge, 2017, pp. 100-101.10.4324/9781315268545 Search in Google Scholar

[11] GAMBO, M. - GOMEZ, C.: Project Characteristics for Design and Build Procurement in Malaysian Construction Industry. Journal of Engineering and Technology, Vol. 6, No. 1, 2015. Search in Google Scholar

[12] SCHAUFELBERGER, J.: Risk Management on Build Operate Transfer Projects. Construction Research Congress, paper 7547, 2005.10.1061/40754(183)91 Search in Google Scholar

[13] MUNGURE, M.: The Causes and Impacts of Loan Default to Microfinance Institutions: The Case of Pride Tanzania Ltd Pamba Branch- Mwanza (Mfis) Activities. A Research Dissertation Submitted in Fulfilment of the Requirements for Award of the Masters of Business Administration in Corporate Management (MBA-CM) of Mzumbe University, 2015, pp. 15-19. Search in Google Scholar

[14] LAL, S. - MATHEW, A.: Identification of Risk Factors Leading to Cost and Time Overrun in B-O-T Projects. Sustainability, Agri, Food and Environmental Research, Vol. 10, 2022.10.7770/safer-V10N1-art2466 Search in Google Scholar

[15] KASSEM, M. - KHOIRY, M. - HAMZAH, N.: Using Relative Importance Index Method for Developing Risk Map in Oil and Gas Construction Projects. Jurnal Kejuruteraan, Vol. 32(3), 2020, pp. 441-453.10.17576/jkukm-2020-32(3)-09 Search in Google Scholar

[16] MUKA, I. - WIBOWO, A.: Risk Management Process on the Property Development of NUSA DUA Resort Bali Indonesia. Civil and Environmental Engineering, Vol.17, No.1, 2021, pp.117-124, https://doi.org/10.2478/cee-2021-0013. Search in Google Scholar

[17] HUANG, M.: BOT in China: Opportunities and Challenges for Foreign Firms. A Thesis Submitted to the Department of Civil and Environmental Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil and Environmental Engineering at the Massachusetts Institute of Technology, 1999, pp. 55-67. Search in Google Scholar

[18] LLANTO, G.: Build-Operate-Transfer for Infrastructure Development: Lessons from the Philippine Experience, in Kumar, N. (ed.), International Infrastructure Development in East Asia -Towards Balanced Regional Development and Integration, ERIA Research Project Report 2007-2, Chiba: IDE-JETRO, 2008, pp. 319-359. Search in Google Scholar

[19] LIN, J.: The Conflicts and Risks in BOT Projects. A Thesis Submitted to the Department of Civil Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil Engineering at the Massachusetts Institute of Technology, 2003, pp. 67-77. Search in Google Scholar

[20] KREYDIEH, A.: Risk Management in BOT Project Financing. A Thesis Submitted to the Department of Civil and Environmental Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil and Environmental Engineering at the Massachusetts Institute of Technology, 1996, pp. 31-43. Search in Google Scholar

[21] KHAHRO, S. - ALI, T. - MEMON, N. - AKHUND, M.: Effect of Change Orders on Project Duration. IJCIET, Vol. 8, Iss. 6, 2017, pp. 484-490. Search in Google Scholar

[22] JANGALE, S. -SURYAWANSHI, A.: Risk Assessment in BOT Project Financing. IJERT, Vol. 3, Iss. 6, 2014. Search in Google Scholar

[23] HSIAO, H.: Risk Management in BOT Project. A Thesis Submitted to the Department of Civil and Environmental Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil and Environmental Engineering at the Massachusetts Institute of Technology, 2000, p. 63. Search in Google Scholar

[24] RASHEED, E.: Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq. Journal of Engineering, Vol. 21, No. 4, 2015.10.31026/j.eng.2015.04.10 Search in Google Scholar

[25] SHADHAR, A. - MAHMOOD, B.: Risks of Design Stage in Iraqi Construction Project. Journal of Engineering, Vol. 24, No. 3, 2018.10.31026/j.eng.2018.03.09 Search in Google Scholar

eISSN:
2199-6512
Language:
English