Open Access

Engineering project management based on multiple regression equation and building information modelling technology


Cite

Son, A., Shin, J. Y., & Moon, H. S. BIM Platform Resource Management for BaaS (BIM as a Service) in Distributed Cloud Computing. Journal of KIBIM., 2020. 10(3): 43–53. SonA. ShinJ. Y. MoonH. S. BIM Platform Resource Management for BaaS (BIM as a Service) in Distributed Cloud Computing Journal of KIBIM 2020 10 3 43 53 Search in Google Scholar

Alasfour, F. S., & Mirzal, A. Impact of Project Management on Project Success at Engineering Firms in Kuwait. International Journal of Project Management and Productivity Assessment (IJPMPA)., 2021. 9(2): 68–89. AlasfourF. S. MirzalA. Impact of Project Management on Project Success at Engineering Firms in Kuwait International Journal of Project Management and Productivity Assessment (IJPMPA) 2021 9 2 68 89 Search in Google Scholar

Alasfour, F. S., & Mirzal, A. Impact of Project Management on Project Success at Engineering Firms in Kuwait. International Journal of Project Management and Productivity Assessment (IJPMPA)., 2021. 9(2): 68–89. AlasfourF. S. MirzalA. Impact of Project Management on Project Success at Engineering Firms in Kuwait International Journal of Project Management and Productivity Assessment (IJPMPA) 2021 9 2 68 89 Search in Google Scholar

Mohsenijam, A., & Lu, M. Framework for developing labour-hour prediction models from project design features: case study in structural steel fabrication. Canadian Journal of Civil Engineering., 2019. 46(10): 871–880. MohsenijamA. LuM. Framework for developing labour-hour prediction models from project design features: case study in structural steel fabrication Canadian Journal of Civil Engineering 2019 46 10 871 880 Search in Google Scholar

Badi, S., Ochieng, E., Nasaj, M., & Papadaki, M. Technological, organisational and environmental determinants of smart contracts adoption: UK construction sector viewpoint. Construction Management and Economics., 2021. 39(1): 36–54. BadiS. OchiengE. NasajM. PapadakiM. Technological, organisational and environmental determinants of smart contracts adoption: UK construction sector viewpoint Construction Management and Economics 2021 39 1 36 54 Search in Google Scholar

Tian, J., & He, G. The five-in-one teaching mode in the teaching of engineering courses. Computer Applications in Engineering Education., 2020. 28(6): 1683–1695. TianJ. HeG. The five-in-one teaching mode in the teaching of engineering courses Computer Applications in Engineering Education 2020 28 6 1683 1695 Search in Google Scholar

Yarramsetty, S., Rohullah, M. S., & Sivakumar, M. V. N. An investigation on energy consumption in residential building with different orientation: A BIM approach. Asian Journal of Civil Engineering., 2020. 21(2): 253–266. YarramsettyS. RohullahM. S. SivakumarM. V. N. An investigation on energy consumption in residential building with different orientation: A BIM approach Asian Journal of Civil Engineering 2020 21 2 253 266 Search in Google Scholar

Elmousalami, H. H. Comparison of artificial intelligence techniques for project conceptual cost prediction: a case study and comparative analysis. IEEE Transactions on Engineering Management., 2020. 68(1): 183–196. ElmousalamiH. H. Comparison of artificial intelligence techniques for project conceptual cost prediction: a case study and comparative analysis IEEE Transactions on Engineering Management 2020 68 1 183 196 Search in Google Scholar

Iglesias Martínez, M., Antonino-Daviu, J., de Córdoba, P. & Conejero, J. Higher-Order Spectral Analysis of Stray Flux Signals for Faults Detection in Induction Motors. Applied Mathematics and Nonlinear Sciences., 2020. 5(2): 1–14. Iglesias MartínezM. Antonino-DaviuJ. de CórdobaP. ConejeroJ. Higher-Order Spectral Analysis of Stray Flux Signals for Faults Detection in Induction Motors Applied Mathematics and Nonlinear Sciences 2020 5 2 1 14 Search in Google Scholar

Ruiz-Fernández, J., Benlloch, J., López, M. & Valverde-Gascueña, N. Influence of seasonal factors in the earned value of construction. Applied Mathematics and Nonlinear Sciences., 2019. 4(1): 21–34. Ruiz-FernándezJ. BenllochJ. LópezM. Valverde-GascueñaN. Influence of seasonal factors in the earned value of construction Applied Mathematics and Nonlinear Sciences 2019 4 1 21 34 Search in Google Scholar

Skitmore, M., Xiong, B., Xia, B., Masrom, A., & Newton, S. Relationship between contractor satisfaction and project management performance. Construction Economics and Building., 2020. 20(4): 1–24. SkitmoreM. XiongB. XiaB. MasromA. NewtonS. Relationship between contractor satisfaction and project management performance Construction Economics and Building 2020 20 4 1 24 Search in Google Scholar

Daslim, S., & Mursadin, A. A Control Model for Reinforced Concrete Work Materials on the Construction of Duta Mall 2. Eng. Technol. Appl. Sci. Res., 2020. 10(2): 5483–5486. DaslimS. MursadinA. A Control Model for Reinforced Concrete Work Materials on the Construction of Duta Mall 2 Eng. Technol. Appl. Sci. Res 2020 10 2 5483 5486 Search in Google Scholar

Sanni-Anibire, M. O., Zin, R. M., & Olatunji, S. O. Developing a machine learning model to predict the construction duration of tall building projects. Journal of Construction Engineering., 2021. 4(1): 022–036. Sanni-AnibireM. O. ZinR. M. OlatunjiS. O. Developing a machine learning model to predict the construction duration of tall building projects Journal of Construction Engineering 2021 4 1 022 036 Search in Google Scholar

eISSN:
2444-8656
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Life Sciences, other, Mathematics, Applied Mathematics, General Mathematics, Physics