[1. Aven, T. (2016), “Risk assessment and risk management: review of recent advances on their foundation”, European Journal of Operational Research, Vol. 253, No. 1, pp. 1-13.10.1016/j.ejor.2015.12.023]Search in Google Scholar
[2. Baccarini, D., Archer, R. (2001), “The risk ranking of projects: a methodology”, International Journal of Project Management, Vol. 19, No. 3, pp. 139-145.10.1016/S0263-7863(99)00074-5]Search in Google Scholar
[3. Chauhan, A. S., Nepal, B., Soni, G., Rathore, A. P. S. (2018), “Examining the state of risk management research in new product development process”, Engineering Management Journal, Vol. 30, No. 2, pp. 85-97.10.1080/10429247.2018.1446120]Search in Google Scholar
[4. de Araújo Lima, P. F., Crema, M., Verbano, C. (2019), „Risk management in SMEs: a systematic literature review and future directions”, European Management Journal, Vol. 38, No. 1, pp. 78-94.10.1016/j.emj.2019.06.005]Search in Google Scholar
[5. Ferdous, R., Khan, F., Sadiq, R., Amyotte, P., Veitch, B. (2011), “Fault and event tree analyses for process systems risk analysis: uncertainty handling formulations”, Risk Analysis, Vol. 31, No. 1, pp. 86-107.10.1111/j.1539-6924.2010.01475.x]Search in Google Scholar
[6. Krane, H. P., Rolstadås, A., Olsson, N. O. E. (2010), “Categorizing risks in seven large projects – Which risks do the projects focus on?” Project Management Journal, Vol. 41, No. 1, pp. 81-86.10.1002/pmj.20154]Search in Google Scholar
[7. Levine, E. S. (2012), “Improving risk matrices: the advantages of logarithmically scaled axes”, Journal of Risk Research, Vol. 15, No. 2, pp. 209-222.10.1080/13669877.2011.634514]Search in Google Scholar
[8. Li, J., Bao, C., Wu, D. (2018), “How to design rating schemes of risk matrices: a sequential updating approach”, Risk Analysis, Vol. 38, No. 1, pp. 99-117.10.1111/risa.12810]Search in Google Scholar
[9. Markowski, A. S., Sam Mannan, M. (2008), “Fuzzy risk matrix”, Journal of Hazardous Materials, Vol. 159, No. 1, pp. 152-157.10.1016/j.jhazmat.2008.03.055]Search in Google Scholar
[10. Merritt, G. M., Smith, P. G. (2004), “Techniques for managing project risk”, in Cleland, D. I. (Ed.), Field Guide to Project Management, 2nd edn., John Wiley & Sons, New Jersey, pp. 202-218.10.1002/9780470172346.ch13]Search in Google Scholar
[11. Ni, H., Chen, A., Chen, N. (2010), “Some extensions on risk matrix approach”, Safety Science, Vol. 48, No. 10, pp. 1269-1278.10.1016/j.ssci.2010.04.005]Search in Google Scholar
[12. Project Management Institute. (2017), A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 6th edn., PMI, Pennsylvania.]Search in Google Scholar
[13. Smith, P. G., Merritt, G. M. (2002), Proactive Risk Management: Controlling Uncertainty in Product Development, CRC Press, New York.]Search in Google Scholar
[14. Tonchia, S. (2018). Industrial Project Management: International Standards and Best Practices for Engineering and Construction Contracting, 2nd edn., Springer-Verlag Berlin.]Search in Google Scholar