This work is licensed under the Creative Commons Attribution 4.0 International License.
Abdul Rashid, R., Mat Taib, I., Wan Ahmad, W. B., Nasid, M. A., Wan Ali, W. N., & Mohd Zainordin, Z. (2006). Effect of procurement systems on the performance of construction projects. In: Conference, June 21-24, Padang, Indonesia, pp. 1–13.Abdul RashidR.Mat TaibI.Wan AhmadW. B.NasidM. A.Wan AliW. N.Mohd ZainordinZ. (2006). . In: Conference, June 21-24, Padang, Indonesia, pp. 1–13.Search in Google Scholar
Alaeddin, G., & Nuhu, B. (2016). The impact of design-bid-build procurement methods on project performance in Libya. KICEM Journal of Construction Engineering and Project Management, 6(2), pp. 16–23.AlaeddinG.NuhuB. (2016). The impact of design-bid-build procurement methods on project performance in Libya. , 6(2), pp. 16–23.Search in Google Scholar
Alhazmi, T., & McCaffer, R. (2000). Procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176–184.AlhazmiT.McCafferR. (2000). Procurement system selection model. , 126(3), pp. 176–184.Search in Google Scholar
Ameyaw, C. (2009). Comparative performance evaluation of the traditional design-bid-build(DBB) and design-build (DB) procurement systems in Ghana. B.Sc. in quantity surveying dissertation, Federal University of Technology, Akure, Ghana.AmeyawC. (2009). , Federal University of Technology, Akure, Ghana.Search in Google Scholar
Ashworth, A. (2001). Contractual Procedures in the Construction Industry, 4th edn. Longman, England.AshworthA. (2001). , 4th edn. Longman, England.Search in Google Scholar
Barkley, B., & Saylor, J. (1994). Customer-Driven Project Management. McGraw-Hill, New York, USA.BarkleyB.SaylorJ. (1994). . McGraw-Hill, New York, USA.Search in Google Scholar
Caccamese, A., & Bragantini, D. (2012). Beyond the iron triangle: Year zero. In: Project Management Institute Global Congress Proceedings, May 9. Project Management Institute, Marseille, France.CaccameseA.BragantiniD. (2012). Beyond the iron triangle: Year zero. In: , May9. Project Management Institute, Marseille, France.Search in Google Scholar
Chandrashekhar, R. P., & Mahaboobali, N. (2017). Study on procurement method selection procedure in construction industry. International Research Journal of Engineering and Technology, 4(8), pp. 340–348.ChandrashekharR. P.MahaboobaliN. (2017). Study on procurement method selection procedure in construction industry. , 4(8), pp. 340–348.Search in Google Scholar
Ghulam, A. N., & Noel, P. (2015). Comparative performance evaluation of design-build and traditional procurement systems for highway projects in Afghanistan. In: Proceeding of the 6th International Conference on Engineering, Project, and Production Management, September 2-10. Griffiths University, Queensland, Australia.GhulamA. N.NoelP. (2015). Comparative performance evaluation of design-build and traditional procurement systems for highway projects in Afghanistan. In: , September2-10. Griffiths University, Queensland, Australia.Search in Google Scholar
Hogg, K., & Morledge, R. (1995). Risks and design and build: Keeping meaningful perspective. Chartered Surveyor Monthly, 14(7), pp. 32–33.HoggK.MorledgeR. (1995). Risks and design and build: Keeping meaningful perspective. , 14(7), pp. 32–33.Search in Google Scholar
Ling, Y. Y., Lok, S., & Tan, E. S. (2001). Design-Build Projects: A Comparison of Views between South Australia and Singapore. CIB World Building Congress, Wellington, New Zealand, April 1-11.LingY. Y.LokS.TanE. S. (2001). . CIB World Building Congress, Wellington, New Zealand, April1-11.Search in Google Scholar
Luis, F. A., Rodrigo, R., & Alfredo, S. (1999). Evaluation and improvement of the procurement process in construction projects. In: Proceedings IGLC-7. University of California, Berkeley, USA, July 26-28.LuisF. A.RodrigoR.AlfredoS. (1999). Evaluation and improvement of the procurement process in construction projects. In: . University of California, Berkeley, USA, July26-28.Search in Google Scholar
Masterman, J. W. (2002). An Introduction to Building Procurement, 2nd edn. Spon Press, New York.MastermanJ. W. (2002). , 2nd edn. Spon Press, New York.Search in Google Scholar
Mohd, N. M. N., Nazim, B., & Ahmad, Y. B. (2014). Impact of fragmentation issue in construction industry: An overview. In proceedings of MATEC Web of Conferences, 15(01009), 1–8.MohdN. M. N.NazimB.AhmadY. B. (2014). Impact of fragmentation issue in construction industry: An overview. In , 15(01009), 1–8.Search in Google Scholar
Musirikare, M. A., & Kure, W. J. (2016). Delay factors in building construction projects in Rwanda. ABC Journal of Advanced Research, 5(1), pp. 21–34.MusirikareM. A.KureW. J. (2016). Delay factors in building construction projects in Rwanda. , 5(1), pp. 21–34.Search in Google Scholar
Musoni, N., Gwaya, A., & Wanyona, G. (2020). Influence of procurement systems on construction projects in Rwanda. International Journal of Innovative Science and Modern Engineering, 6(5), pp. 6–12.MusoniN.GwayaA.WanyonaG. (2020). Influence of procurement systems on construction projects in Rwanda. , 6(5), pp. 6–12.Search in Google Scholar
Office of the Auditor General of State Finances. (2018). Report of the auditor of state finances for the year ended, Rwanda. Available at https//www.oag.gov.rw/fileadmin/user-upload/ Financial reports/AnnualReport-june-2017-ExecutieSummary.pdf [accessed 30 June, 2017].Office of the Auditor General of State Finances. (2018). . Available at https://www.oag.gov.rw/fileadmin/user-upload/Financialreports/AnnualReport-june-2017-ExecutieSummary.pdf [accessed 30 June, 2017].Search in Google Scholar
Oladinrin, O. T., Olatunji, S. O., & Hamza, B. T. (2013). Effect of selected procurement systems on building project performance in Nigeria. International Journal of Sustainable Construction Engineering and Technology, 4(1), pp. 48–62.OladinrinO. T.OlatunjiS. O.HamzaB. T. (2013). Effect of selected procurement systems on building project performance in Nigeria. , 4(1), pp. 48–62.Search in Google Scholar
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute, Newton Square, USA.Project Management Institute. (2013). . Project Management Institute, Newton Square, USA.Search in Google Scholar
Ron, W. (2012). Changing the construction procurement culture to improve project outcomes. In: International Conference on Facilities Management, Procurement Systems and Public Private Partnerships, CIB W070, W092 AND TG72, January 25, Cape Town, South Africa.RonW. (2012). Changing the construction procurement culture to improve project outcomes. In: , CIB W070, W092 AND TG72, January 25, Cape Town, South Africa.Search in Google Scholar
Sanvido, V., Konchar, M., & Moore, S. (1997). Comparison of project delivery systems. In: ASCE Construction Congress Proceedings, October 5. American Society of Civil Engineers, Minnesota, United State.SanvidoV.KoncharM.MooreS. (1997). Comparison of project delivery systems. In: , October5. American Society of Civil Engineers, Minnesota, United State.Search in Google Scholar
Smith, M. A., Hoetzlein, S., & Adsit, R. A. (1992). Design/build. Landscape Architecture, 82(11), pp. 18–20.SmithM. A.HoetzleinS.AdsitR. A. (1992). Design/build. , 82(11), pp. 18–20.Search in Google Scholar
Tarek, H. (2002). Computer Based Construction Project Management. Prentice Hall, Ohio.TarekH. (2002). . Prentice Hall, Ohio.Search in Google Scholar
Tavakol, M and Dennick, R. (2011). Making Sense of Cronbach’s Alpha. International Journal of Medical Education, 2, 53–55.TavakolMDennickR. (2011). Making Sense of Cronbach’s Alpha. , 2, 53–55.Search in Google Scholar
Umuhoza, E., & An, S. H. (2019). Delay factors in building construction projects in Rwanda. Journal of Korea Institute of Building Construction, 19(5), pp. 467–475.UmuhozaE.AnS. H. (2019). Delay factors in building construction projects in Rwanda. , 19(5), pp. 467–475.Search in Google Scholar
Umuhoza, E., Bitamba, B. F., & An, S. H. (2021). Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, pp. 1–12. Available at https://doi.org/10.1080/15623599.2021.1967576 [Accessed 23 August 2021]UmuhozaE.BitambaB. F.AnS. H. (2021). Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. , pp. 1–12. Available at https://doi.org/10.1080/15623599.2021.1967576 [Accessed 23 August 2021]Search in Google Scholar
Yamane, T. (1973). Statistics: An Introductory Analysis, 3rd edn. Harper and Row, New York.YamaneT. (1973). , 3rd edn. Harper and Row, New York.Search in Google Scholar
Yates, J., & Eskander, A. (2002). Construction total project management planning issues. International Journal of Project Management, 33(1), pp. 37–48.YatesJ.EskanderA. (2002). Construction total project management planning issues. , 33(1), pp. 37–48.Search in Google Scholar