[Alaghbari, W., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. https://doi.org/10.1108/0969998071073130810.1108/09699980710731308]Open DOISearch in Google Scholar
[Al-Khalil, M. I., & Al-Ghafly, M. A. (1999). Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), 647-655. https://doi.org/10.1080/01446199937125910.1080/014461999371259]Open DOISearch in Google Scholar
[Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International Journal of Project Management, 18(1), 51-59. https://doi.org/10.1016/s0263-7863(98)00060-x10.1016/s0263-7863(98)00060-x]Open DOISearch in Google Scholar
[Arditi, D., Akan, G. T., & Gurdamar, S. (1985). Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), 171-181. https://doi.org/10.1080/0144619850000001310.1080/01446198500000013]Open DOISearch in Google Scholar
[Arditi, D., & Robinson, M. A. (1995). Concurrent Delays in Construction Litigation. Cost Engineering Journal, AACE International, 37(7), 20-31.]Search in Google Scholar
[Asim, M., Deep, S., & Dr. Aqeel, S. A. (2017). Time Impact Study of Real Estate Sector Construction Projects Post Application of Lean Principles for Delay Resolutions. International Journal of Civil Engineering and Technology, 8(2), 89-99.]Search in Google Scholar
[Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. https://doi.org/10.1016/j.ijproman.2005.11.01010.1016/j.ijproman.2005.11.010]Open DOISearch in Google Scholar
[Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of Delay in Large Building Construction Projects. Journal of Management in Engineering, 11(2), 45-50. https://doi.org/10.1061/(asce)0742-597x(1995)11:2(45)10.1061/(asce)0742-597x(1995)11:2(45]Open DOISearch in Google Scholar
[Baldwin, J. R., Mathei, J. M., Rothbart, H., & Harris, R. B. (1971). Causes of Delay in the Construction Industry. Journal of Construction Division, 97(2), 177-187.10.1061/JCCEAZ.0000305]Search in Google Scholar
[Barker, R., Childerhouse, P., Naim, M., Masat, J., & Wilson, D. (2004). Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(2), 177-187. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(177)10.1061/(ASCE)0733-9364(2004)130:2(177]Open DOISearch in Google Scholar
[Chang, A. S., Shen, F.-Y., & Ibbs, W. (2010). Design and construction coordination problems and planning for design-build project new users. Canadian Journal of Civil Engineering, 37(12), 1525-1534. https://doi.org/10.1139/l10-09010.1139/L10-090]Open DOISearch in Google Scholar
[Deep, S., Singh, D., & Ahmad, S. A. (2017). A Review of Contract Awards to Lowest Bidder in Indian Construction Projects via Case Based Approach. Open Journal of Business and Management, 05(01), 159-168. https://doi.org/10.4236/ojbm.2017.5101510.4236/ojbm.2017.51015]Open DOISearch in Google Scholar
[Dlakwa, M. M., & Culpin, M. F. (1990). Reasons for overrun in public sector construction projects in Nigeria. International Journal of Project Management, 8(4), 237-241. https://doi.org/10.1016/0263-7863(90)90032-710.1016/0263-7863(90)90032-7]Open DOISearch in Google Scholar
[Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. https://doi.org/10.1016/j.ijproman.2011.10.00410.1016/j.ijproman.2011.10.004]Open DOISearch in Google Scholar
[Etges, B., Saurin, T. A., & Bulhões, I. R. (2012). “Identifying lean construction categories of practices in IGLC proceedings.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, International Group for Lean Construction (IGLC), Oslo, Norway]Search in Google Scholar
[Gao, S. & Low, S. P. (2014). Lean Construction Management. http://dx.doi.org/10.1007/978-981-287-014-810.1007/978-981-287-014-8]Open DOISearch in Google Scholar
[Gibson, G. E., Wang, Y.-R., Cho, C.-S., & Pappas, M. P. (2006). What Is Preproject Planning, Anyway? Journal of Management in Engineering, 22(1), 35-42. https://doi.org/10.1061/(asce)0742-597x(2006)22:1(35)10.1061/(asce)0742-597x(2006)22:1(35]Open DOISearch in Google Scholar
[Gonzalez, V., Alarcon, L. F., & Mundaca, F. (2008). Investigating the relationship between planning reliability and project performance. Production Planning & Control, 19(5), 461-474. https://doi.org/10.1080/0953728080205902310.1080/09537280802059023]Open DOISearch in Google Scholar
[Hanna, A. S., & Skiffington, M. A. (2010). Effect of Preconstruction Planning Effort on Sheet Metal Project Performance. Journal of Construction Engineering and Management, 136(2), 235-241. https://doi.org/10.1061/(asce)0733-9364(2010)136:2(235)10.1061/(asce)0733-9364(2010)136:2(235]Open DOISearch in Google Scholar
[Kazaz, A., Ulubeyli, S., & Tuncbilekli, N. A. (2012). Causes of Delays in Construction Projects in Turkey. Journal of Civil Engineering and Management, 18(3), 426-435. https://doi.org/10.3846/13923730.2012.69891310.3846/13923730.2012.698913]Open DOISearch in Google Scholar
[LCI. (2013). “Lean project design and delivery in action.” Retrieved May 10, 2013, from http://www.leanconstruction.org/.]Search in Google Scholar
[LCI. (2014). “LCI lean project delivery glossary.” Retrieved May 12, 2014, from http://www.leanconstruction.org.]Search in Google Scholar
[LCI. (2015). “What is lean design and construction?” Retrieved May 20, 2015, from http://www.leanconstruction.org/.]Search in Google Scholar
[Lovejoy, V. A. (2004). Claims Schedule Development and Analysis: Collapsed As-built Schedule for Beginners. Cost Engineering Journal, AACE International, 46(1), 27-30.]Search in Google Scholar
[Lowsley, S., & Linnett, C. (2006). About Time: Delay Analysis in Construction. RICS Business Services Limited.]Search in Google Scholar
[Iyer, K. C., & Jha, K. N. (2006). Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management, ASCE, 132(8), 871-881.10.1061/(ASCE)0733-9364(2006)132:8(871)]Search in Google Scholar
[Nesensohn, C., Demir, S. T., & Bryde, D. J. (2012). “Developing a ‘true north’ best practice lean company with navigational compass.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, International Group for Lean Construction (IGLC), Oslo, Norway.]Search in Google Scholar
[Thomas, H. R., & Ellis, R. D. (2007). Contractor Prebid Planning Principles. Journal of Construction Engineering and Management, 133(8), 542-552. https://doi.org/10.1061/(asce)0733-9364(2007)133:8(542)10.1061/(ASCE)0733-9364(2007)133:8(542)]Search in Google Scholar
[Yang, J.-B., & Wei, P.-R. (2010). Causes of Delay in the Planning and Design Phases for Construction Projects. Journal of Architectural Engineering, 16(2), 80-83. https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)10.1061/(asce)1076-0431(2010)16:2(80]Open DOISearch in Google Scholar
[Yang, L.-R., Chen, J.-H., & Huang, C.-F. (2012). Requirements Definition and Management Practice to Improve Project Outcomes. Journal of Civil Engineering and Management, 18(1), 114-124. https://doi.org/10.3846/13923730.2012.65734010.3846/13923730.2012.657340]Open DOISearch in Google Scholar