Figure 1.

Typical floor plan of the case study building (as a student housing before the conversion)
Typical floor plan of the case study building (as a student housing before the conversion)

Figure 2.

Typical floor plan of the case study building (as an office building after the conversion)
Typical floor plan of the case study building (as an office building after the conversion)

Mean responses and rate of satisfaction of the functional elements of performance

Functional elements of performance Evaluation terms Mean response Satisfaction rate
SS S D SD
Interior and exterior finishes 2.60 S
1. Quality of the building’s exterior finishes 2 25 10 3 2.65 S
2. Quality of floor finishes of offices 6 22 8 4 2.75 S
3. Quality of wall finishes of offices 7 16 11 6 2.60 S
4. Quality of ceiling finishes of offices 7 20 9 4 2.75 S
5. Quality of floor finishes of corridors 2 20 14 4 2.50 S
6. Quality of wall finishes of corridors 3 23 11 3 2.65 S
7. Quality of ceiling finishes of corridors 3 22 10 5 2.58 S
8. Quality of floor finishes of stairs 3 18 15 4 2.50 S
9. Quality of finishes in toilets 2 17 17 4 2.43 D
Furniture 3.05 S
10. Quality of desks in offices 9 19 7 5 2.80 S
11. Quality of chairs in offices 6 17 11 6 2.58 S
12. Adequacy of chairs provided in offices 7 20 9 4 2.75 S
13. Quality of storage cabinets provided in offices 7 19 11 3 2.75 S
14. Adequacy of storage cabinets provided in offices 7 23 8 2 2.88 S
Distribution and layout of offices 2.99 S
15. Distribution of offices throughout the building 3 18 14 5 2.48 D
16. Layout of furniture within offices and efficiency of space utilization 4 20 11 5 2.58 S
17. Width of corridors throughout the building 6 17 15 2 2.68 S
Information technologies and power distribution 2.81 S
18. Quality of information and telecommunication technologies in the building 9 20 5 6 2.80 S
19. Adequacy of socket outlets in offices 11 15 11 3 2.85 S
Car parking 2.65 S
20. Adequacy of car parking for users 26 8 5 1 3.48 S
21. Proximity of car parking to the building 23 8 8 1 3.33 S
Other amenities 2.18 D
22. Quality and adequacy of lounges and seating areas 3 4 16 17 1.83 D
23. Quality and adequacy of elevators in the building 12 18 6 4 2.95 S
24. Quality and adequacy of cafeterias and tea/coffee rooms 3 6 10 21 1.78 D

Mean responses and rate of satisfaction of the technical elements of performance

Technical elements of performance Evaluation terms Mean response Satisfaction rate
SS S D SD
Thermal comfort 3.17 S
1. Temperature inside the building 16 23 1 0 3.38 S
2. Air movement inside the building 10 21 9 0 3.03 S
3. Air humidity inside the building 13 19 7 1 3.10 S
Visual comfort 3.05 S
4. Adequacy of lighting levels at the offices 19 12 9 0 3.25 S
5. Adequacy of lighting levels at the corridors 12 21 6 1 3.10 S
6. Adequacy of light levels at the stairs 6 18 14 2 2.70 S
7. Control over glare at the offices 14 20 4 2 3.15 S
Acoustical comfort 2.99 S
8. Level of noise within offices 11 20 6 3 2.98 S
9. Sense of privacy of conversation at the offices 12 14 12 2 2.90 S
10. Level of noise generated from office equipment 15 19 5 1 3.20 S
11. Level of noise generated from HVAC systems 8 22 8 2 2.90 S
Indoor air quality 2.81 S
12. Quality of air inside the offices 14 18 7 1 3.13 S
13. Quality of air throughout the corridors 5 19 14 2 2.68 S
14. Quality of air inside stairwells 4 17 14 5 2.50 S
15. Overall quality of air throughout the building 7 25 7 1 2.95 S
16. Smell of dust in the air 11 16 11 2 2.90 S
17. Foul odors in the air 9 15 12 4 2.73 S
Fire safety 2.65 S
18. Adequacy of fire exits 12 14 8 6 2.80 S
19. Clarity of fire exits 8 17 8 7 2.65 S
20. Adequacy and clarity of exit signs 4 14 15 7 2.38 D
21. Adequacy and clarity of evacuation plans 4 8 16 12 2.10 D
22. Adequacy and clarity of fire extinguishers 9 23 5 3 2.95 S
23. Ease of identifying the locations of alarm bells 11 22 3 4 3.00 S
Plumbing services 2.74 S
24. Water pressure at plumbing fixtures 8 19 6 7 2.70 S
25. Distribution of toilets throughout the building 8 17 11 4 2.73 S
26. Adequacy of toilets in the building 10 18 6 6 2.80 S

The assigned ranges, calibration and weight of each satisfaction rate

Satisfaction rate Corresponding weight Calibration
Strongly Satisfied 4 3.50–4
Satisfied 3 2.50-3.49
Dissatisfied 2 1.50-2.49
Strongly Dissatisfied 1 0-1.49
eISSN:
1899-0142
Language:
English
Publication timeframe:
4 times per year
Journal Subjects:
Architecture and Design, Architecture, Architects, Buildings